Jaime Y.
Facilities Project Manager Catholic Charities St. Paul at Catholic Charities of St. Paul and Minneapolis- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
Catholic Charities of St. Paul and Minneapolis
-
United States
-
Individual and Family Services
-
100 - 200 Employee
-
Facilities Project Manager Catholic Charities St. Paul
-
Sep 2019 - Present
-
-
-
-
Complex Director of Engineering
-
Mar 2013 - Dec 2018
Manage all facilities and maintenance aspects of both owned and managed properties; W Minneapolis - 180,000 sq. ft., 32 stories + 4 sub floors, indoor parking structure, 229 rooms and two third party restaurant operators. Le Meridien Chambers - 80,000 sq. ft., 5 stories + 1 sub floor, 60 rooms and one third party restaurant operator. Understanding of third party lease situations. Responsible for operation of all major mechanical and HVAC equipment including heating and domestic water boilers (Camus), chillers (YORK and TRANE), cooling towers, RTU’s (McQuay and Carrier), MAUs, FCUs, VAVs, building automation system (Johnson Controls and UHL), fire prevention systems (Notifier and Silent Knight), emergency generators (Caterpillar and Kohler) and elevator systems including 9 hydro and 4 traction (TKE and Schindler). Manage all functions of the 7 person engineering department including payroll, budget, operations and projects. Train, coach and mentor new and existing engineers. Show less
-
-
-
-
Maintenance Manager
-
2006 - 2012
Responsible for all maintenance of this 105-unit upscale condominium project. Supervised janitorial, facilities/general maintenance and landscaping staff. Responsible for hiring facilities staff. Responsible for meeting property budget and maintaining expense control. Recommended and coordinated outside vendors where necessary. Electrical, plumbing and HVAC troubleshooting and repair. Assisted Property Manager in responding to owner concerns. Major accomplishments include: Completion of 4-building painting project for an estimated $300,000 savings to the Association. Completion of railing replacement project for an estimated $75,000 savings to the Association. Storage door replacement project. Driveway resurfacing/sealcoating. Rebuilding of irrigation system. Major roof repair project. Trim and siding replacement project. Major termite control project. Show less
-
-
-
Midwest Manufacturing
-
United States
-
Wholesale Building Materials
-
200 - 300 Employee
-
Quality Control Prehung Division
-
Jan 2003 - Jun 2006
Responsible for assuring that doors were produced within specified tolerances in all areas from receiving to production to shipping. Worked on all production lines. Set up displays in retail outlets. Responsible for assuring that doors were produced within specified tolerances in all areas from receiving to production to shipping. Worked on all production lines. Set up displays in retail outlets.
-
-