James O'Kane

Co-Founder | AI/Machine Learning Lead at Arrayen
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Brisbane, Queensland, Australia, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Technology, Information and Internet
    • 1 - 100 Employee
    • Co-Founder | AI/Machine Learning Lead
      • 2022 - Present

      Arrayen is an AI and Technology company that specialises in computer vision and intelligent data capture. We are here to guide you through the challenges that come with adopting new technologies and transform the way you do business with the adoption of AI. We believe that organisations that use machines merely to displace teams through automation will miss the full potential of AI. Through the implementation of hybrid intelligence systems you can support your teams by complementing their existing strengths. This Human-AI collaboration results in a process of continuous improvement and allows your organisation to achieve a new level of performance.

    • Australia
    • Business Consulting and Services
    • 1 - 100 Employee
    • Project Manager
      • 2020 - Present

      Projects included: - Beaudesert Enterprise Precinct - Scenic Rim Regional Council Flood Recovery Works 2021/22 Projects included: - Beaudesert Enterprise Precinct - Scenic Rim Regional Council Flood Recovery Works 2021/22

    • Construction Manager
      • 2018 - 2020

      Projects included: • Bundamba STP Upgrade, $25 million • Regional STP Upgrades across 10 sites, $10 million • Replacement of Air Blower at Luggage Point STP, $3 million Projects included: • Bundamba STP Upgrade, $25 million • Regional STP Upgrades across 10 sites, $10 million • Replacement of Air Blower at Luggage Point STP, $3 million

    • United States
    • Civil Engineering
    • 700 & Above Employee
    • Construction Manager
      • 2016 - 2018

      Projects included: • Scenic Rim Regional Council Flood Recovery Works 2017 • Toowoomba Regional Council – Millmerran Bridge Works • Ergon Energy Toowoomba Depot Redevelopment Projects included: • Scenic Rim Regional Council Flood Recovery Works 2017 • Toowoomba Regional Council – Millmerran Bridge Works • Ergon Energy Toowoomba Depot Redevelopment

    • Australia
    • Government Administration
    • 500 - 600 Employee
    • Construction Manager
      • 2014 - 2016

      O'Mara Road Carriageway Duplication - Stage 1A & Stage 1B Construction of a four-lane carriageway $27 million. O'Mara Road Carriageway Duplication - Stage 1A & Stage 1B Construction of a four-lane carriageway $27 million.

    • Construction Manager
      • 2012 - 2014

      NDRRA Flood Restoration Works - Toowoomba Regional Council Approximately 1800 emergency repair sites and 1300 reconstruction sites $250 million NDRRA Flood Restoration Works - Toowoomba Regional Council Approximately 1800 emergency repair sites and 1300 reconstruction sites $250 million

    • Australia
    • Civil Engineering
    • 400 - 500 Employee
    • Civil Superintendent
      • 2011 - 2012

      Clermont/Blair Athol Coal Mines Deferred Capital Works Program $70M Clermont/Blair Athol Coal Mines Deferred Capital Works Program $70M

    • Senior Project Engineer
      • 2010 - 2011

      Ipswich Motorway Upgrade (Dinmore to Goodna) Design and construction of an eight lane upgrade to the existing motorway over the top of the existing alignment. $2B Ipswich Motorway Upgrade (Dinmore to Goodna) Design and construction of an eight lane upgrade to the existing motorway over the top of the existing alignment. $2B

    • Australia
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Project Engineer
      • 2009 - 2010

      Toowoomba Pipeline Alliance 38km bulk raw water pipeline designed to deliver up to 39 mega litres (ML) per day from Wivenhoe Dam to Cressbrook Dam. $160M Toowoomba Pipeline Alliance 38km bulk raw water pipeline designed to deliver up to 39 mega litres (ML) per day from Wivenhoe Dam to Cressbrook Dam. $160M

    • Mining
    • 700 & Above Employee
    • Project Engineer
      • 2007 - 2009

      Boggo Road Busway Alliance 430m long driven tunnel located directly beneath the heritage listed gaol. $400M Bundamba Advanced Water Treatment Plant Upon completion the Bundamba Advanced Water Treatment Plant was third-largest water treatment plant in the world. $500 million Boggo Road Busway Alliance 430m long driven tunnel located directly beneath the heritage listed gaol. $400M Bundamba Advanced Water Treatment Plant Upon completion the Bundamba Advanced Water Treatment Plant was third-largest water treatment plant in the world. $500 million

    • India
    • Appliances, Electrical, and Electronics Manufacturing
    • Project Engineer
      • 2005 - 2007

      North South Bypass Tunnel (Clem 7) 6.8km tunnel in length from end to end. $1B Bruce Highway Upgrade - Burpengary Construction of a six lane upgrade to the existing motorway over the top of the existing alignment. $50M North South Bypass Tunnel (Clem 7) 6.8km tunnel in length from end to end. $1B Bruce Highway Upgrade - Burpengary Construction of a six lane upgrade to the existing motorway over the top of the existing alignment. $50M

    • Construction
    • 1 - 100 Employee
    • Site Engineer
      • 2003 - 2004

      Burnett River Dam Alliance Australia’s largest Roller Compacted Concrete (RCC) Dam and at the time of construction, and was Queensland’s largest infrastructure project. $200M Burnett River Dam Alliance Australia’s largest Roller Compacted Concrete (RCC) Dam and at the time of construction, and was Queensland’s largest infrastructure project. $200M

Education

  • University of New England (AU)
    Master of Data Science
    2018 - 2021
  • Griffith University
    Bachelor Of Engineering in Civil Engineering, Construction
    1999 - 2002

Community

You need to have a working account to view this content. Click here to join now