Jacob Hopkins

Project Manager at Linbeck Group, LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Houston, Texas, United States, US
Languages
  • Spanish Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Construction
    • 200 - 300 Employee
    • Project Manager
      • Feb 2020 - Present

      MDA MRI Renovations (2 Separate Projects, 3,250 SF, $2.5M)Description: Demolition and gutting of the existing two MRI scan rooms, adjacent equipment room, and control room, including the demolition and removal of existing RF shielding, door, and window, and all MEP systems. The scan room was modified including all infrastructure for the use of anesthesiology, injectors, and elastography, and an additional steel silicon plate was added to accommodate upgraded 3T Magnet. The MRI Suite is located on the fourth floor of the existing ambulatory care building and included the rigging to remove and reinstall existing precast panel and glass on the same day to create an opening for MRIs for 12 hours. The existing MRIs were removed, and new MRIs installed to maximize efficiency and minimize road closure and traffic control of Bertner Avenue in the Texas Medical Center. The Control Room wall and window was left out of initial construction for the rigging path of new MRI, and was closely coordinated to minimize the scope of work after MRI installation to expedite the schedule.MDA Hybrid OR Bi-Plane Suite (1,500 sf, $1.5M):Description: Demolition of two existing ORs, and renovation to a new Hybrid OR with Bi-Plane Angio Diagnostic Imaging Equipment. Project included all new MEPF infrastructure for new procedure room, control room and equipment room built in an active Operating Room Environment.Responsibilities: Project Management on all aspects of the project from client stewardship, team management and training, estimating, engineering, financials, and on-site superintendent. Show less

    • Assistant Project Manager
      • May 2019 - Jan 2020

      MDA Job Order Contracting Projects (30 Separate Projects, $5M)Description: Variety of Special Projects including upgrades to Linear Accelerators, X-Ray, IR Angio Equipment and Valet Area Improvements.Harris Health Ben Taub Bronchoscopy Suite (1,500 sf, $1M):Description: Demolition and Buildout of Bronchoscopy Suite in with operating room, pre-op, staff spaces, exam room and toilet.Responsibilities: Project Management on all aspects of the project from client stewardship, team management and training, estimating, engineering, financials, and on-site superintendent. Show less

    • Project Engineer
      • Apr 2018 - Apr 2019

      MDA Job Order Contracting Projects (30 Separate Projects, $5M)Description: Variety of Special Projects including upgrades CT/SIMs, PET/CTs, IR/CTs, SPECT/CTs and Ultrasound Exam Rooms and Hurricane Harvey Response Projects.Responsibilities: Project Management on all aspects of the project from client stewardship, team management and training, estimating, engineering, financials, on-site superintendent.

    • Engineer
      • Jul 2016 - Mar 2018

      MD Anderson Alkek G20-G22 Buildout: ($40M, 140,000 sf)Description: Interior Buildout of 144 Inpatient Rooms with individual bathrooms on top three floors of MDA main tower. Buildout included, bariatric patient lifts, pneumatic tube system, trash and linen chute system, and positive pressure environments.Responsibilities: Client Management, Project Financials, Scheduling, Submittal Management, RFIs, Change Estimation, On-Site Assistant Superintendent, TAB and Cx Coodination, Closeout.

    • Dominican Republic
    • Primary and Secondary Education
    • 1 - 100 Employee
    • Technology Teacher and Campus Development Assistant
      • Jul 2015 - Jun 2016

      - Reviewed drawings and submittals of eight-classroom addition in a foreign country. - Lead a team in projects for Computer Lab renovation, Café Sale System upgrade, and Digital Library System creation including written proposals, and oral presentations to school leadership. - Created a K-12 technology education program from the ground up with no previous experience. - Developed systems to distribute classroom technology in both English and Spanish. - Reviewed drawings and submittals of eight-classroom addition in a foreign country. - Lead a team in projects for Computer Lab renovation, Café Sale System upgrade, and Digital Library System creation including written proposals, and oral presentations to school leadership. - Created a K-12 technology education program from the ground up with no previous experience. - Developed systems to distribute classroom technology in both English and Spanish.

    • Construction
    • 1 - 100 Employee
    • Intern
      • Feb 2015 - Jun 2015

      - Updated and maintained digital and physical job site documentation on $4 million church project. - Recorded SWPPP, Safety, Subcontractor Training and Daily Reports. - Prepared building layout and performed line and grade. - Updated and maintained digital and physical job site documentation on $4 million church project. - Recorded SWPPP, Safety, Subcontractor Training and Daily Reports. - Prepared building layout and performed line and grade.

    • United States
    • Construction
    • 200 - 300 Employee
    • Intern
      • May 2014 - Aug 2014

      - Performed multiple quantity takeoffs and assisted in estimating $20 million Healthcare Building. - Drafted and distributed submittals, RFI’s and PC’s while accurately updating the logs. - Scheduled and completed punch list on time with subs, owners and city inspectors. - Assembled and delivered closeout documents to client to complete project. - Performed multiple quantity takeoffs and assisted in estimating $20 million Healthcare Building. - Drafted and distributed submittals, RFI’s and PC’s while accurately updating the logs. - Scheduled and completed punch list on time with subs, owners and city inspectors. - Assembled and delivered closeout documents to client to complete project.

Education

  • The University of Texas at Austin
    Bachelor's, Civil Engineering
    2011 - 2015

Community

You need to have a working account to view this content. Click here to join now