Izabela Strubińska
Head of Operation at Swissroc Building Intelligence- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
polski Native or bilingual proficiency
-
angielski Full professional proficiency
-
niemiecki Limited working proficiency
-
hiszpański Elementary proficiency
Topline Score
Bio
Credentials
-
Procore Certification: Procore Administrator
Procore TechnologiesNov, 2022- Nov, 2024 -
Procore Certified: BIM Manager (Procore BIM)
Procore TechnologiesNov, 2022- Nov, 2024 -
Graphisoft Certified Archicad BIM Manager
GRAPHISOFTDec, 2020- Nov, 2024 -
Procore Certified: Architect
Procore TechnologiesDec, 2018- Nov, 2024 -
Graphisoft Certificate of Completion - Certified Archicad User
GRAPHISOFTMay, 2018- Nov, 2024 -
Autodesk Certificate of Completion Revit Architecture 2017 - modeling
AutodeskApr, 2017- Nov, 2024 -
Uprawnienia architektoniczne do projektowania bez ograniczeń
Izba Architektów Rzeczypospolitej PolskiejDec, 2015- Nov, 2024 -
Microsoft Project - Planowanie i realizacja przedsięwzięć
BizTech Konsulting S.A.Mar, 2015- Nov, 2024 -
Autodesk Certificate of Completion 3dsmax - basic level
AutodeskJun, 2008- Nov, 2024
Experience
-
Swissroc Building Intelligence
-
Poland
-
Architecture and Planning
-
1 - 100 Employee
-
Head of Operation
-
Sep 2021 - Present
-
-
Senior Architect
-
Apr 2021 - Sep 2021
-
-
BIM Coordinator - Architecture
-
Apr 2019 - Mar 2021
-
-
BIM Technician - Architect
-
Jan 2018 - Mar 2019
-
-
-
WMA Architekci Sp.zo.o.
-
Warsaw, Poland
-
Architect
-
Mar 2010 - Dec 2017
Responsibilities: - managing the design process from a conceptual stage to a final design - using BIM methodology - developing conceptual, preliminary and final design in accordance with law and other regulations of residential buildings, commercial buildings and educational buildings - preparing the complete design documentation necessary to obtain a planning permission - coordination of an architectural design with a building construction and technical building services - analysing and optimization of technical solutions - site visits - taking part in meetings with a real estate investor - preparing analyses of site absorbency and preliminary conceptual designs - 3D models of structural architecture and interior design - visualisations Achievements include: - work for the Main Designer and for the General Contractor from a conceptual to a realization during a project of an residential building with commercial facilities, offices and two levels of underground garages at Surowieckiego Street in Warsaw (area 9 150m2) with the adaptation of a commercial area for a supermarket, -residential buildings with commercials and underground garage at Wodna Street in Łódź - from preliminary to final design (area 14 000m2). - residential building with services and underground garage at Bairda Street in Grodzisk Mazowiecki - from a conceptual to final design (area 4360m2), - residential building with underground two-storey garage at Rejtana Street in Poznań - from a conceptual to a preliminary design (area 3500m2), - duplex houses at Cyprysowa Street and at Sasanki Street in Józefosław - from the concept to the executive design (area 3400m2), - library at Tyniecka Street in Warsaw from preliminary to final design (area 1000m2), - office building at Sienkiewicza Street in Piastów - from a conceptual to a preliminary design(area 850m2). Show less
-
-
-
Totalbud Sp.zo.o.
-
Warsaw, Poland
-
Civil Engineer
-
Mar 2015 - May 2015
Apprenticeship at General Contractor during construction of a residential building with commercial facilities and an underground garage in Warsaw, Lędzka Street Responsibilities: - participation in coordination meetings at the construction site, - participation in acceptance of a different stages of civil construction works. Apprenticeship at General Contractor during construction of a residential building with commercial facilities and an underground garage in Warsaw, Lędzka Street Responsibilities: - participation in coordination meetings at the construction site, - participation in acceptance of a different stages of civil construction works.
-
-
-
Totalbud Sp.zo.o.
-
Warsaw, Poland
-
Civil Engineer
-
Nov 2013 - Dec 2014
Apprenticeship at General Contractor during construction of an apartment building with commercial facilities, offices and two levels of underground garages in Warsaw, Surowieckiego Street. Responsibilities: - participation in coordination meetings at the construction site, - participation in acceptance of a different stages of civil construction works, - preparation of as-built documentation. Apprenticeship at General Contractor during construction of an apartment building with commercial facilities, offices and two levels of underground garages in Warsaw, Surowieckiego Street. Responsibilities: - participation in coordination meetings at the construction site, - participation in acceptance of a different stages of civil construction works, - preparation of as-built documentation.
-
-
-
SelinAr Pracownia Architektury i Wnętrz E. Mirowska
-
Łódź, Poland
-
Architect Assistant
-
Jun 2008 - Feb 2010
Responsibilities: - preparation of preliminary and final design of filling stations for PKN ORLEN S.A., taking into account applicable laws and regulations, -coordination of architectural design with building construction and technical building services. Responsibilities: - preparation of preliminary and final design of filling stations for PKN ORLEN S.A., taking into account applicable laws and regulations, -coordination of architectural design with building construction and technical building services.
-
-
-
MRPR ARQUITECTOS S.L.
-
Sevilla, Spain
-
Apprentice
-
Jun 2007 - Sep 2007
Responsibilities: - 3D models; - visualisations; - paper models of buildings and estates. Responsibilities: - 3D models; - visualisations; - paper models of buildings and estates.
-
-
Education
-
SGH Warsaw School of Economics
postgraduate studies, Project Management -
Lodz University of Technology
Msc. Architect, Architektura i Urbanistyka