Ioan Dabija

Maintenance Manager at COBA Automotive
  • Claim this Profile
Contact Information
Location
Ploieşti, Prahova, Romania, RO
Languages
  • French -
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Mike Bolduc

Ioan was a pleasure to work with in Iraq, his knowledge and mentoring of our junior techs was invaluable to our maintenance team and which I am very grateful for... I wish Ioan the best in his future endeavors.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Motor Vehicle Manufacturing
    • 1 - 100 Employee
    • Maintenance Manager
      • Apr 2020 - Present

    • Maintenance Supervisor
      • Mar 2018 - Mar 2020

    • Plant @ Project Manager
      • Jan 2016 - Aug 2017

      • Managed a team of 100 employers and engineers of production • Managed of production costs and lines efficiency • Managed the product quality;• Monthly report of production versus costs;• Implemented the new projects and contacted the equipment manufacturers; negotiated the new project contracts and prices. Run the new projects – 100 million Euro with 20 %saving based on technical solution.• Strait contact with owners for new investments;• Coordination and implementation of Production and quality standards requested by international clients (DoS USA ) ;• Facilitated on-site training sessions for new production lines • Managed and supervision of all company activities to reduce the raw material and energetic costs ;• Negotiation with raw material suppliers ;• Represented the Company to International Exhibition and negotiated with suppliers for new projects ; Show less

    • Project Manager RAYA Plant
      • Jan 2015 - Jan 2016

      Raya project included design ,execution and coordination of next task : building , government power , generator power , auxiliaries , Reverse osmosis systems , blowing/packaging line .In this project I coordinate:1.- Power Government team for execution of medium voltage transformers / power line / change over panels . 2.- Building execution with minimum cost and in accordance with the rest of requirements for heavy machineries , weather conditions , materials available on site to reduce the cost and to synchronize with the rest of activities ;Iraqi construction company 3.-Generator power – the main task was to utilize to maximum the cost by using the materials form site . The cost was cut by rebuild the outgoing panels , using the existing circuit breakers available generators and existing cables ;Authorized Cummins Iraqi company .4.-Auxiliaries – included a.– lighting – design of low power consumption lights (LED ) b. – HVAC – overhaul the existing HVAC , positioning the HVAC in concordance with rest of machineries , coordinate the ducting with Iraqi Company ;c.- Low and high air pressure station – to reduce the project cost , I used the compressors existing from old lines , with overhaul of compressors , dryers , air tanks , and recalculate the air pressure & flow required by line manufacturer .d.- Reverse Osmosis systems – I redesigned the RO systems , to work as master/slave without to change the software only modify the pipes connections , all in accordance with water flow required by new line . 5.- Blowing/packaging line – coordinate with Sacmi project manager all details :a. Time execution ;b.all necessary documents and data ;c.all raw materials to check the line at right time and with low costs ;d. work synchronization with site situation ;e. all travel/visa documents for Italian tech ;• Monitoring the subcontractors to ensure guidelines are maintained ;• Overseeing the accounting, costing and billing . Show less

    • Site Maintenance Leader
      • Jan 2012 - Jan 2015

      Maintenance for VCB water plant and more Maintenance for VCB water plant and more

    • Technical Service Manager
      • Jan 2011 - Aug 2011

      Technical Service Manager - Bergenbier Ploiesti Responsibilities: Maintenance management for all machineries and production lines from the Plant .- 7 packaging lines ; Bier production lines ; Heat station ; CO2 station ; Waste water Plant ;Air compressor station ; Implement maintenance processes and services (for the entire plant) according to engineering, safety and environment legal and company's standards; - Manage the maintenance CAPEX programs with maintenance providers; - Settle and agree on the service levels for the maintenance activities; - Monitor and assess maintenance and equipment performance and contractor's services; - Manage maintenance budgets, costs estimates, studies; - Control and report periodically on maintenance service levels, assets performance and budgets and initiate corrective actions;Manage the KPI’s according with the budget ; - Participate in the procurement process and selecting maintenance p Show less

    • United States
    • Defense and Space Manufacturing
    • 1 - 100 Employee
    • Site Maintenance Supervizor
      • Jan 2007 - Aug 2010

      • Direct and supervise all maintenance personnel • Receive and process all work orders • Assign, coordinate and supervise all maintenance of machinery, equipment and buildings • Order and receive parts and equipment • Seek out and recommend more efficient practices and procedures for maintenance and construction work within this plant • Assist maintenance employees in making repairs and adjustments to machines and equipment • Evaluate machine performance and suggestions for improvements • Recommend P.M. and lubrication programs and procedures within plant • Maintain a constant vigil within plant for safety hazards • Communicate with operations, sanitation, shipping, Q.C., security and other departments within plant to insure cooperation and coordination of services • Prepare reports and assist the Plant Engineer in special projects Show less

    • Romania
    • Machinery Manufacturing
    • 1 - 100 Employee
    • Inginer principal
      • Sep 1986 - Jan 2007

      * management of FORMTEC Germany automatic molding and casting line designing *management and surveillance of Germany import related installation and commissioning *casting job in partnership with German party * surveillance and management , steel cast parts production , repair , operation and maintenance of Formtec molding and casting line , induction melting furnace and related units , all mechanical , electric , hydraulic , pneumatic and software jobs connection with the above , Simatic S5 Siemens computing system. * the maintenance and repairs of the utilities equipments (water equipments , electrical equipments , gas equipments , industrial air equipments ) *the maintenance and repairs of the industrial covered market and administrative buildings . *the maintenance and repairs of many type of wood processing machines; *the maintenance and repairs of electrical cranes ; *second Production Supervizor Show less

Education

  • Universitatea „Politehnica” din București
    Engineer’s Degree, engineering
    1981 - 1986

Community

You need to have a working account to view this content. Click here to join now