PECSA E&C POSCO SAUDIA ARABIA
-
1 - 100 Employee
-
Construction Manager
-
Dec 2016 - Present
Project description: Construct different 5 prototypes of high rise hotels (24 floors) for public investment fund(Hajj City), this project budget is 3,500,000,000 S.R. Responsibility: • Inspects property and units under construction on a regular basis to ensure the work conforms to specifications, budget and schedule and initiates any repair or replacement needs and/or adjustment of working procedures. Regularly communicates with the project team regarding unit and property improvement status. • Reports on work progress and budget matters to senior construction manager. • Responsible for communicating with people involved in a project (owners, consultant, subcontractors, etc.), and with a design team. • Interprets and explains contracts and technical information to workers and other professionals. • Selects appropriate construction methods and strategies. • Interprets specifications and company policies to subordinates and/or contractors and enforces safety regulations. Analyzes and resolves work problems, including worker complaints and grievances. • Take actions to deal with the results of delays, bad weather, or emergencies at construction site. • Plan, organize, and direct activities concerned with the construction and maintenance of structures, facilities, and systems. • Submit the site daily, weekly and monthly reports for all the project's activities, manpower, equipments & site store to senior construction manager. • Schedule the project in logical steps and budget time required to meet deadlines. • Reviews and approves all invoices pertaining to the construction department and submits all approved bills to the regional accounting department for processing and payment. • Evaluates specifications for plan procedures, start and completion dates, and staffing requirements for each phase of the construction project. • Estimates the scope of work and obtains a minimum of three bids for comparison and completion of each job. Show less
-
-
-
Saudi Oger Ltd.
-
Construction
-
700 & Above Employee
-
Senior Site Engineer
-
Jan 2012 - Jul 2016
Project description: Construct different 8 prototypes of King Abdullah project to develop the buildings of the Ministry of Interior (KAP1),this project budget is 7,500,000,000 S.R. Responsibility : • Follow-up the sub-contractor works in all stages (concrete works, finishes works). • Installation of 4 different prototype building 20000 m2 of composite slabs. • Fully responsible for the inspections of all works at site. • Direct, lead and support other engineering and skilled personnel in managing and executing multiple tasks and projects. • Study and assess drawings, plans, specifications and other documents relating to construction projects. • Responsible for communicating with project's team, equipment suppliers, sub-contractors and client. • Following-up external works at site setting out like installing (water,sewage,gas) systems, manholes, water & septic tanks, and pavement works. • Ensuring that all materials used and work performed are as per specifications. • Following-up the safety procedures (HSE roles) at the site. • Arranging and submit site daily, weekly and monthly reports for the project's activities, manpower, equipments & site store to consultant and client. • Quantities surveyor to survey all executed quantities & review all invoices submitted from sub-contractor. • Delivering construction project with the desired quality on time within budget. • Programming and scheduling of mechanical, electrical and automation works on site and ensure compliance with project programme for timely completion of the works. Show less
-
-
-
saudi binladin group
-
Construction
-
700 & Above Employee
-
Site Civil Engineer
-
Jan 2010 - Dec 2011
Project description: Construct different 7 prototypes of Strategic project to develop the buildings of the Ministry of Interior (KAP0), this project budget is 4,500,000,000 S.R. Responsibility : • Follow-up the sub-contractor works in all stages (concrete works, finishes works). • Installation of 3 different prototype building 14000 m2 of composite slabs. • Reviewing project drawings and preparing all necessary shop drawing, RFI & MIR for consultant approvals. • Fulfilling the consultant comments. • Quantities surveyor to survey all executed quantities & review all invoices submitted from sub-contractor. • Fully responsible for the inspections of all works at site. • Check survey works as leveling, verticality and coordination and check the survey report before starting. • Following-up submission and approval of all variation & change orders. • Coordinating for all running activities at site and reporting to project manager the status of works at site. • Arranging and submit the site daily, weekly and monthly reports for all the project's activities, manpower, equipment & site store to consultant and client. • Making calculation for all materials needed at site. • Following-up external works at site setting out like installing (water,sewage,gas) systems, manholes, water & septic tanks, and pavement works. • Coordination between civil works and electrical and mechanical and avoid conflicts. • Delivering construction project with the desired quality on time within budget. • Following-up the safety procedures (HSE roles) at the site. • Skill in reading and interpreting plans and specifications to compare them with construction in progress. Show less
-
-
-
Talaat Moustafa Group
-
Egypt
-
Real Estate
-
700 & Above Employee
-
Site Civil Engineer
-
Aug 2007 - Dec 2009
Project description : Integrated town in Cairo city consist of villas, buildings & malls (Madinaty project). Responsibility : • Responsible for all stages of concrete constructions (excavation, foundation, insulation, back-filling, columns, composite slabs). • Responsible for all stages of finishing works(blocks, plaster, flooring, painting, gypsum board). • Installation of 6 villas 8000 m2 of composite slabs. • Installation of 2 building 8000 m2 composite slabs with mezzanine. • Responsible for each job and check the site like access, equipment, tools and materials to finish work without any optical. • Quantities surveyor to survey all executed quantities & review all the invoices submitted from sub-contractor. • Reviewing project's drawings and preparing all necessary shop drawings, RFI & MIR for consultant approvals. • Coordinating with different teams (Engineering /Customer Service/ Factory). • Following-up submission and approval of all variation & change orders. • Arranging and Submit the site daily, weekly and monthly reports for all the project's activities, manpower, equipment and site store to consultant and client. • Check survey works as leveling, verticality and coordination and check the survey report before starting. • Preparing method of statement for each project and handling the QA/QC issues. • Raising site claim for any discrepancy between the drawing and the delivery materials and for any problem and establish the error code (Fabrication /Erection /Engineering). Show less
-
-
Education
-
Zagazig University
Bachelor's Degree, Civil Engineering