Jai Butler

Site Manager at Dimpat
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Construction
    • 1 - 100 Employee
    • Site Manager
      • Jan 2021 - Present

    • Site manager
      • Jan 2018 - Dec 2020

      Managing a renovation / extension Matt Gibson project in South Yarra on a William Tappin house. Working with cutting edge designs, high finishes, cellar, heritage frontage (tuck-pointing/ slate roof). Internal lift. Hydronic trenches, underfloor heating, technical steel design, off form concrete 8m chimney. Completed a $1.5million (Trethewan) project in Cremorne. Role: manage site, inductions, OH&S, Liaise and Supervise trades, quality control, material takeoffs, all carpentry and all labour. Extremely compact and difficult job site, access, deliveries, storage, logistics and Yarra council. Resolving stressful situations and altercations. Working with plans with very minimal direction and open to misinterpretation. High end finishes, hydronic floor heating, detailed timber cladding (battens and charred cladding). Architectural doors (altro and linvisible). P50 skirts and cornice details. Internal lifts. Worked on a $9million project on Hopetoun rd, Toorak (Jacobsen Arquitetura) until my project started.

    • Site manager
      • Jul 2015 - Jan 2018

      Running the everyday works on site Liaise with trades, scheduling and quality control Material takeoffs Gathering quotes for materials, trades and appliances. Hands on carpentry Working directly under the director Troubleshooting / problem solving Leading by example with quality, work ethic and being organised. Interact one on one with clients and architects. All projects staying on time and budget. Working with Dan Gayfer design, Tina Linder building design. A one off ‘style school’ project for the Judds.

    • Carpenter
      • Aug 2012 - Sep 2015

      Worked on ProBuilds construction of John Gandalls 3 bedroom $55million personal holiday house in Pt Leo where tolerances were no more than 1mm and the highest finishes. All aspects of carpentry from commencement to completion Read drawings and instruct trades set out Construction with metal studs, suspended ceilings, furring Chanel w/ betafix clips, aluminium skirts, specialised doors. Worked on ProBuilds construction of John Gandalls 3 bedroom $55million personal holiday house in Pt Leo where tolerances were no more than 1mm and the highest finishes. All aspects of carpentry from commencement to completion Read drawings and instruct trades set out Construction with metal studs, suspended ceilings, furring Chanel w/ betafix clips, aluminium skirts, specialised doors.

    • Foreman
      • Feb 2010 - Aug 2012

      All aspects of carpentry from site cut, boxing and tying steel for slab to putting on the front door handle. instructing a team of carpenters quality control site managed a $2.1million Neil architecture project ‘hoy residence’ in Hawthorn at the age of 25. dealing with all issues, from drawings to people. learnt to be extremely organised and the art of writing a list and a plan. liaise with architect All aspects of carpentry from site cut, boxing and tying steel for slab to putting on the front door handle. instructing a team of carpenters quality control site managed a $2.1million Neil architecture project ‘hoy residence’ in Hawthorn at the age of 25. dealing with all issues, from drawings to people. learnt to be extremely organised and the art of writing a list and a plan. liaise with architect

    • Carpenter apprentice
      • Aug 2004 - Dec 2007

      Mid - high end construction Balwyn, Toorak, Hawthorn area generally Construction from start to end of build, new and renovations. Mid - high end construction Balwyn, Toorak, Hawthorn area generally Construction from start to end of build, new and renovations.

Education

  • Swinburne croydon
    Carpentry apprenticeship
    2004 - 2006
  • Aquinas college ringwood
    1995 - 2001
  • Box Hill Institute
    Personal trainer
  • Box Hill Institute
    Diploma, Sport recreation

Community

You need to have a working account to view this content. Click here to join now