Ivan Lawrence Arcilla, M.S., E.I.T.

Environmental Engineering Associate I at LA Sanitation & Environment
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Long Beach, California, United States, US
Languages
  • English Native or bilingual proficiency
  • Filipino Native or bilingual proficiency
  • Japanese Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Calgreen Inspector/Plans Examiner
    International Code Council
    Sep, 2023
    - Nov, 2024
  • Engineer In Training
    Board for Professional Engineers, Land Surveyors, and Geologists
    Jun, 2019
    - Nov, 2024

Experience

    • United States
    • Environmental Services
    • 100 - 200 Employee
    • Environmental Engineering Associate I
      • Aug 2022 - Present

      𝐇𝐲𝐩𝐞𝐫𝐢𝐨𝐧 𝐖𝐚𝐭𝐞𝐫 𝐑𝐞𝐜𝐥𝐚𝐦𝐚𝐭𝐢𝐨𝐧 𝐏𝐥𝐚𝐧𝐭 Secondary Treatment Process • Process Control Engineer overseeing secondary treatment process - Clarifiers, Oxygen Reactors, Cryogenic Oxygen Generation Facility, Effluent Pumping Plant (EPP), 1-mile and 5-mile outfall, Service Water Facility. Contiuously studies process data for process improvement and initiate pilot studies • Project Engineer and Plant liasion to multiple Capital Improvement Projects 𝐇𝐲𝐩𝐞𝐫𝐢𝐨𝐧 𝐖𝐚𝐭𝐞𝐫 𝐑𝐞𝐜𝐥𝐚𝐦𝐚𝐭𝐢𝐨𝐧 𝐏𝐥𝐚𝐧𝐭 Secondary Treatment Process • Process Control Engineer overseeing secondary treatment process - Clarifiers, Oxygen Reactors, Cryogenic Oxygen Generation Facility, Effluent Pumping Plant (EPP), 1-mile and 5-mile outfall, Service Water Facility. Contiuously studies process data for process improvement and initiate pilot studies • Project Engineer and Plant liasion to multiple Capital Improvement Projects

    • Australia
    • Professional Services
    • 700 & Above Employee
    • Senior Instrumentation and Controls Engineer
      • May 2022 - Aug 2022

      𝐏𝐡𝐢𝐥𝐥𝐢𝐩𝐬66 𝐑𝐨𝐝𝐞𝐨 𝐑𝐞𝐧𝐞𝐰𝐞𝐝 𝐑𝐞𝐧𝐞𝐰𝐚𝐛𝐥𝐞 𝐅𝐮𝐞𝐥𝐬 𝐑𝐞𝐟𝐢𝐧𝐞𝐫𝐲 𝐏𝐫𝐨𝐣𝐞𝐜𝐭 o Successfully assigned criticality to all the instrument loops using SmartPlant Instrumentation o Review of various engineering drawings, such as control system architecture, and P&IDs o Successfully maintained the quality of the instrument index in SPI 𝐏𝐡𝐢𝐥𝐥𝐢𝐩𝐬66 𝐑𝐨𝐝𝐞𝐨 𝐑𝐞𝐧𝐞𝐰𝐞𝐝 𝐑𝐞𝐧𝐞𝐰𝐚𝐛𝐥𝐞 𝐅𝐮𝐞𝐥𝐬 𝐑𝐞𝐟𝐢𝐧𝐞𝐫𝐲 𝐏𝐫𝐨𝐣𝐞𝐜𝐭 o Successfully assigned criticality to all the instrument loops using SmartPlant Instrumentation o Review of various engineering drawings, such as control system architecture, and P&IDs o Successfully maintained the quality of the instrument index in SPI

    • France
    • Engineering Services
    • 700 & Above Employee
    • Instrumentation Engineer
      • Aug 2021 - Mar 2022

      𝐁𝐚𝐤𝐞𝐫𝐬𝐟𝐢𝐞𝐥𝐝 𝐑𝐞𝐧𝐞𝐰𝐚𝐛𝐥𝐞 𝐅𝐮𝐞𝐥𝐬 𝐩𝐫𝐨𝐣𝐞𝐜𝐭 • Assembled the requisition packages of Pressure regulators, Flow Switch, and Sight Flow glass for construction into the site • Review of various vendor documents and drawings, such as dimensional drawings and sizing calculations. • Worked with various engineering departments to solve problems that would come up during the project • Reviewed P&IDs and used Bluebeam Revu to markup any P&ID changes 𝐁𝐚𝐤𝐞𝐫𝐬𝐟𝐢𝐞𝐥𝐝 𝐑𝐞𝐧𝐞𝐰𝐚𝐛𝐥𝐞 𝐅𝐮𝐞𝐥𝐬 𝐩𝐫𝐨𝐣𝐞𝐜𝐭 • Assembled the requisition packages of Pressure regulators, Flow Switch, and Sight Flow glass for construction into the site • Review of various vendor documents and drawings, such as dimensional drawings and sizing calculations. • Worked with various engineering departments to solve problems that would come up during the project • Reviewed P&IDs and used Bluebeam Revu to markup any P&ID changes

    • United States
    • Spectator Sports
    • 300 - 400 Employee
    • Pastry Cook
      • Jun 2021 - Aug 2021

    • Australia
    • Professional Services
    • 700 & Above Employee
    • Graduate Instrumentation and Controls Engineer
      • Sep 2019 - May 2020

      𝗪𝗼𝗿𝗸𝗲𝗱 𝗶𝗻 𝘁𝗵𝗲 𝗠𝗮𝗿𝗮𝘁𝗵𝗼𝗻 𝗗𝗶𝗰𝗸𝗶𝗻𝘀𝗼𝗻 𝗥𝗲𝗻𝗲𝘄𝗮𝗯𝗹𝗲 𝗗𝗶𝗲𝘀𝗲𝗹 𝗥𝗲𝗳𝗶𝗻𝗲𝗿𝘆 𝗣𝗿𝗼𝗷𝗲𝗰𝘁• Assisted the Requisition Engineer in the purchase of various Instruments, such as transmitters, orifice plates, rotameters, etc. to be installed in the construction of the refinery. My assistance expedited the purchase of the instruments, which were behind schedule.• Created technical bid evaluations of quotations from vendors to send to the client for approval.• Continuously generated instrument datasheets for various instruments using SmartPlant Instrumentation• Interacted with engineers from various departments and vendors to expedite and solve engineering problems that would come up throughout the project. • Assisted in the creating the I/O list for Construction Work Area 5 and 6.• Assisted in the writing of Engineering Work Package to be issued to the client• Maintained Loop drawing tracking log database. Internal review of multiple vendor documents, such as Orifice plate calculations, skin and multipoint thermocouple drawings, etc• Worked with designers on QA/QC and issue resolution of various wiring drawings, i.e. termination reports, Junction Box drawings• Continously maintained and generated from SPI the Instrument Index for various areas of the Plant, constantly updating the Instrument Index.• My proficiency in SmartPlant Instrumentation expedited most of the tasks that needed to be done when I arrived on the project Show less

    • Graduate Instrumentation and Controls Engineer
      • Jun 2019 - Aug 2019

      𝗪𝗼𝗿𝗸𝗲𝗱 𝗼𝗻 𝘁𝗵𝗲 𝗦𝗮𝘂𝗱𝗶 𝗔𝗿𝗮𝗺𝗰𝗼 𝗨𝘁𝗵𝗮𝗺𝗮𝗻𝗶𝘆𝗮𝗵 & 𝗦𝗵𝗲𝗱𝗴𝘂𝗺 𝗚𝗮𝘀 𝗖𝗼𝗺𝗽𝗿𝗲𝘀𝘀𝗶𝗼𝗻 𝗣𝗹𝗮𝗻𝘁 𝗣𝗿𝗼𝗷𝗲𝗰𝘁o Continuously generated and revised engineering documents, such as instrumentation datasheets, P&IDso Trained in the use of SmartPlant Instrumentation for sizing calculations of different types of valves and for organizing the Instrument Index, which gave me the knowledge to be proficient in the program without assistanceo Evaluated the material take-off for the various Instruments to be purchased for submission to the detailed engineering design companyo Successfully improved the quality of the Instrumentation Engineering package to be submitted to the client Show less

    • Philippines
    • Oil and Gas
    • 500 - 600 Employee
    • Supply Intern
      • Jun 2018 - Aug 2018

      o Successfully did multiple demurrage and oil loss calculations for various shipments of petroleum, which significantly decreased the workload of my supervisors o Organized the data in Excel of the purchase of Petroleum, and other products in the last 5 years of the company for analysis of the company’s growth o Successfully did multiple demurrage and oil loss calculations for various shipments of petroleum, which significantly decreased the workload of my supervisors o Organized the data in Excel of the purchase of Petroleum, and other products in the last 5 years of the company for analysis of the company’s growth

    • Philippines
    • Food and Beverage Services
    • 700 & Above Employee
    • EHS Intern
      • Feb 2018 - Apr 2018

      o Managed the data in Excel of the OSHA reports across the 13 sites of the company for analysis of the incident reports o Assisted in the creation of Excel macros for input of incident reports for future use of the company o Designed posters for promotion of EHS advocacies o Managed the data in Excel of the OSHA reports across the 13 sites of the company for analysis of the incident reports o Assisted in the creation of Excel macros for input of incident reports for future use of the company o Designed posters for promotion of EHS advocacies

Education

  • California State University, Fullerton
    Master of Science - MS, Environmental Engineering
    2021 - 2023
  • De La Salle University
    Bachelor of Science - BS, Chemical Engineering
    2013 - 2018

Community

You need to have a working account to view this content. Click here to join now