Inra Osman
RF Engineer at PT.GCI Indonesia (JIESAI)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
Topline Score
Bio
Experience
-
PT.GCI Indonesia (JIESAI)
-
Telecommunications
-
300 - 400 Employee
-
RF Engineer
-
Oct 2014 - Present
-
-
-
PT Metro Global Services
-
Indonesia
-
Telecommunications
-
200 - 300 Employee
-
RF engineer
-
Jul 2011 - Aug 2014
•Provide Report ConditionalAcceptance,Provisional Acceptance Certificate, 3G New Site Verification.•Worst cell Monitoring and optimization.•Add route to achieve drive test route requirement for achieve KPI target•Provide report for site change antenna and plot for reorientation or optim physical.•Drive Test Optimization.•KPI Improvement (Accessibility, Retainability, Integrity and Trafficability).
-
-
DT engineer
-
Jul 2010 - Jun 2011
•Pre define and pre validation route for drive test•Perform drive test measurement by Tems 9.13 and Nemo •FTP Test (R99,HSDPA) .•Processing and reporting of data according the drive test result•Drive Test IRAT•Plotting RSCP, EcNo and Quality information for overall picture of the driven area•Reporting urgent problems of the network for immediate action•Identify the problems and solutions found during the testing•Conduct Site Audit and Tilting•Handle Complaint Drive Test in all around Area•Test call and analyze cell with high congestion and utilization and give recommendation Show less
-
-
-
PT. Lintas Media Telekomunikasi
-
Indonesia
-
Telecommunications
-
200 - 300 Employee
-
DT engineer
-
Oct 2009 - May 2010
•Pre define and pre validation route for drive test •Perform drive test measurement by TEMS 9.13 and GENEX Probe •3G Drive test Tunning and Cluster for checking Quality of NetworkTelkomsel ,JABOTABEK. •FTP Test (R99,HSDPA) . •Processing and reporting of data according the drive test result •Drive Test IRAT •Plotting RSCP, EcNo and Quality information for overall picture of the driven area •Statistic Report ( CSSR,CDR,HOR ) •Reporting urgent problems of the network for immediate action •Identify the problems and solutions found during the testing •Conduct Site Audit and Tilting Show less
-
-