Impresa Percassi
-
Italy
-
Construction
-
100 - 200 Employee
-
Site Construction Project Manager
-
Nov 2019 - Present
EHPAD RESIDENCE "LA BELLE EPOQUE", MOUVAUX (FRANCE). 04/2022 – Actual - Construction of a retirement centre Project: EHPAD Résidence "La Belle Epoque" in Mouvaux (France) Total Amount of the Projects: 6 million Euros. Contractor Authority / Principal Client: EHPAD Résidence "La Belle Epoque" JOB POSITION & RESPONSABILITIES: Site Construction Project Manager HIGH BAY WAREHOUSE FERRERO ARDENNES, ARLON (BELGIUM). 11/2019 – Actual - Construction of a New High Bay Warehouse (4.500 sqm) for Ferrero Ardennes in Arlon (Belgium), including External Works (17.500 sqm), Water Basin and other Building Services (1.800 sqm) - Construction of a New Raffaello Mezzanine for Ferrero Ardennes in Arlon (Belgium), - Refurbishment works for Biscuit and Observatory Laboratory for CTH (Ferrero-Delacre) in Brussels (Belgium) Total Amount of the Projects: 31 million Euros. Contractor Authority / Principal Client: Ferrero Spa JOB POSITION & RESPONSABILITIES: Site Construction Project Manager Show less
-
-
-
Rizzani de Eccher
-
Italy
-
Civil Engineering
-
700 & Above Employee
-
Site Construction Manager
-
Apr 2018 - Jul 2019
PROJECT REFERENCES: LA CLOCHE D'OR - ILOT C : ENSEMBLE COMMERCIAL & RESIDENTIEL, LUXEMBOURG. Mall Building (LCO1) general data: 114.000 sqm of Parking underground area (4 floors); 26.000 sqm of Hypermarket area; 53.000 sqm of Shopping area; 13.500 sqm Roof technical rooms. Residential Building (LCO2) general data: 2 towers of 13 floors above Mall Building Total Amount of the Projects: 238 million Euros. Contractor Authority / Principal Client: LCO1 & LCO2 JOB POSITION & RESPONSABILITIES: Site Construction Manager Show less
-
-
-
Spic Internazionale (Holding De Eccher)
-
Jijel, Algeria
-
Site Construction Project Manager
-
Feb 2016 - Mar 2018
PROJECTS REFERENCES: DP0GN9 AQS NEW BELLARA STEEL WORKS. BELLARA INDUSTRIAL AREA, EL MILIA, JIJEL, ALGERIA. Steel Building Erection Works including: 23.000 tons of steel structure and 226.000 m2 surface of panel cladding and roofing. Equipment Erection Works including: 2.860 tons of N° 38 EOT cranes (including pre-assembly and electrical works). Civil Works including: 10.000 m3 of reinforced concrete and 12.000 m2 of industrial floors. Overall MHRS = 1,5 millions hours Total Amount of the Works: 25,5 million Euros (manpower and equipment: materials supply not included in Scope Of the Work). Contractor Authority / Principal Client: AQS (Algerian Qatari Steel) JOB POSITION & RESPONSABILITIES: Site Construction Project Manager Show less
-
-
-
Prodeco Limited Oil & Gas
-
Port Harcourt, Nigeria
-
Site Construction Project Manager
-
Jul 2013 - Dec 2015
PRODECO Ltd (ORLEAN INVEST Group) Nigerian EPC Construction Company in Oil & Gas Industry: civil works, buildings, port infrastructures and maintenance works. PROJECTS REFERENCES: ONNE PORT MULTI CENTER COMPLEX, PORT HARCOURT, NIGERIA. Complex including: Hotel with SPA, Gym and SOS Clinic, Restaurant with Lounge Bar and Bowling Alley, Auditorium, Academy, Exhibition Hall, Residential Buildings G+5, including all infrastructures and facilities. Overall MHRS 2,8 millions hours Total Amount of the Projects: 130 million Dollars. JOB POSITION & RESPONSABILITIES: Site Construction Project Manager Show less
-
-
-
BENTINI S.p.A.
-
Construction
-
1 - 100 Employee
-
Site Construction Project Manager
-
May 2009 - Jun 2013
BENTINI S.p.a. International EPC Turnkey Contractor in Industrial and Oil and Gas Projects. PROJECTS REFERENCES: 1. BIR SEBA FIELD DEVELOPMENT - PHASE 1. BLOCK 433a & 416b, TOUGGOURT REGION, ALGERIA. (2012 - 2013) - EPC Industrial Buildings Works, Living Quarters, Security Camp, Air Strip and Access Rodas. Overall MHRS = 2,8 millions hours Total Amount of the Projects: 75 million Euros. Contractor Authority / Principal Client: Joint Operating Company (SONATRACH/PVEP/PTTEP) JOB POSITION & RESPONSABILITIES: Site Construction Project Manager Duration: 15 months 2. MENZEL LEDJMET EAST PROJECT. BLOCK 405b ALGERIA. (2011 - 2012) Civil Works Contractor for CPF and EPC Contractor for Industrial Base, Base de Vie, Security Camp and Air Strip. Total Amount of the Projects: 190 million Euros. Contractor Authority / Principal Client: Joint Operating Company (SONATRACH/ENI/FCP) JOB POSITION & RESPONSABILITIES: Construction Manager of Special Business Units Duration: 12 months 3. GNL3Z PROJECT, ARZEW. ALGERIA. Construction of a GNL-train plant. (2009 - 2011) - Contractor for Civil Works and Tanks Projects. - Civil and Industrial Buildings EPC Project. Total Amount of the Projects: 350 million Euros (Industrial Buildings = 52,7 million Euros). Contractor Authority / Principal Client: SONATRACH JOB POSITION & RESPONSABILITIES: Construction Manager for Industrial Building Project Duration: 14 months JOB POSITION & RESPONSABILITIES: Civil Engineer Supervisor Duration: 8 months Show less
-
-
-
TIMCO MANAGEMENT
-
Canary Islands, Spain
-
Owner, Project Director
-
Jan 2006 - May 2009
Contractor Company and Engineering Services. Canary Islands, Spain. Sector: Residential and Industrial Buildings, and Civil Works. Total Amount of the Projects: 17,2 million Euros. Functions: Technical, economic and financial management of all projects in charged. Contractor Company and Engineering Services. Canary Islands, Spain. Sector: Residential and Industrial Buildings, and Civil Works. Total Amount of the Projects: 17,2 million Euros. Functions: Technical, economic and financial management of all projects in charged.
-
-
-
-
Site Construction Manager
-
2005 - 2005
Construction of "Sites" for the new GSM mobile phone network in all Mexican States. State of Guerrero (west region), Mexico. Functions: Coordination of all activities during construction phases, including engineering design, of approximately 150 Sites. Construction of "Sites" for the new GSM mobile phone network in all Mexican States. State of Guerrero (west region), Mexico. Functions: Coordination of all activities during construction phases, including engineering design, of approximately 150 Sites.
-
-
-
TILE HOUSE CANARIAS
-
Canary Islands, Spain
-
Technical Director
-
2003 - 2005
General Contractor Company. Canary Islands, Spain. Sector: Residential, Industrial and Public Buildings, Commercial Locals and Civil Works. Total Amount of the Projects: 19,6 million Euros. Functions: Coordination and supervision of Site Activities, Technical Office, Proposal Department and QA/QC Department. General Contractor Company. Canary Islands, Spain. Sector: Residential, Industrial and Public Buildings, Commercial Locals and Civil Works. Total Amount of the Projects: 19,6 million Euros. Functions: Coordination and supervision of Site Activities, Technical Office, Proposal Department and QA/QC Department.
-
-
-
NORTEL NETWORKS
-
Canary Islands, Spain
-
Site Construction Manager
-
2000 - 2002
Construction of "Sites" assigned to Nortel Networks (EPC Turnkey Project) for the new UMTS mobile phone network to be built in all Spanish regions. Functions: Coordination of all activities during construction phases, including engineering design, of approximately 200 Sites in Canary Island region. Construction of "Sites" assigned to Nortel Networks (EPC Turnkey Project) for the new UMTS mobile phone network to be built in all Spanish regions. Functions: Coordination of all activities during construction phases, including engineering design, of approximately 200 Sites in Canary Island region.
-
-
-
SIEMENS
-
Galicia, Spain
-
Construction Manager
-
1999 - 2000
Construction of "Sites" assigned to Siemens (EPC Turnkey Amena Project) for the new GSM mobile phone network to be built in all Spanish regions. Functions: Coordination and supervision of all construction activities of approximately 90 Sites. Construction of "Sites" assigned to Siemens (EPC Turnkey Amena Project) for the new GSM mobile phone network to be built in all Spanish regions. Functions: Coordination and supervision of all construction activities of approximately 90 Sites.
-
-
-
FREE LANCE
-
Friuli, Italy
-
Junior Civil Engineer
-
1997 - 1999
Collaboration with various Engineering Studios in Italy. Functions and responsibilities: calculation reports, drawings, technical assistance at sites (residential and industrial buildings). Collaboration with various Engineering Studios in Italy. Functions and responsibilities: calculation reports, drawings, technical assistance at sites (residential and industrial buildings).
-
-
-
Construction Company
-
Friuli, Italy
-
General Worker
-
1989 - 1996
Collaboration with construction companies during summer season in Italy. Construction, renovation and maintenance works in residential and industrial buildings. Collaboration with construction companies during summer season in Italy. Construction, renovation and maintenance works in residential and industrial buildings.
-
-
Education
-
Università degli Studi di Udine