Jairo Acosta

Electrical Engineer at ETESA
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Panama, PA
Languages
  • English Full professional proficiency
  • Spanish Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • diploma
    -

Experience

    • Utilities
    • 100 - 200 Employee
    • Electrical Engineer
      • Jan 2015 - Present

      Designer Engineer of 230/500 kV substations, GIS substations and Hybrid substations. Estimation Cost of EPC Engineering Procurement and Construction projects. Reviewing, constructions drawings and specifications of substations. Designer Engineer of 230/500 kV substations, GIS substations and Hybrid substations. Estimation Cost of EPC Engineering Procurement and Construction projects. Reviewing, constructions drawings and specifications of substations.

    • United Kingdom
    • Utilities
    • 100 - 200 Employee
    • Project Manager
      • Jan 2004 - Dec 2013

      Mendoza Water Treatment Plant. ACP-Panama 2008-2013 Participation in the design and development of basic and detailed engineering for the Mendoza Water Treatment Plant (40 million gallons). Chilibre Treatment Water Plant. 2004-2009 Service of technical permanent assistance, electromechanical engineering for design, assembly, equipment procurement, operation and rehabilitation of the Chilibre Treatment Water Plant in Panama. Including the design and inspection of a short line and substation at 115kV, 30MVA. Show less

    • General Manager
      • Feb 2002 - Jul 2004

      Contract of Maintenance in Hot Line, in distribution network 34.5/13.8kV of Unión Fenosa in Panama, 360000 users. 11-50 employ. Contract for new distribution circuits construction in Unión Fenosa area on Panama. Average cost of Project 1.5 millons US$. Contract of Maintenance in Hot Line, in distribution network 34.5/13.8kV of Unión Fenosa in Panama, 360000 users. 11-50 employ. Contract for new distribution circuits construction in Unión Fenosa area on Panama. Average cost of Project 1.5 millons US$.

    • Chief Electrical Design
      • Feb 2001 - Mar 2002

      Andrés Project in Dominican Republic. Proprietary: AES Management of the electromechanical design for two 138kV substations, review connection drawings of control interface between equipment, assistant for the assembly substations. Assistant for selection and purchase of auxiliary service equipment. Andrés Project in Dominican Republic. Proprietary: AES Management of the electromechanical design for two 138kV substations, review connection drawings of control interface between equipment, assistant for the assembly substations. Assistant for selection and purchase of auxiliary service equipment.

    • Chief of Tecnical Consulting Office
      • Dec 1996 - Apr 1998

      Technical advisor for constructions for 57 electrical substations and applied protective relays, in electrical power plants, and substations for development Planiep – Corelca project. 2 substations x 230kV, 35 substations x 110kV and 20 substations x 34, 5kV.

    • Chief of development of basic electromechanical engineer
      • Mar 1996 - Dec 1996

      Basic electromechanical engineer development : courtyard layout, control house, technical specifications, definition and design of 37 High Tension substations; 2 x 230 kV, 33 x 115 kV and 20 x 34,5 kV, Planiep – Corelca Project.

Education

  • Universidad Nacional de Colombia
    Electrical Engineer, Electrical and Electronics Engineering
    1972 - 1979

Community

You need to have a working account to view this content. Click here to join now