Ir. Nugraha Agung Wibowo, M.T., IPM

Assistant Vice President Electrical Maintenance at PT Pupuk Kujang
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Cikampek, West Java, Indonesia, ID
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Accident Investigation
    Badan Nasional Sertifikasi Profesi (BNSP)
    Jan, 2022
    - Oct, 2024
  • Insinyur Profesional Madya (IPM)
    The Institution of Engineers Indonesia (PII)
    Jan, 2022
    - Oct, 2024
  • Teknisi K3 Listrik
    Badan Nasional Sertifikasi Profesi
    Mar, 2015
    - Oct, 2024
  • Sertifikat Insinyur Proffersional
    Persatuan Insinyur Indonesia
    Mar, 2022
    - Oct, 2024
  • Hazop Professional
    Badan Nasional Sertifikasi Profesi
    Aug, 2020
    - Oct, 2024
  • Energy Auditor
    Badan Nasional Sertifikasi Profesi
    Oct, 2019
    - Oct, 2024

Experience

    • Indonesia
    • Chemical Manufacturing
    • 300 - 400 Employee
    • Assistant Vice President Electrical Maintenance
      • Jan 2023 - Present

    • Jr. Assistant Vice President Electrical Maintenance
      • Dec 2020 - Feb 2023

    • Electrical Maintenance Assistant Superintendent
      • Dec 2018 - Dec 2020

      Developing the protection system coordination in order to achieve the highest reliability of power distribution. Establishing the best strategy for operation mode in power generation and integration scheme.

    • Electrical Engineer
      • Jul 2013 - Dec 2018

      - Executing predictive, preventive and corrective maintenance work for all electrical power system equipment ( gas turbine generator, switchgears, transformers, and induction motor). - Schedulling equipment and material list for predictive maintenance- Conduct a design for new expansion, choosing and sizing electrical equipment, reconfigure coordination protection system.- Troubleshooting electrical problem on power generation and distribution system.- Maintaine proper records of all jobs performed in the SAP application ( Modul PM ) Show less

    • Construction Manager
      • Jan 2022 - Present

    • Senior Electrical Project Engineer
      • Jan 2021 - Dec 2021

    • Assistant Project Engineer
      • Jun 2018 - Dec 2018

      - Conduct the survey of available relays order to obtain the best practice of electrical protection system - Creating the Owner Estimation (OE), Bill of Quantity (BOQ) , and Terms of Reference (TOR) for power system expansion. - Several Clients : PT. Pertamina EP Cepu , Pertamina RU IV Cilacap - Conduct the survey of available relays order to obtain the best practice of electrical protection system - Creating the Owner Estimation (OE), Bill of Quantity (BOQ) , and Terms of Reference (TOR) for power system expansion. - Several Clients : PT. Pertamina EP Cepu , Pertamina RU IV Cilacap

    • Indonesia
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Engineering Development Center
      • Feb 2012 - Dec 2012

      - learn about proses production manufacture and develop product design manufacture. - make some work instruction in supply part on production proses with kanban card system supply. - make some improvement design and supporting tolls on supply part proses production. - learn about supply chain management on manufacture proses, example : "kanban card" & JIT " Project Training on Astra Visteon Indonesia (one of manufacturing subsidiaries of PT ASTRA OTOPART) - Engineering Change Proses --->> check & make list of change items which extracted from 160(latest) technical drawing in change number update. - Analysis Calibration Machine --->> collect data problem of calibratiopn proses. Learn & bones to know the root causes of problem. - Build some Work Intruction - Build Andown Lamp --->> design diagram electric with multisim sofware. Show less

    • Oil and Gas
    • 1 - 100 Employee
    • INTERNSHIP
      • Sep 2010 - Dec 2010

      The practical work was targeted to focus specifically on observing the power system equipment maintenance aspects in the company. - I observed how they do the inspection and maintenance on power system equipment in substation. - I trained about the specification, standart and working instruction to do the inspection and maintenance on power system especially tie transformer. The practical work was targeted to focus specifically on observing the power system equipment maintenance aspects in the company. - I observed how they do the inspection and maintenance on power system equipment in substation. - I trained about the specification, standart and working instruction to do the inspection and maintenance on power system especially tie transformer.

Education

  • Institut Teknologi Sepuluh Nopember (ITS)
    Master's degree, Electrical Power Transmission Installation and Protection
    2017 - 2019
  • Universitas Gadjah Mada (UGM)
    Bachelor's degree, Electrical and Electronics Engineering
    2007 - 2011
  • Institut Teknologi Bandung
    Insinyur (Ir), Engineering, Engineering
    2021 - 2022

Community

You need to have a working account to view this content. Click here to join now