Jackie Hamilton
Field Engineer at QUADGEN WIRELESS SOLUTIONS INC- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
QUADGEN WIRELESS SOLUTIONS INC
-
1 - 100 Employee
-
Field Engineer
-
Jun 2018 - Present
-
-
-
Ericsson
-
Sweden
-
Telecommunications
-
700 & Above Employee
-
Switch Eng IV
-
Dec 2015 - Jun 2018
ATT LAB OPERATION/Redmond Washington Maintain 4 Ericsson switches that represented switch configuration in ATT markets Applied software patched in lab switches before they were applied in live markets Applied new software loads in the lab switches tested new products such as SIP and SIP-I trunks Tested new services LTE/4G, E911, Camel services, Uses Ericsson debug tools and Access 7 Network Integration Support turn up trunks on AT&T core sites in Southeast region. Knowledge of MSC ATCA Show less
-
-
-
Glow Networks
-
United States
-
Telecommunications
-
100 - 200 Employee
-
Field Engineer
-
Feb 2012 - 2013
Installed aws, lte cellular equipment for bot T-mobile and ATT Installed aws, lte cellular equipment for bot T-mobile and ATT
-
-
-
Att
-
Western United States
-
E911 Project Manager
-
May 2011 - Jan 2012
Scheduling and tracking work by several groups in testing and turn up of E9111 circuits. Scheduling and tracking work on Siads add Node B and RNC re-home. Knowledge of AT&Ts Granite, IWOS/AOTS, Access 7 and CTS systems Scheduling and tracking work by several groups in testing and turn up of E9111 circuits. Scheduling and tracking work on Siads add Node B and RNC re-home. Knowledge of AT&Ts Granite, IWOS/AOTS, Access 7 and CTS systems
-
-
-
IBISKA
-
Canada
-
IT Services and IT Consulting
-
1 - 100 Employee
-
Verizon MSC Upgrades
-
Oct 2010 - Apr 2011
IEMS removal of tools from the CMT in preparation for MTX-18 ONP. VSE Disk resizing for MTX-18 ONP. WPP projects as well as MC card removal for removal of the MS and addition of cards to the VSE for the ONP’s. All Verizon projects.\ Base Line upgrades from BL 16 to BL 17.1 Assisting customer with trunk turns up and switches operations IEMS removal of tools from the CMT in preparation for MTX-18 ONP. VSE Disk resizing for MTX-18 ONP. WPP projects as well as MC card removal for removal of the MS and addition of cards to the VSE for the ONP’s. All Verizon projects.\ Base Line upgrades from BL 16 to BL 17.1 Assisting customer with trunk turns up and switches operations
-
-
-
-
Nortel/Ericsson Tech support
-
1973 - 2003
Manager Technical Support 2000 – 2003 Provided Tier 1 Support for translations and hardware for the Greater Texas area on Nortel, Lucent and Ericsson switches. Project Manager for 911 migration, Mass Calling network, SS7, and new feature packages developed by vendors. Produced and delivered training classes for use by local technicians. • Developed ISO work procedures for switch alarms. Translations Manager 1998 – 2003 Managed a crew of 12 communication technicians responsible for the input of translations for DMS 100/250 switches in the South Texas Market on a critical time schedule. Maintained personnel performance records and conducted yearly reviews. Always met or exceeded all objectives assigned to the crew. Communications Technician 1973 – 1998 Worked with all aspects associated with inside and outside of plant. Installed and repaired local telephone lines including residential and business. Maintained emergency power generators, monitored and repaired Central Offices power supplies. As a Contractor Inspector, inspected and confirmed contractors work met ATT standards Show less
-
-
Education
-
Hill College
Associate of Arts and Sciences - AAS, Electrical and Electronics Engineering -
Angelo State University