James Brasch

Electrical Engineer at Vos Electric
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
De Pere, Wisconsin, United States, US
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Construction
    • 1 - 100 Employee
    • Electrical Engineer
      • Jan 2010 - Present

      Start Up and Commission of Various Construction Projects Start Up and Commission of Various Construction Projects

    • Electrical Engineer
      • Jan 2010 - Present

      Involved in Start-Up and Commission of Various Construction Projects. Including DCS Upgrade at Graphic Packaging Int. West Monroe La., Reel Upgrade IP Augusta, Honeywell DCS Upgrade WestRock Florence S.C., New Paper Machine install First Quality Anderson S.C.  Ongoing Electrical support for ST Paper Oconto Falls Wi. Involved in Start-Up and Commission of Various Construction Projects. Including DCS Upgrade at Graphic Packaging Int. West Monroe La., Reel Upgrade IP Augusta, Honeywell DCS Upgrade WestRock Florence S.C., New Paper Machine install First Quality Anderson S.C.  Ongoing Electrical support for ST Paper Oconto Falls Wi.

    • United States
    • Paper and Forest Product Manufacturing
    • 1 - 100 Employee
    • Electrical Engineer
      • Jan 2006 - Jan 2010

      Designed power system facilities and equipment.  Assisted in developing capital project programs for new equipment and major repairs.  Wrote, designed and produced documentation for capital projects.  Created computer-assisted engineering drawings for capital projects.  Was instrumental in implementing Human Machine interfaces to existing plant equipment.  Directed and coordinated manufacturing, construction, installation, maintenance, support, documentation, and testing activities to ensure compliance with specifications, codes, and customer requirements.  Trained 4 Electrical and Instrument tech's in Human Machine interfacing to Programmable controllers.  Performed detailed calculations to compute and establish manufacturing, construction, and installation standards and specifications.  Inspected completed installations and observed operations, to ensure conformance to design and equipment specifications and compliance with operational and safety standards.  Edited finalized computer-assisted drawings in all areas of the mill facility. Prepared technical drawings, specifications of electrical systems, and formal bid documents to ensure that installation and operations conform to standards and customer requirements.  Oversaw project production efforts to assure projects are completed satisfactorily, on time and within budget.  Structured and maintained all computer-assisted drawings for all of the mill areas  Designed of Mill Wide system one-line diagram and associated information for Arc Flash study. Show less

    • Electrical Engineer
      • Jan 1999 - Jan 2006

      Assisted in developing capital project programs for new equipment and major repairs.  Wrote, designed and produced documentation for capital projects.  Created computer-assisted engineering drawings for capital projects.  Directed and coordinated manufacturing, construction, installation, maintenance, support, documentation, and testing activities to ensure compliance with specifications, codes, and customer requirements.  Trained 4 Electrical and Instrument tech's in Human Machine interfacing to Programmable controllers.  Performed detailed calculations to compute and establish manufacturing, construction, and installation standards and specifications.  Inspected completed installations and observed operations, to ensure conformance to design and equipment specifications and compliance with operational and safety standards.  Edited finalized computer-assisted drawings in all areas of the mill facility. Prepared technical drawings, specifications of electrical systems, and formal bid documents to ensure that installation and operations conform to standards and customer requirements.  Oversaw project production efforts to assure projects are completed satisfactorily, on time and within budget.  Structured and maintained all computer-assisted drawings for all of the mill areas  Designed interface for communication between Paper Machine drive systems and Honeywell Distributed Control system. Show less

    • Electrical Engineer
      • Jan 1989 - Jan 1999

      Wrote, designed and produced documentation for capital projects.  Created computer-assisted engineering drawings for capital projects.  Directed and coordinated manufacturing, construction, installation, maintenance, support, documentation, and testing activities to ensure compliance with specifications, codes, and customer requirements.  Performed detailed calculations to compute and establish manufacturing, construction, and installation standards and specifications.  Inspected completed installations and observed operations, to ensure conformance to design and equipment specifications and compliance with operational and safety standards.  Oversaw project production efforts to assure projects are completed satisfactorily, on time and within budget.  Structured and maintained all computer-assisted drawings for all of the assigned project areas.  Conferred with engineers, customers, and others to discuss existing and potential engineering projects and products. Show less

    • Brazil
    • Technology, Information and Internet
    • 1 - 100 Employee
    • Electrical Engineer
      • Jan 1987 - Jan 1989

      Wrote, designed and produced documentation for capital projects.  Created computer-assisted engineering drawings for capital projects.  Performed detailed calculations to compute and establish manufacturing, construction, and installation standards and specifications.  Inspected completed installations and observed operations, to ensure conformance to design and equipment specifications and compliance with operational and safety standards.  Oversaw project production efforts to assure projects are completed satisfactorily, on time and within budget.  Conferred with engineers, customers, and others to discuss existing and potential engineering projects and products. Show less

    • Electrical Engineer
      • Jan 1972 - Jan 1987

      Designed power system facilities and equipment.  Planned layout of generating plants, transmission and distribution lines and receiving and distribution stations.  Assisted in developing capital project programs for new equipment and major repair, designed and produced documentation for capital projects.  Wrote, designed and produced documentation for capital projects.  Created computer-assisted engineering drawings for capital projects.  Was instrumental in implementing Human Machine interfaces to existing plant equipment.  Trained 6 Electrical and Instrument tech's in Human Machine interfacing to Programmable controllers.  Performed detailed calculations to compute and establish construction, and installation standards and specifications.  Inspected completed installations and observed operations, to ensure conformance to design and equipment specifications and compliance with operational and safety standards.  Edited finalized computer-assisted drawings in all areas of the mill facility. Prepared technical drawings, specifications of electrical systems, and formal bid documents to ensure that installation and operations conform to standards and customer requirements.  Oversaw project production efforts to assure projects are completed satisfactorily, on time and within budget.  Structured and maintained all computer-assisted drawings for all of the mill areas.  Conferred with engineers, customers, and others to discuss existing and potential engineering projects and products.  Designed interface for communication between Paper machine drives and Distributed Control system. Show less

Education

  • Milwaukee School of Engineering
    BS, EE
    1968 - 1972

Community

You need to have a working account to view this content. Click here to join now