Intazar Ahmad, PMP, CCDA, ACIArb

Planning Engineer at CEG International
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Doha, Qatar, QA
Languages
  • Urdu -
  • English -
  • Punjabi -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Certified Construction Delay Analyst
    Society of Construction Claims Specialists International
    Mar, 2022
    - Nov, 2024
  • Associate of the Charted Institute of Arbitrators
    Chartered Institute of Arbitrators
    May, 2020
    - Nov, 2024
  • Certificate in Claims Preparation & Dispute Management
    College of Contract Management United Kingdom
    Jan, 2020
    - Nov, 2024
  • Project Management Professional (PMP)
    Project Management Institute
    Nov, 2020
    - Nov, 2024

Experience

    • Qatar
    • Architecture and Planning
    • 300 - 400 Employee
    • Planning Engineer
      • Mar 2022 - Present

    • Qatar
    • Government Administration
    • 700 & Above Employee
    • Planning Engineer
      • Jun 2021 - Mar 2022

      Worked in Road Projects Department (RDP)-Northern Area-Ashghal under Secondment Contract from EGIS International. Following are the Duties & Responsibilities in Ashghal: • Review the Extension of Time (EoT) Claims. • Review the Prolongation Cost Claims. • Review the Baseline/Revised Baseline Program of Works. • Preparation and Updating the Master Schedule of RPD Northern Area. • Preparation of the RPD’s Bi-Weekly and Monthly Progress Reports. • Review the GECs’ Monthly Progress Reports. • Preparation of the DoPA Presentations. • Provision of Data and collaboration for the Gateway and Delay Explanation Meetings. • Preparation of the quarterly Plots’ Delivery Data. • Preparation of other reports required by the RPD Management and RPD Project Engineers. • Attend regular Bi-Weekly/Monthly Progress review Meetings with RDP Site Team. • Synchronize with other Departments (RPD’s Commercial, Handing Over, Stakeholders & HSE Team) for efficient follow-up of the Plan and to accomplish significant Milestones. • Interface with GECs & Contractors for issues related to planning and scheduling activities. • Preparation of contractual replies with issues relating with Time & Progress. Show less

    • Construction
    • 500 - 600 Employee
    • Planning Engineer
      • May 2019 - Jun 2021

      Project:"Roads and Infrastructure in Doha Industrial Area, Package-04, Doha, Qatar"Project Information: This Project covers a network of Urban Roadways extending for 26 km approximately, consisting of Collector, Arterial and Local Roads. The Works include, but are not limited to: Earthworks, Pavement Construction, Surfacing Works, Kerbing Works, Traffic Signs, Road Markings, Traffic Signals, Surface Water Drainage Work, Micro Tunneling, Potable Water Work, Street Lighting and Telecommunication Work.The total Estimated Cost of this Package is QAR 462 Million.Responsibilities:• Preparation of Baseline/Revised/Recovery Schedules by using Primavera P6.• Preparation of Construction Work Schedules.• Preparation of Fragnet Schedules, Data required and submission of EOT Claims in Collaboration with Planning Manager.• Fast Tracking/Crashing of Project where necessary & participate actively for resolution of Technical Issues.• Development of Mitigation Planning & Strategy to bring Project's Progress on track.• Set Work Program and Target Milestones for different Project Phases based on the Project Plan.• Preparation of Monitoring Sheets and Progress Drawings.• Updating of Work Schedule on Weekly and Monthly Basis.• Prepares Daily, Weekly & Monthly Progress Reports.• Carrying out regular site inspections to assess work progress based on approved schedule; planned versus actual progress. • Preparation of Reports related to Procurement and Materials.• To Give Weekly Targets to Site Managers & Site Engineers and meet them at the end of each week to monitor previous week Progress and fix the Target for the next week.• Preparation of Presentations for Meetings with Consultant/Client/Management.• Attend regular Progress review Meetings with Consultant.• Preparation of look-ahead schedules.• Preparation of contractual replies with issues relating with Time. Show less

    • Planning Engineer
      • Mar 2017 - Apr 2019

      Project Information: "Construction of Khalifa Street and TV Roundabout Upgrade" This Project comprised of around 7 Km dual 4-lane Carriageway Road and Service Roads as part of Widening and Improvement. This Project’ Works included but not limited to: Earthwork, Pavement Construction, Surfacing, Surface Water Drainage Work, TSE Work, ITS Work, Utility Works including protection and Road Crossing Ducts, Street Lighting, Traffic Signals and Landscaping Works. The Cost of this Project was 135 Million QAR.Responsibilities:• Preparation of Baseline/Revised/Recovery Schedules by using Primavera P6.• Preparation of Construction Work Schedules.• Preparation of Fragnet Schedules, Data required and submission of EOT Claims in Collaboration with Planning Manager.• Fast Tracking/Crashing of Project where necessary & participate actively for resolution of Technical Issues.• Development of Mitigation Planning & Strategy to bring Project's Progress on track.• Set Work Program and Target Milestones for different Project Phases based on the Project Plan.• Preparation of Monitoring Sheets and Progress Drawings.• Updating of Work Schedule on Weekly and Monthly Basis.• Prepares Daily, Weekly & Monthly Progress Reports.• Carrying out regular site inspections to assess work progress based on approved schedule; planned versus actual progress. • Preparation of Reports related to Procurement and Materials.• To Give Weekly Targets to Site Managers & Site Engineers and meet them at the end of each week to monitor previous week Progress and fix the Target for the next week.• Preparation of Presentations for Meetings with Consultant/Client/Management.• Attend regular Progress review Meetings with Consultant.• Preparation of look-ahead schedules.• Preparation of contractual replies with issues relating with Time. Show less

    • Planning Engineer
      • Oct 2015 - Mar 2017

      Project Information:"Construction and Upgrade of Rayyan Road Project7: Contract1, Al Rayyan, Qatar" This Project comprised of the Improvement Scheme 2.5 Km plus 1 Km Side Roads, associated Service Roads (approximately 5 Km), At Grade Junction (R2) and Two Level Junctions (R3 and R4), Utility Galleries (3 Nos.) and Electrical Substations (6 Nos.). Types of Works includes: Road Works, Kerbs & Footways, Street Lighting, Traffic Signals, ITS, QAF, QNBN, Oordeoo, MOI-SSD, QGEWC-Water & Electricity, Storm Water Drainage, Micro Tunneling, Waste Water, TSE and Landscaping. The total estimated cost of this Package was QAR 1,019 Million.Responsibilities:• Preparation of Baseline/Revised/Recovery Schedules by using Primavera P6.• Preparation of Construction Work Schedules.• Preparation of Fragnet Schedules, Data required and submission of EOT Claims in Collaboration with Planning Manager.• Fast Tracking/Crashing of Project where necessary & participate actively for resolution of Technical Issues.• Development of Mitigation Planning & Strategy to bring Project's Progress on track.• Set Work Program and Target Milestones for different Project Phases based on the Project Plan.• Preparation of Monitoring Sheets and Progress Drawings.• Updating of Work Schedule on Weekly and Monthly Basis.• Prepares Daily, Weekly & Monthly Progress Reports.• Carrying out regular site inspections to assess work progress based on approved schedule; planned versus actual progress. • Preparation of Reports related to Procurement and Materials.• To Give Weekly Targets to Site Managers & Site Engineers and meet them at the end of each week to monitor previous week Progress.• Preparation of Presentations for Meetings with Consultant.• Preparation of look-ahead schedules.• Preparation of contractual replies with issues relating with Time. Show less

    • Türkiye
    • Construction
    • 400 - 500 Employee
    • Planning & Contracts Engineer
      • Oct 2013 - Sep 2015

      Project Information: "Erbil Water Supply Improvement System & Duhok Distribution Network (Package-1)" This Project was comprised of Clariflocculators (4 Numbers), Filtration Building, Alum Building, Sludge Pit, Rapid Mixing Tanks, Service Pump Stations (2 Nos.), Reservoir (Capacity 50,000 cubic meter), Steel Truss Bridges (3 Numbers), Network Chambers (1050 Nos.), Piping Network (Approximate Length 600 Km) & Electro Mechanical Works.. The total estimated cost of this Package was USD 162 Million. Responsibilities: • Preparation of Revised/Recovery/Construction Schedules by using Primavera P6. • Set Work Program and Target Milestones for each Building and Network Area based on the Project Plan. • Preparation of Fragnet Schedules, Data required and submission of EOT and other Claims in Collaboration with Technical Manager. • Updating of Work Schedule on Weekly and Monthly Basis by using Monitoring Sheets and Progress Drawings. • Prepares Daily, Weekly & Monthly Progress Reports. • Conduct weekly visit to site to observe, discuss and check the factors hindering progress to take corrective actions on time. • To Give Weekly Targets to Site Managers & Site Engineers and meet them at the end of each week to monitor previous week Progress and fix the Target for the next week. • Monitoring the equipment allocation and resource utilization. • Preparation of Presentations for Meetings with Consultant/Steering Committee. • Participate in Project Meetings and Discussions with the Consultant as required, along with the Technical Manager. • Synchronize with other Departments (Execution, Procurement and Design) for efficient follow-up of the Plan and to accomplish significant Milestones. Show less

    • Civil Engineering
    • 1 - 100 Employee
    • Planning Engineer
      • Mar 2013 - Oct 2013

      Project Information: Project 1-Construction of Vehicular Underpass at Kalma Chowk, Lahore, Pakistan This Project comprised of Earthwork, Sub Base & Base Course, Surfacing, Structure Works for Retaining Walls, Ramps & Slabs, Sump Pump House, Drainage & Erosion Works, Ancillary Works and Electrical Works. Road Works. The Cost of this Project was 948 Million PKR. Project 2: Construction Work of Slow Speed Weigh in Motion System (Permanent Type) on Lahore Ring Road, Lahore, Pakistan This Project comprised of Earthwork, Sub Base & Base Course, Surfacing, Building Structures, Drainage & Erosion Works, Ancillary Works, Electrical & External Illumination Works and Mechanical Works. The Cost of this Project was 135 Million PKR. Responsibilities: • Preparation of the Logic Schedules on Primavera for the Bidding Projects as per requirements of the Client stated in the Bidding Documents. • Preparation of Baseline/Revised/Recovery/Construction Schedules by using Primavera P6. • Set Work Program and Target Milestones for each Phase based on the Project Plan. • Updating of Work Schedule on Weekly and Monthly Basis by using Monitoring Sheets and Progress Drawings. • Prepares Daily, Weekly & Monthly Progress Reports. • Conduct weekly visit to site to observe, discuss and check the factors hindering progress to take corrective actions on time. • Preparation of look-ahead schedules in collaboration with Construction Manager. • Monitoring the equipment allocation and resource utilization. • Preparation of Presentations for Meetings with Consultant. • Participate in Project Meetings and Discussions with the Consultant as required, along with the Manager Planning & Proposals. • Updating higher Management with the current status of the Projects. • To Assist the Contract Engineer for preparation of some Pre-qualifications and Tender Documents. Show less

    • Planning Engineer
      • Dec 2011 - Feb 2013

      Project Information: "Construction of Motorway (M-4 Extension) From Khanewal to Multan" Motorway M – 4 Extension from Khanewal to Multan (Approximately 57 KM in length) is a part of Motorway from Faisalabad to Multan. This Project included 4 Lane Carriageway, 18 Bridges of different spans (included Flyovers & Interchanges), 31 Subways, 16 Underpasses, 12 Box Culverts & 250 Pipe Culverts. The total cost of this section was 12, 937 Million PKR. Responsibilities: • Preparation of the Logic Schedules on Primavera for the Bidding Projects as per requirements of the Client stated in the Bidding Documents. • Preparation of Baseline/Revised/Recovery Schedules by using Primavera P6. • Develop alternative construction programs if site conditions or other circumstances require corrective steps to accomplish the final construction completion date. • Set Work Program and Target Milestones for each Phase based on the Project Plan. • Identify and review regularly, critical and sub-critical activities and monitor its impact on project schedules. • Identify areas of weakness and establishes means and methods for recovery, if any, as well as new critical activities. • Updating of Work Schedule on Weekly and Monthly Basis by using Monitoring Sheets and Progress Drawings. • Prepares Daily, Weekly & Monthly Progress Reports. • Conduct weekly visit to site to observe, discuss and check the factors hindering progress to take corrective actions on time, Forecasts completion dates and final performance & Earned value analysis. • Prepare and update look-ahead schedules which reflect the priority activities. • Monitoring the equipment allocation and resource utilization. • Coordinate between different Departments to maintain Time Schedules. • Preparation of Shop Drawings & Bar Bending Schedule for Drainage Work. • Co-ordination with Project Manager for Monthly Progress review Meetings. Show less

  • Khalid Rauf & Co. (Pvt.) Ltd
    • Multan-Punjab-Pakistan
    • Planning Engineer
      • Apr 2011 - Nov 2011

      Project Information: "Widening/Improvement of Bosan Road Package- 1A, From KM 0+000 to KM 3+450, Multan" The Project comprised of the Widening and Improvement of Existing Road, Service Roads, Drainage Works, Street Lighting Work, Electrical Works and Hard Landscaping Work. The project cost was 460 Million PKR. Responsibilities: • Preparation of the Logic Schedules on Primavera for the Bidding Projects as per requirements of the Client stated in the Bidding Documents. • Preparation of Baseline/Revised/Recovery Schedules by using Primavera P6. • Develop alternative construction programs if site conditions or other circumstances require corrective steps to accomplish the final construction completion date. • Set Work Program and Target Milestones for each Phase based on the Project Plan. • Identify and review regularly, critical and sub-critical activities and monitor its impact on project schedules. • Identify areas of weakness and establishes means and methods for recovery, if any, as well as new critical activities. • Updating of Work Schedule on Weekly and Monthly Basis by using Monitoring Sheets and Progress Drawings. • Prepares Daily, Weekly & Monthly Progress Reports. • Conduct weekly visit to site to observe, discuss and check the factors hindering progress to take corrective actions on time, Forecasts completion dates and final performance & Earned value analysis. • Prepare and update look-ahead schedules which reflect the priority activities. • Monitoring the equipment allocation and resource utilization. • Coordinate between different Departments to maintain Time Schedules. • Preparation of Shop Drawings & Bar Bending Schedule for Drainage Work. • Co-ordination with Project Manager for Monthly Progress review Meetings. Show less

  • J & K Builders (Pvt.) Ltd.
    • Lahore-Punjab-Pakistan
    • Planning Engineer
      • Aug 2010 - Mar 2011

      Project Information: "Construction of Abdullah Gull Interchange at Airport Access Road (LRRP- Pack.7), Lahore" A part of the project was awarded to M/S J & K Builders as Subcontract from M/S NLC Engineers. The Scope of Work included Underpass (1Nos.), Sump pump House, Utility Culverts, Drainage Works, Ancillary Works and Road Works up to WBM. The project cost was 134 Million PKR. Responsibilities: • Preparation of Baseline/Revised/Recovery/Construction Schedules by using Primavera P6. • Set Work Program and Target Milestones for each Phase based on the Project Plan. • Monitor critical activities based on the project schedule and advise site management. • Identify areas of weakness and establishes means and methods for recovery, if any, as well as new critical activities. • Record and maintain update of Site Work Progress by using Monitoring Sheets and Progress Drawings. • Updating of Work Schedule on Weekly and Monthly Basis. • Prepares Daily, Weekly & Monthly Progress Reports. • Prepare and update three weeks and three months look-ahead schedule that reflect the priority activities. • Coordinate between different Departments to maintain Time Schedules. • Attend meetings with Clients, Consultants along with Project Manager. Show less

Education

  • University of Engineering and Technology, Lahore
    Bachelor's Degree, Transportation Engineering
    2006 - 2010
  • Government College University (GCU), Lahore
    FSc Pre Engineering
    2004 - 2006
  • G.H.S.School Mor Khunda
    Matriculation
    2002 - 2004

Community

You need to have a working account to view this content. Click here to join now