James Sinclair

Engineering Team Lead - Well Services at DNO Iraq AS
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
AE
Languages
  • English Native or bilingual proficiency
  • Portuguese Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Markus Gruenwalder

James is an excellent engineer and during the time we worked together he demonstrated his skills in artificial lift design and by keeping a complex integrated production model history matched and up-to-date. He also contributed to several projects by timely delivery. I enjoyed working with James and I hope that our paths cross again in the future.

Andrew Fooks

I’ve known James Sinclair for over 10 years, since we worked at AWT International together, where I was a colleague and later his manager. Through our interactions, I find James to be a person with outstanding technical ability in Production Technology, Completions, Geology & Reservoir Engineering. James works well in a team environment, both providing guidance to junior engineers and delivery of management targets. James has a tremendous amount of integrity and can be trusted with any tasks he is assigned. James would be an asset to any organization.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • SPE Certified Petroleum Engineer
    Society of Petroleum Engineers
    Nov, 2014
    - Oct, 2024
  • Level 2 Drilling Well Control - Combined Surface and Subsea Stack
    International Well Control Forum
    Jul, 2016
    - Oct, 2024
  • Level 4 Well Intervention Pressure Control
    International Well Control Forum
    Dec, 2016
    - Oct, 2024

Experience

    • Iraq
    • Oil and Gas
    • 100 - 200 Employee
    • Engineering Team Lead - Well Services
      • Oct 2022 - Present

      Management of a team of Intervention, Stimulation, ESP, Completions and Well Integrity Engineers for all DNO Iraq well services activities. Manage training and performance plans for engineers. Activities planning and scheduling. Introduction of new technologies. Contractor management, responsible for contractor performance reviews and performance improvement.

    • Senior Well Intervention Engineer
      • Mar 2022 - Oct 2022

      Preparation of intervention and workover programs and AFE’s, and daily engineering troubleshooting and support for all well services activities for coil tubing/wireline/slickline operations including shifting SSDs for stimulation, cleanup and water/gas shut-off/zonal isolation, wellbore cleanout, cased hole logging and fishing, perforating, and well integrity repair/intervention. Completions design and program preparation for ESP completions. Acid fracturing stimulation program preparation. Contractor management, scheduling and planning of activities, inventory management, preparation of ITT and mentoring of junior engineers.

    • Norway
    • Oil and Gas
    • 500 - 600 Employee
    • Senior Petroleum Engineer/Completions and Interventions Engineer
      • Mar 2017 - Mar 2022

      Senior Engineer focusing on Kurdistan region of Iraq, with additional projects offshore Oman and onshore Iran: o Well Intervention planning - responsible for design and program creation for rigless interventions including PLT's, water/gas shut-off, acid stimulation, asphaltene cleanouts, other through tubing scopes, via coiled tubing, wireline, slickline. Exploration and production well testing design, planning and execution. o Completions/Workover planning - design of lower and upper completions, program writing for long horizontal wells, ESP/PCP completions, multilateral wells, dual string completions, downhole diluent injection. Highly fractured carbonate reservoirs, light, medium, heavy and extra heavy oil, highly sour/high CO2. o ITT creation and evaluation for well intervention contracts (Eline, Coiled Tubing) and completion equipment, cost and time estimates o DNO Kurdistan artificial lift focal point – responsible for all aspects of ESP and PCP management on Tawke including ITT creation and evaluation, monitoring of stock levels, ordering, modelling of ESP performance. o Integrated Production System Modelling focal point for DNO (GAP/PROSPER). o Acid stimulation focal point – matrix acidization design of highly fractured carbonate as well as tight carbonate reservoirs. Responsible for introducing new stimulation design which delivered 50% improvement in deliverability of selected oil and water disposal wells.

    • Denmark
    • Oil and Gas
    • 700 & Above Employee
    • Senior Production Technologist/Completions Engineer
      • Aug 2014 - Feb 2017

      Responsible for: 1. Driving completion design and execution work for Tyra South East and Halfdan B platform infill drilling campaigns. Programme writing, stress analysis using WellCat, ITT, risk analysis. Implementing design changes and new technology saving over 50 million USD over the 4 extended reach well program. 2. Southern Fields Re-development completions design, long horizontal open-hole completions in both naturally fractured and unfractured carbonate reservoirs, producers and water-injectors. Upper and lower completion modelling using PROSPER and NeTool, including ICD modelling. 2. Matrix acidization and acid fracturing design, and modelling using NeTool. 3. Materials selection and corrosion, well integrity - sour and sweet environment studies and prediction. Caliper data analysis, workover prediction.

    • Oil and Gas
    • 700 & Above Employee
    • Senior Petroleum Engineer (Consultant)
      • Oct 2012 - Jul 2014

      Contracted to Talisman Malaysia Limited as Production Technologist. Responsible for: 1. Production well modelling (oil and gas): matching, optimisation activities, gas lift optimisation and design, well intervention opportunity recognition, diagnosis and troubleshooting. Single and dual string, gas and oil, multi-layered, horizontal modelling. 2. Water injection well modelling: injectivity analysis, recommendations for injectivity improvement. 3. Integrated asset modelling: production and injection system network modelling in GAP, matching, optimisation, recommendations for infrastructure activities, compressor sizing and optimisation, CO2 membrane system design. 4. MBAL modelling and history matching of gas reservoirs. 5. Training and mentoring: conduct in house PROSPER and GAP training to groups of younger engineers.

    • Malaysia
    • Wholesale Building Materials
    • 1 - 100 Employee
    • Senior Petroleum Engineer
      • Jan 2011 - Oct 2012

      Senior petroleum engineering/production engineering/petroleum economist consultant, managing a wide variety of projects worldwide. Senior petroleum engineering/production engineering/petroleum economist consultant, managing a wide variety of projects worldwide.

    • Australia
    • Oil and Gas
    • 400 - 500 Employee
    • Production Engineer (Consultant)
      • Oct 2011 - Mar 2012

      Contracted to QGC-BG as a Production Engineer for the CSG/CBM Berwyndale South Field, Condamine, Queensland. Responsible for: 1. PCP and ESP pump failure analysis 2. Production optimization 3. Production surveillance 4. Operator training. Contracted to QGC-BG as a Production Engineer for the CSG/CBM Berwyndale South Field, Condamine, Queensland. Responsible for: 1. PCP and ESP pump failure analysis 2. Production optimization 3. Production surveillance 4. Operator training.

    • Australia
    • Oil and Gas
    • 700 & Above Employee
    • Production Technologist
      • Feb 2010 - Jan 2011

      Responsible for: 1. Short and long-term production forecasting using IPM/IFM software. 2. Integrated Asset Modelling for North West Shelf project using GAP/PROSPER/MBAL. 3. Advanced integration and programming of LNG plant model using IPM RESOLVE. Responsible for: 1. Short and long-term production forecasting using IPM/IFM software. 2. Integrated Asset Modelling for North West Shelf project using GAP/PROSPER/MBAL. 3. Advanced integration and programming of LNG plant model using IPM RESOLVE.

    • Malaysia
    • Wholesale Building Materials
    • 1 - 100 Employee
    • Petroleum Engineer
      • Feb 2004 - Jan 2010

      Senior Petroleum Engineer with Advanced Well Technologies, based in Perth, Western Australia. Senior Petroleum Engineer with Advanced Well Technologies, based in Perth, Western Australia.

    • Oil and Gas
    • 700 & Above Employee
    • Graduate Petroleum Engineer
      • Dec 2003 - Feb 2004

      Graduate Petroleum Engineer, built a network model for the Harriet Development as part of Masters project. Graduate Petroleum Engineer, built a network model for the Harriet Development as part of Masters project.

    • United Kingdom
    • Mining
    • 700 & Above Employee
    • Exploration Geologist
      • Jan 2002 - Jan 2003

    • Mining
    • 1 - 100 Employee
    • Graduate Geologist
      • Oct 2001 - Jan 2002

Education

  • Curtin University
    Master of Business Administration (M.B.A.), Oil and Gas Major
    2011 - 2015
  • Curtin University
    Master of Engineering (M.Eng.), Petroleum Engineering
    2003 - 2008
  • The University of Western Australia
    Bachelor of Science (B.Sc.), Geology
    1997 - 2001

Community

You need to have a working account to view this content. Click here to join now