    • Senior Electrical Engineer
      • Oct 2015 - Present

      Deepwater Maintenance Team (2015 - To Date) Roles and responsibilities include to carry out preventive and corrective maintenance activities for electrical equipment (generators, transfomers, switchgears, drive, motors, UPS and HVAC) both management and site activities in accordance with HSSE, standards (DEP/ IEC) and operation requirement with a team of engineers and technicians. Involved in contract management, procurement, planning and scheduling, site execution, cost estimation, condition monitoring, reliability improvement, and troubleshooting. The dimension of the assets include two oils and gas semi floating production systems offshore Sabah with oil production of over 200kbpd, with water injection, gas re-injection and export system. Key Experience: - Lead preventive maintenance for electrical systems: Preventive maintenance for Brush Alternator, AVR, PMS & accessories and KATO diesel generators. In-house AC UPS batteries change-out (2000pcs) and discharge test. Preventive maintenance for MV & LV motors including explosion proof inspection Protection relays secondary injection test for ABB REF, REM and RET relays. Preventive maintenance for 11kV VCU, VCB and 0.4kV ACB breakers, busducts and switchboards. - Lead team in investigation and identification for MV & LV motors failure (Submersible motor, Ex 'p' motor, etc), MV and LV transformers failure (rectifier transformer), UPS faulty (e.g. DC CT failure, capacitors, etc), ABB ENMCS and INSUM MCC system (e.g. loss of communication btw modbus protocol, OPC server, etc). - Lead team to troubleshoot issues with Hypochloride system. Develop and implemented reliability improvement plan. - Lead team to carry out ENMCS Load Shedding and ATSL system modification (improvement scheme for the existing design). - Lead team for installation of 1.2MW diesel genset in order to provide power supply for utilities at offshore platform during 1 month shutdown. - Involved in GE LM2500+ DLE turbines mapping. Show less

    • Electrical Engineer
      • Sep 2012 - Sep 2015

      Maintenance Project Execution Team (2012 - 2015) Carried out the following brownfield projects which actively involved in detailed design, tender evaluation, FAT, installation, hook-up, testing and commissioning: (1) Upgrade/ Retrofit/Replace Aging F23KA UPS 7700 (30kVA) (2) Upgrade SFJT-C Instrument Air Compressor (3) Upgrade Switchgear SG-3 and MCC-104 at F6KA due to obsolescence (4) Change-Out of Instrument Protective System (IPS) and Fire & Gas (FGS) for F6, F23 and E11 platforms due to obsolescence (5) Replace Obsolete Saft Nife AC UPSses at M3 Platform (6) Replacement of SFKA K2400/2500 Compressor Air Cooler (7) E11PA Diesel Fire Water Pump Change-Out Show less

    • Malaysia
    • Civil Engineering
    • 300 - 400 Employee
    • Electrical Engineer
      • May 2008 - Aug 2012

      Power Plant Projects: Involved in detailed design engineer and owner engineer for power plants in Malaysia and Overseas: (1) Khulna and Sirajganj 150MW Peaking Power Plant (2) 1x1000MW Tanjung Bin Coal Fire Power Station (3) Existing Coal Stockyard Extension Project at Manjung Power Station Key responsibilities for the above projects: - Prepared specification and technical tenders related to Electrical and C&I system - Actively involved in detailed design on contractor and vendor's drawings and calculations (e.g. short circuit, cable sizing, grounding calculation, etc) - Prepared engineering cost estimation and cost evalution report Renewable Energy Projects (Solar Fit in Tariff Plant): Involved in detailed design, execution, testing and commissing for solar projects. The Building- Integrated Photovoltaic (BIPV) system is the configuration adopted by all system developers which are being implemented in Klang Valley region utilizing the rooftops of existing factory/ warehouse buildings for solar PV panels. Involved in three existing warehouse's rooftops adopted BIPV system: - Total Logistic Service Sdn Bhd (1980kWp) - Konsortium Logistic Bhd (3510kWp) - Central Forwarding Agency Sdn Bhd (504kWp) Railway Project: Involved detailed design for KLJ line LRT extension project which consist of 12 station packages, 10 traction power substation package and 2 switching substations. Show less

Education

  • Universiti Putra Malaysia
    Bachelor of Engineering - BE, Electrical and Electronics Engineering
    2004 - 2008