James Yang
Desinger of air systems at Voith Paper- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Voith Paper
-
Germany
-
Machinery Manufacturing
-
700 & Above Employee
-
Desinger of air systems
-
Aug 2011 - Present
1. Responsible for OTC stage of air system. incl. design of hood and process air system, building drawing and Bom released schedule according to delivery time. communicate with abroad for technical issue, check technical parameter of single equipment 2. Clarify issues with Manufacturer during manufacturing. 3. Support to pruchasing department for developing local supplier. 4. Make P&ID in COMMOS. 5. Inquiry of single equipment from sub-supplier and clarify technical issue during inquiry Show less
-
-
-
-
Desinger of air systems and dry section
-
Oct 2003 - Aug 2011
1. Basic design and detail design of evaporation hood. 2. Basic design and detail design of process air systems which include fan selectiion, air heater selection, heat recovery and layout. 3. Calculate fan, air heater and heat recovery capacity. 4. Make technical specification 5. Design of Dryer, roll and bearing house. 6. Support to pruchasing department for developing local supplier. 1. Basic design and detail design of evaporation hood. 2. Basic design and detail design of process air systems which include fan selectiion, air heater selection, heat recovery and layout. 3. Calculate fan, air heater and heat recovery capacity. 4. Make technical specification 5. Design of Dryer, roll and bearing house. 6. Support to pruchasing department for developing local supplier.
-
-
Education
-
Nanjing University of Science and Technology
大专, Mechanical Engineering -
no
junior colleague