Ir. Ts. Zainuddin Mohamed P.ENG,P.TECH,MIEM,MIRSE,ACPE,CET,JEK
General Manager of Projects at Global Rail Project Sdn.Bhd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Certified Asean Chartered Professional Engineer
The ASEAN SecretariatAug, 2021- Nov, 2024 -
Competent Electrical Engineer 132kV
Suruhanjaya TenagaJun, 2021- Nov, 2024 -
Certified Engineering Technologist (CET)
Board of Engineers MalaysiaMay, 2021- Nov, 2024 -
Certified Professional Technology in Electrical and Electronic
Malaysia Board of TechnologistsNov, 2020- Nov, 2024 -
Member of The Institution of Railway Signal Engineers
Institution of Railway Signal EngineersAug, 2015- Nov, 2024 -
Professional Engineer With Practising Certificate (P.Eng)
Board of Engineers MalaysiaDec, 2008- Nov, 2024 -
Member of The Institution of Engineers Malaysia(MIEM)
The Institution of Engineers MalaysiaMar, 2008- Nov, 2024
Experience
-
Global Rail Sdn Bhd
-
Construction
-
1 - 100 Employee
-
General Manager of Projects
-
Jan 2012 - Present
Responsible for :-1. Managing project in day-to-day operations 2. Liaise with Client, Specialists/Sub-Contractor and various product supplier3. Management of all projects secured by the company.4. Managed the design, installation, testing & commissioning, QA/QC and safety of the project with reference to the contract documents(i.e Technical specification and Terms of reference)5. Attend/chairs Project Progress or Technical Meeting with client and several others meetings with the specialist sub-contractor Bid proposals and quotation for “Request for Quotations”, tenders and enquiries.6. To manage daily to monthly activities and provide information to Design Manager, Construction Manager, Project Engineer and Site Supervisor in execution of the project.7. To report on work accomplish and actions required to maintain progress against schedule to Managing Director/Operation Director.8. Establishing plans, budgets and result measurement, allocating resources, reviewing progress and making mid course corrections Show less
-
-
Project Manager
-
Dec 2007 - Dec 2011
Projects managed:-1. Project Manager for Electrification System of the Development at KTMB Batu Gajah Depot.2. Project Manager for construction of TCBL at the KTMB Sentul – Batu Caves Electrified Double Track Project.3. Project Manager for the KTMB remodelling of signalling system in Kuala Lumpur area involving 5 new CBI interlocking.4. Project Manager for the design, supply, installation, testing and commissioning of Signalling, Electrification and Communication System for a new KTMB EMU Depot at Seremban. Show less
-
-
-
Balfour Beatty plc
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Maintenance/Project Manager
-
Apr 2004 - Nov 2007
Responsible for:-1. Attend Project Progress and Technical Meeting with client2. Prepare monthly report for management3. Undertake regular team briefs, site tours and inspection on works completed across the OCS and Power Supply(TPS) areas, identifying best practice and areas for improvement4. To report on work accomplished and actions required to maintain progress against schedule/baseline program to the client and Managing Director.5. Setup Safety, Health, Environment and Quality certification that included the IMS for project activities.6. Ensure that all projects are delivered on-time, within scope and within budget7. Manage changes to the project scope, project schedule, and project costs using appropriate verification techniques8. Prepare and have alternate plans ready in case the main plan fails or runs into problems that are beyond human control9. Create a pleasant and positive work atmosphere where all contributors feel important and responsible.10. Coordinate between various departments and do not allow issues to crop up. 11. Overcome obstacles and bottlenecks without much difficulty. Show less
-
-
Overhead Catenary System (OCS) Engineer
-
Dec 2000 - Mar 2004
Responsible for:-1. Prepared method statements for the site works2. Supervise a group of supervisors, technicians and linesman at site either for installation or maintenance works.3. To prepare site inspection reports to record activities at site4. To report on work accomplished and actions required to maintain progress against schedule5. To prepare the work planning, monitor daily activities and provide the monthly report to client6. To execute other related duties as and when required by immediate superior.7. Carry out any design work for OCS in any Electrification System Project8. Conduct the basis OCS training for staffs and clients Show less
-
-
-
KTM Berhad
-
Malaysia
-
Rail Transportation
-
1 - 100 Employee
-
Technical Assistant (OCS,TPS & SCADA)
-
Sep 1996 - Nov 2000
Responsible for:- 1. To assist and advice HV Maintenance and Technical Manager on investigation of equipment failure to prevent re-occurrence 2. Responsible to carry out any other technical work associated with high voltage fixed equipment as required in Electrification System. 3. Authorized Person to operate 25kV Isolator. 4. Checking, issuing and recording receipt of isolation diagram and isolation instruction for high voltage system. 5. Investigation in to requests from Civil Engineering for track lifts, track slues or alternations to CANT that determine effected on overhead line equipment. 6. Liaise with Power Supply Unit regarding Isolation requirement for minor and major work activities at Feeder Station, MPTSL, TSL and Tie Breaker. 7. Liaise with Power Supply Executive to supervise maintenance works for equipment such as transformer, circuit breaker, isolator, air con, RTU, SCADA and fire alarm at high voltage compound areas. 8. Carry out any other tripping report for KTMB Electrification System and investigate any incident or equipment failure. 9. Calculation and checking of Protection System Setting. 10. Ensure all logs, report, file and records are completed in line with the instructions, regulation etc. governing the operation of the ECR. 11. SCADA system application 12. Manage the routine ‘House – Keeping’ procedures for ECR SCADA equipment in line with the ECR instruction and standing orders. 13. When required provide input from the ECR to the planning of Outages and Isolation for routine maintenance or engineering works. 14. Liaise with Way Lift Contractor on OCS/PS requirement in KTMB System 15. To review the design submissions for railway electrification system, method statement with reference to the KTMB requirements(i.e. Technical Specifications, General Requirements, etc) 16. To check and verify OCS and Power Supply Specifications 17. To monitor the executions of work at site the by contractor Show less
-
-
-
Harris Semiconductor Inc
-
Belgium
-
Technician
-
Jun 1995 - Aug 1996
-
-
Education
-
Universiti Teknologi Malaysia
Bachelor’s Degree, Electrical Engineering (Power) -
University Technology Malaysia
Diploma in Engineering, Electrical (Power)