Jacob Leslie
Controls Engineer I at TAMKO- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
TIA Portal Programming II
SiemensAug, 2022- Nov, 2024 -
TIA Portal Programming I
SiemensJul, 2022- Nov, 2024
Experience
-
TAMKO
-
United States
-
Wholesale Building Materials
-
400 - 500 Employee
-
Controls Engineer I
-
Feb 2021 - Present
• Fulfill duties as electrical/controls engineering support for 10+ capital projects throughout several shingle lines within the company• Provide on-site PLC and field device configuring and troubleshooting during installation/commissioning phase of the project• Specific job functions include project scoping, project budgeting, electrical drawings package creation and review, IO and device list building, load calculations, panel building, cable/conduit scheduling, FMEA reviews, and constant collaboration with PLC programmers
-
-
-
Enterprise Products
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Operations Engineer
-
Jul 2020 - Jan 2021
• Created KPI spreadsheets to analyze data comparing pump flow inside and outside of curve to inboard and outboard vibrations• Produced MOCs with the initiative to generate DCS graphics for flare limits on screen for board operators
-
-
Process Control Engineer
-
Jul 2019 - Jul 2020
• Upgraded PLC/DCS systems at various plant locations within the company • Served as control engineer in multiple projects from pre-engineering work to hot/cold cutover onsite• Developed numerous project scopes of work detailing both the design drawing package and engineering work • Redlined various types of drawings for design package using BlueBeam
-
-
-
Owens Corning
-
United States
-
Wholesale Building Materials
-
700 & Above Employee
-
Manufacturing Engineer
-
May 2018 - Aug 2018
• Generated TPM cleaning and inspection standards for the hot end line • Optimized forming fans on two of the three process lines • Assessed PID controls for pull cameras • Generated TPM cleaning and inspection standards for the hot end line • Optimized forming fans on two of the three process lines • Assessed PID controls for pull cameras
-
-
-
-
Mechanical Engineer
-
Oct 2017 - Dec 2017
• Worked as a drafter on HVAC drawings using in-house CAD program • Worked as a drafter on HVAC drawings using in-house CAD program
-
-
-
USG
-
United States
-
Wholesale Building Materials
-
700 & Above Employee
-
Project Engineer
-
Jan 2017 - Aug 2017
• Co-lead install and full integration of a 65ft silo into the process lines• Assisted in modifying and installing a new 800k assembly line • Built job authorities and purchase order requisitions as needed• Aided in running the plant lab, updating environmental permits, and supporting all other plant operations on a daily basis • Co-lead install and full integration of a 65ft silo into the process lines• Assisted in modifying and installing a new 800k assembly line • Built job authorities and purchase order requisitions as needed• Aided in running the plant lab, updating environmental permits, and supporting all other plant operations on a daily basis
-
-
Education
-
Texas Tech University
Bachelor's degree, Mechanical Engineering