JAFFAR SADAK VALI LADDU
Alignment Engineer at Korea Railroad Technical Corporation- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Hindi Native or bilingual proficiency
-
Telugu Native or bilingual proficiency
-
Urdu Professional working proficiency
Topline Score
Bio
Credentials
-
AUTOCAD CIVIL 3D ESSENTIAL
LinkedInAug, 2020- Nov, 2024 -
MX Road Essential
CADD Centre Training Services Pvt Ltd.Dec, 2019- Nov, 2024 -
STAAD PRO
CAD UNIVERSEFeb, 2017- Nov, 2024 -
AUTO CAD
CAD UNIVERSESep, 2016- Nov, 2024
Experience
-
Korea Railroad Technical Corporation
-
South Korea
-
Civil Engineering
-
1 - 100 Employee
-
Alignment Engineer
-
Feb 2023 - Present
-
-
-
-
Railway Alignment Engineer
-
May 2022 - Feb 2023
●Design of Mysore – Kushalnagar Project of Length 85+050 Km, where I have designed Horizontal Alignments and Vertical Profiles. Creating of cross sections and earth work calculations. ●Preparing the Feasibility report of Kushalnagar-Mysore Project. ●Preparing of ESP/Yard Plans for Rail Projects. ●Preparing the DPR of the Gooty –Pendekallu for new Doubling line project as per new guidelines. ●Preparing the DPR of the Dornakal – Badhrachalam Road for new Doubling line project as per new guidelines. Show less
-
-
-
.efficiently
-
United States
-
Business Consulting and Services
-
300 - 400 Employee
-
Civil-3d Engineer (Highways/ Urban Development)
-
Jan 2022 - May 2022
1. Designing roads for wind turbines and grading the hardstand layouts for the turbines as per the Specifications (WT Types N-133, N-149) and also using Data Shortcuts. 2. Designing Detention Ponds from the data received. Grading a lagoon to the specified area along with creating revetments on the other side. 3. Designing of Revetments for the Dublin port company. 4. Grading the site for the construction of the electrical substation with specified slopes 1. Designing roads for wind turbines and grading the hardstand layouts for the turbines as per the Specifications (WT Types N-133, N-149) and also using Data Shortcuts. 2. Designing Detention Ponds from the data received. Grading a lagoon to the specified area along with creating revetments on the other side. 3. Designing of Revetments for the Dublin port company. 4. Grading the site for the construction of the electrical substation with specified slopes
-
-
-
Design Line Consultancy Services
-
Gurugram, Haryana, India
-
Assistant Highway Designing Engineer
-
Jan 2021 - Jan 2022
• Preparing of Profiles, Cross Sections, Strip Plans. • Drafting the plan and profile of the design drawings. • Adding of drains, culverts, retaining walls and breast walls along the plan of the designed road as per chain age. • Preparation of DPR for Pmgsy roads • Preparing of Profiles, Cross Sections, Strip Plans. • Drafting the plan and profile of the design drawings. • Adding of drains, culverts, retaining walls and breast walls along the plan of the designed road as per chain age. • Preparation of DPR for Pmgsy roads
-
-
-
Sree Ram Associates
-
Anantapur, Andhra Pradesh, India
-
Valuation Engineer / Cad Drftaman
-
Aug 2019 - Dec 2020
• Auto Cad Drawings of each Structure which is being affected by the extension of NH-365BB from Khammam to Suryapet of around 300 Drawings. • Detailing the type of the structures to be affected for the valuation purpose as per the rates given by the NHAI. • Auto Cad Drawings of each Structure which is being affected by the extension of NH-365BB from Khammam to Suryapet of around 300 Drawings. • Detailing the type of the structures to be affected for the valuation purpose as per the rates given by the NHAI.
-
-
Education
-
MVR College of Engineering & Technology
Master of Technology - MTech, Transportation -
INTELL ENGINEERING COLLEGE
Bachelor of Technology, civil -
NRI JR COLLEGE
INTERMEDIATE, MPC -
S. K. S. ENGLISH MEDIUM HIGH SCHOOL
10th, Ssc