Jane May, P.Eng.

Project Engineer at Lorax Environmental Services Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
CA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Canadian Securities Course (Honours)
    Canadian Securities Institute
    Nov, 2016
    - Nov, 2024
  • Emergency First Aid for Industry (OFA Level 1 Equivalent)
    St. John Ambulance BC/ Yukon
    May, 2022
    - Nov, 2024
  • Professional Engineer (P.Eng.)
    Engineers and Geoscientists BC

Experience

    • Canada
    • Environmental Services
    • 1 - 100 Employee
    • Project Engineer
      • Jul 2013 - Present

      - Regulatory permitting of active and semi-passive water treatment systems for mining and LNG projects in B.C., Yukon, and internationally - Experimental design and analysis of test work studies for treatment systems (lab-scale to full-scale) - Best achievable technology assessments and design alternative analysis for various target parameters - Treatment performance studies - Carbon sequestration analysis, technologies, and carbon accounting/offset verification - Environmental management plan development - Environmental monitoring program development - Water quality and air quality analysis, including QA/QC analysis and annual WQ reporting - Evaluation of beneficial re-use options for industrial waste products - Database management - Development of international HSE management systems to meet IFC performance standards - Technical writing - Project management - Treatment vendor liaison - Domestic and international site visits (e.g., Egypt, Kyrgyzstan) Show less

    • Canada
    • Oil and Gas
    • 700 & Above Employee
    • Oil Sands Infrastructure Engineering Student
      • May 2012 - Aug 2012

      - Effectively managed three projects at Pelican Lake site, including water well drilling for a water treatment plant, installment of a new security gatehouse along with road upgrades, and generator configuration design. - Coordinated with field employees, contractors, consultants, and internal departments to ensure projects continually met or exceeded budget and schedule targets. - Site visit to Foster Creek project. - Effectively managed three projects at Pelican Lake site, including water well drilling for a water treatment plant, installment of a new security gatehouse along with road upgrades, and generator configuration design. - Coordinated with field employees, contractors, consultants, and internal departments to ensure projects continually met or exceeded budget and schedule targets. - Site visit to Foster Creek project.

    • Canada
    • Utilities
    • 700 & Above Employee
    • Mains Replacement Pipeline Engineering Student
      • May 2011 - Aug 2011

      - Performed extensive pipeline vintage analysis using Microsoft Access and GIS mapping software to identify regions of high leak frequency per unit area, regions of high severity leaks, and regions with the most brittle (PVC or black polyethylene) and dated pipe. - Applied a pipeline integrity demerit points system to prioritize regions for replacement in Calgary and Edmonton from which executive management selected projects for the upcoming year. - Performed all pipeline retirement calculations for Black Diamond project. - Chaired internal team meetings in project manager's absence. Show less

  • Nexen
    • Calgary, AB
    • Regulatory Affairs & Community Consultation Engineering Student
      • May 2010 - Aug 2010

      - Conducted a life cycle analysis of Nexen’s Long Lake project to develop a visual representation of the forecasted land disturbance footprint compared to the actual footprint of the site to date. - Researched and analyzed data on all major (>10,000 bbl/day) industry SAGD projects based on several parameters, such as steam-to-oil ratio (SOR), first bitumen production, capital cost etc. for benchmarking purposes. - Site visits to Long Lake project. - Conducted a life cycle analysis of Nexen’s Long Lake project to develop a visual representation of the forecasted land disturbance footprint compared to the actual footprint of the site to date. - Researched and analyzed data on all major (>10,000 bbl/day) industry SAGD projects based on several parameters, such as steam-to-oil ratio (SOR), first bitumen production, capital cost etc. for benchmarking purposes. - Site visits to Long Lake project.

Education

  • The University of British Columbia
    Bachelor of Applied Science (B.A.Sc.), Chemical Engineering
  • Quantic School of Business and Technology
    Executive Master of Business Administration (MBA) Candidate

Community

You need to have a working account to view this content. Click here to join now