Jamie McGill

CAD Co-ordinator at Balfour Beatty Kilpatrick
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Newarthill, Scotland, United Kingdom, GB

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Construction
    • 300 - 400 Employee
    • CAD Co-ordinator
      • Sep 2018 - Present

    • United Kingdom
    • Construction
    • 700 & Above Employee
    • CAD Co-ordinator
      • Sep 2018 - Present

    • France
    • IT Services and IT Consulting
    • 700 & Above Employee
    • CAD Operator
      • Aug 2015 - Dec 2017

    • CAD Technician
      • Mar 2015 - Apr 2015

    • CAD Technician
      • Feb 2015 - Feb 2015

      Short term contract at this very active and highly sought after company. Very fine detailed drawings required in tight timescales due to amount of work being done. Completed numerous elevations both internal and external along with reverse ceiling plans. Short term contract at this very active and highly sought after company. Very fine detailed drawings required in tight timescales due to amount of work being done. Completed numerous elevations both internal and external along with reverse ceiling plans.

    • United States
    • Industrial Machinery Manufacturing
    • CAD Technician
      • Aug 2014 - Oct 2014

      Added detail and amended detail on numerous projects within my short period at the company. High attention to detailed was required while jumping between different projects. Added detail and amended detail on numerous projects within my short period at the company. High attention to detailed was required while jumping between different projects.

    • United Kingdom
    • Architecture and Planning
    • 200 - 300 Employee
    • Technician
      • Aug 2014 - Aug 2014

      Responsible for completing Revit drawings of building contracts and detailed Revit drawings of sections through certain walls & windows. Responsible for completing Revit drawings of building contracts and detailed Revit drawings of sections through certain walls & windows.

    • Cad Technician
      • Jun 2012 - Aug 2012

      The responsibilities on this job was similar to those at Scottish Water, the only difference here was I was primaraly dealing with designing drawing of the pipe installations.Multi-tasking throughout this position also so had to manage different projects to keep up with tight deadlines and time scales. The responsibilities on this job was similar to those at Scottish Water, the only difference here was I was primaraly dealing with designing drawing of the pipe installations.Multi-tasking throughout this position also so had to manage different projects to keep up with tight deadlines and time scales.

    • Section Leader
      • Nov 2009 - Sep 2010

      Rapidly promoted due to my previous work experience in the industry before. I was trusted to look after the department and it's employees in a managers absence, this was a lot of responsibility along with attending managerial meetings in the managers absence.Due to pressure of university I had to give it up after a short time to focus my time and effects towards university. Rapidly promoted due to my previous work experience in the industry before. I was trusted to look after the department and it's employees in a managers absence, this was a lot of responsibility along with attending managerial meetings in the managers absence.Due to pressure of university I had to give it up after a short time to focus my time and effects towards university.

    • CAD Technician
      • Apr 2007 - Jul 2009

      In this position my duties and tasks consisted of being given a quick sketch of water pipe installations being installed or previously install into the ground and turning them into detailed 2D AutoCAD drawings.Along with this I was given photos of the installation and all the other relevant paperwork or equipment installed in order for me to create and complete a "Handback Pack" which was electronically sent to the project manager and also a hard copy was printed out for my own records. There was well over 200 of these packs to complete within a fairly right time scale while having to report and attend weekly meetings with my line manager and project manager.

    • Shopfloor Assistant
      • Apr 2004 - Mar 2007

      Replenished shopfloor stock, dealt with customer enquiries and reduced less than satisfactory stock. Replenished shopfloor stock, dealt with customer enquiries and reduced less than satisfactory stock.

Education

  • Heriot-Watt University
    Bachelor of Science (BSc), Architectural Engineering
    2010 - 2014
  • Forth Valley College
    HND, Computer Aided Draughting & Design
    2005 - 2007
  • Whitburn Academy
    Standard/Higher Grades
    1999 - 2005

Community

You need to have a working account to view this content. Click here to join now