Experience

    • Indonesia
    • Construction
    • 100 - 200 Employee
    • Co Team Leader CS01 FSMRB
      • May 2018 - Present

    • Manufacturing
    • 700 & Above Employee
    • Water Resources Manager
      • Apr 2010 - Sep 2014

      PT. Tirta Investama (Danone – Aqua) Water Protection Manager Ensure the water resources protection program is implemented, through Integrated Water Resources Management (IWRM) approach PT. Tirta Investama (Danone – Aqua) Water Protection Manager Ensure the water resources protection program is implemented, through Integrated Water Resources Management (IWRM) approach

    • Senior Manager Geotechnical Division
      • Aug 2006 - Jun 2010

      Coordination and managing of implementation of survey, investigation and evaluation works on site. Supervise for the earthworks for earth fill Dam, including for gallery, tunnel, and power plant construction. Supervision of hydrogeological drilling for observation well, test well and ground water monitoring well. Coordination and managing of implementation of survey, investigation and evaluation works on site. Supervise for the earthworks for earth fill Dam, including for gallery, tunnel, and power plant construction. Supervision of hydrogeological drilling for observation well, test well and ground water monitoring well.

    • Indonesia
    • Construction
    • 100 - 200 Employee
    • Geotechnical Engineer
      • Apr 1997 - Jul 2005

      Supervision of drilling, mapping geology, design dam, geological report for design Titab Dam. This project from Dept Public Work plant was located on bad terrain and there was potential for landslides. Iwan was assigned in soil investigation to analyst the soil mechanical data and to design for geological assessment Supervision of drilling, mapping geology, design dam, geological report for design Titab Dam. This project from Dept Public Work plant was located on bad terrain and there was potential for landslides. Iwan was assigned in soil investigation to analyst the soil mechanical data and to design for geological assessment

Education

  • Universitas Padjadjaran
    Master of Engineering - MEng, Teknik Geologi/Geofisika
    2014 - 2015
  • Universitas Pembangunan Nasional Veteran Yogyakarta