James O'Kane
Co-Founder | AI/Machine Learning Lead at Arrayen- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Arrayen
-
Australia
-
Technology, Information and Internet
-
1 - 100 Employee
-
Co-Founder | AI/Machine Learning Lead
-
2022 - Present
Arrayen is an AI and Technology company that specialises in computer vision and intelligent data capture. We are here to guide you through the challenges that come with adopting new technologies and transform the way you do business with the adoption of AI. We believe that organisations that use machines merely to displace teams through automation will miss the full potential of AI. Through the implementation of hybrid intelligence systems you can support your teams by complementing their existing strengths. This Human-AI collaboration results in a process of continuous improvement and allows your organisation to achieve a new level of performance.
-
-
-
Redfrost Pty Ltd
-
Australia
-
Business Consulting and Services
-
1 - 100 Employee
-
Project Manager
-
2020 - Present
Projects included: - Beaudesert Enterprise Precinct - Scenic Rim Regional Council Flood Recovery Works 2021/22 Projects included: - Beaudesert Enterprise Precinct - Scenic Rim Regional Council Flood Recovery Works 2021/22
-
-
-
-
Construction Manager
-
2018 - 2020
Projects included: • Bundamba STP Upgrade, $25 million • Regional STP Upgrades across 10 sites, $10 million • Replacement of Air Blower at Luggage Point STP, $3 million Projects included: • Bundamba STP Upgrade, $25 million • Regional STP Upgrades across 10 sites, $10 million • Replacement of Air Blower at Luggage Point STP, $3 million
-
-
-
AECOM
-
United States
-
Civil Engineering
-
700 & Above Employee
-
Construction Manager
-
2016 - 2018
Projects included: • Scenic Rim Regional Council Flood Recovery Works 2017 • Toowoomba Regional Council – Millmerran Bridge Works • Ergon Energy Toowoomba Depot Redevelopment Projects included: • Scenic Rim Regional Council Flood Recovery Works 2017 • Toowoomba Regional Council – Millmerran Bridge Works • Ergon Energy Toowoomba Depot Redevelopment
-
-
-
Toowoomba Regional Council
-
Australia
-
Government Administration
-
500 - 600 Employee
-
Construction Manager
-
2014 - 2016
O'Mara Road Carriageway Duplication - Stage 1A & Stage 1B Construction of a four-lane carriageway $27 million. O'Mara Road Carriageway Duplication - Stage 1A & Stage 1B Construction of a four-lane carriageway $27 million.
-
-
-
-
Construction Manager
-
2012 - 2014
NDRRA Flood Restoration Works - Toowoomba Regional Council Approximately 1800 emergency repair sites and 1300 reconstruction sites $250 million NDRRA Flood Restoration Works - Toowoomba Regional Council Approximately 1800 emergency repair sites and 1300 reconstruction sites $250 million
-
-
-
Sinclair Knight Merz
-
Australia
-
Civil Engineering
-
400 - 500 Employee
-
Civil Superintendent
-
2011 - 2012
Clermont/Blair Athol Coal Mines Deferred Capital Works Program $70M Clermont/Blair Athol Coal Mines Deferred Capital Works Program $70M
-
-
-
-
Senior Project Engineer
-
2010 - 2011
Ipswich Motorway Upgrade (Dinmore to Goodna) Design and construction of an eight lane upgrade to the existing motorway over the top of the existing alignment. $2B Ipswich Motorway Upgrade (Dinmore to Goodna) Design and construction of an eight lane upgrade to the existing motorway over the top of the existing alignment. $2B
-
-
-
WDS Limited
-
Australia
-
Oil and Gas
-
1 - 100 Employee
-
Senior Project Engineer
-
2009 - 2010
Toowoomba Pipeline Alliance 38km bulk raw water pipeline designed to deliver up to 39 mega litres (ML) per day from Wivenhoe Dam to Cressbrook Dam. $160M Toowoomba Pipeline Alliance 38km bulk raw water pipeline designed to deliver up to 39 mega litres (ML) per day from Wivenhoe Dam to Cressbrook Dam. $160M
-
-
-
Thiess
-
Mining
-
700 & Above Employee
-
Project Engineer
-
2007 - 2009
Boggo Road Busway Alliance 430m long driven tunnel located directly beneath the heritage listed gaol. $400M Bundamba Advanced Water Treatment Plant Upon completion the Bundamba Advanced Water Treatment Plant was third-largest water treatment plant in the world. $500 million Boggo Road Busway Alliance 430m long driven tunnel located directly beneath the heritage listed gaol. $400M Bundamba Advanced Water Treatment Plant Upon completion the Bundamba Advanced Water Treatment Plant was third-largest water treatment plant in the world. $500 million
-
-
-
Leighton Contractors
-
India
-
Appliances, Electrical, and Electronics Manufacturing
-
Project Engineer
-
2005 - 2007
North South Bypass Tunnel (Clem 7) 6.8km tunnel in length from end to end. $1B Bruce Highway Upgrade - Burpengary Construction of a six lane upgrade to the existing motorway over the top of the existing alignment. $50M North South Bypass Tunnel (Clem 7) 6.8km tunnel in length from end to end. $1B Bruce Highway Upgrade - Burpengary Construction of a six lane upgrade to the existing motorway over the top of the existing alignment. $50M
-
-
-
Walter Constructions
-
Construction
-
1 - 100 Employee
-
Site Engineer
-
2003 - 2004
Burnett River Dam Alliance Australia’s largest Roller Compacted Concrete (RCC) Dam and at the time of construction, and was Queensland’s largest infrastructure project. $200M Burnett River Dam Alliance Australia’s largest Roller Compacted Concrete (RCC) Dam and at the time of construction, and was Queensland’s largest infrastructure project. $200M
-
-
Education
-
University of New England (AU)
Master of Data Science -
Griffith University
Bachelor Of Engineering in Civil Engineering, Construction