ISHENGIR
-
Turkmenistan
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
-
Jan 2007 - Present
-
-
-
Jan 2019 - Dec 2019
Inspection, procurement of material, cleaning, repair, testing
-
-
-
Jan 2019 - Dec 2019
Open up flange tie-in of the intended access way; temporary dismantle and safely secure all spools to the access way; to pull out, to clean & repair the tube bundle; to clean the reboiler internally and reinstate the reboiler; to conduct leak test on the affected flange tie ins after reinstatement; welding works; scaffolding works. 120T crane lifting works.
-
-
-
Jan 2019 - Sep 2019
Lifting works, water bedding works, piping welding works, structural welding works.
-
-
-
Jan 2018 - Dec 2018
Piping structural welding works, spools fabrication; leak test performing; NDE; insolation works; lifting operations.
-
-
-
Jan 2018 - Dec 2018
Engineering work, design, production and construction. Replacing the roof covering, cleaning the coating of concrete, restoring expansion joints, sealing shrink seams. Civil works were carried out, pouring concrete, reinforcement, welding, installation work. Electrical installation work.
-
-
-
Feb 2018 - Oct 2018
Engineering work, design, production and construction. Replacing the roof covering, cleaning the coating of concrete, restoring expansion joints, sealing shrink seams. Civil works were carried out, pouring concrete, reinforcement, welding, installation work. Electrical installation work.
-
-
-
Jan 2018 - Oct 2018
Cleaning 2 diesel tank, 2 water tank & 1 acid tank; repairing, welding works; blasting and painting, installation and insulation works.
-
-
-
Jul 2017 - Jun 2018
Engineering design work. The supply of communications. Installation of a checkpoint structure for the main post on the territory, with the installation of an information board and the introduction of automated control systems at additional entrances, coating on an emergency helipad.
-
-
-
Dec 2017 - Mar 2018
Engineering design work. Development and laying of engineering communications. Installation of the control room for the observation base and life support systems. The establishment of communication between the central office. Commissioning works.
-
-
-
May 2017 - Dec 2017
Replacing heat and thermal insulation with subsequent rough coating and painting. Plastering and painting work on the facade of the building. And welding work to strengthen the structures.
-
-
-
Mar 2017 - Dec 2017
Engineering and design work on the modernization of the fire station at the OGT. Development and production of gates for the fire station, consisting of welding and assembly work. Supply and installation of heating systems for the garage and modernization of ventilation systems.
-
-
-
Jan 2017 - Dec 2017
Engineering design work. Production, painting and installation of six water tanks with thermal protection and heating systems with a pumping station connecting pipeline with the output to the pier to supply ships with drinking and process water. Production painting and installation of a complex of eight underground wastewater tanks. The power supply of this system is made through the installation of the main switchboard. Production painting and installation of two leading lights with height 24 and 8m. Which include satellite navigation systems. Show less
-
-
-
Apr 2016 - Jul 2017
Materials procurement for distribution substations, logistics and transportation. Engineering, design, manufacture, construction and installation, consisting of reinforced concrete, welding and assembly, painting works.
-
-
-
Feb 2017 - Jun 2017
Cleaning the gas condensate tank T-3903 from oil sludge on the territory of the onshore gas terminal, by manual, mechanical and chemist mechanized methods, with following repair and inspection.
-
-
-
Apr 2016 - May 2017
Structural and piping welding works, hydro test; fire alarm installation; electrical works and electrical upgrading, blasting works and painting works, civil works; lifting works; racking system purchasing, delivery, installation and testing; fabrication and installation roof ventilation system; new gates fabrication; relocation and transportation of use item for upgrading warehouse work.
-
-
-
Jun 2016 - Apr 2017
Construction of the cassion inspection site, crushing and chemical site, earthworks, welding, electrical, reinforced concrete, pipe laying and communications, installation of fire safety systems and fire extinguishing systems in the berth berth and installation of hydrants and fire extinguishing systems at the Petronas supply base.
-
-
-
Sep 2015 - May 2016
Civil works; earth works; excavation works.
-
-
-
Mar 2015 - Dec 2015
Replacing heat and thermal insulation with following coating and painting.
-
-
-
May 2014 - Jan 2015
Inspection, welding, installation, installation and test work.
-
-