Indunil Prasanna Bandara Warnasooriya

Deputy Engineering Manager (Mechanical and Maintenance) at Ceylon Petroleum Storage Terminals LTD
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Colombo, Western Province, Sri Lanka, LK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Sri Lanka
    • Oil and Gas
    • 100 - 200 Employee
    • Deputy Engineering Manager (Mechanical and Maintenance)
      • Jan 2017 - Present

      • Responsible for Overall Mechanical Maintenance in the plant.• Planning, organizing, Staffing, Directing and Controlling Mechanical aspects to deliver efficient and effective service from Muthurajawela Petroleum Terminal by reducing downtime, performing continuous improvements and performing maintenance on time.• Planning and Scheduling Preventive Maintenance (TBM & CBM) and Corrective maintenance in Petroleum Storage tanks, Pumps, Pipelines, Fire Fighting Pumps and accessories, Equipment and Engines, Generators, Effluent Treatment plants, Sewage Treatment plants etc.• Align Maintenance activities with OEM recommendations, reliability data, HSE Guidance and accepted practices.• Contract Administration and Project Management• Innovations and Improvements for cost reduction, improve efficiency and effectiveness and achieving organizational goals.• Conducting Inspection of tanks and pipelines for possible leaks, corrosions and failures.• Managing risks, risk assessment and guiding subordinates adhering to health and safety policies and procedures.• Liaising with Stake Holders, Suppliers, Authorities etc.

    • Mechanical Engineer
      • Jan 2008 - Dec 2016

      • Responsible for Overall Maintenance in the plant.• Perform Mechanical Engineering Maintenances, improvements, new constructions, installation and designs to deliver uninterrupted service from Muthurajawela Petroleum Terminal.• Preventive and Corrective Maintenance of Petroleum Storage tanks, Pumps, Pipelines, Fire Fighting Pumps and accessories, Equipment and Engines, Generators, Effluent Treatment plants, Sewage Treatment plants etc.• Design development and Implementation for New Constructions, Repairs and Modifications in• Aboveground Petroleum Storage Tanks as per API 650 and API 653 Standards• Pipelines and selection of pumps and equipment as per flow requirements and relevant standards• Fire Detection and Fire Fighting system as per NFPA recommendations• Drinking Water, Industrial Water and Sewerage Treatment System• Diagnosing and Route cause analysis of equipment failures.• Corrosion Prevention and Control in steel structures, pipelines and Tanks.• Conducting Inspection of tanks and pipelines for possible leaks, corrosions and failures.• Formulating Technical specifications, Budgeting and Evaluating procurement of equipment, Spare parts and Tools.• Technical Documentation and Reporting• Bid Evaluation• Complying with International Standers and Recommended Practices relevant the Petroleum Industry (API, ASME, NFPA, NACE, ANSI, ISO etc.)• Identification of Equipment, Tools, Spare Parts and Material Requirements, and evaluation of procurement.• Ensure compliance with Environment protection requirements.• Training staff on equipment operating and maintenance procedures• Supervising engineering and technical staff• Liaising with Stake Holders, Suppliers, Authorities etc.

    • Engineer (Document Control)
      • Jul 2009 - Jun 2010

      An EPC project worth US$ 20 Million to rerouting of submarine Crude Oil Pipeline consisting of installation new 36” pipeline of (approx. 6Km) laid in trench with one shore connection and one offshore connection to the existing pipeline.• Maintain Document Registers• Maintain control of documents and records.• Project scheduling, budgeting and handling project logistics.• Review and confirm the accuracy and compliance of the documents and records.• Obtain clearances and approvals necessary for project implementation.• Prepare, review Minutes of meetings and follow up meeting decisions.• Liaise with project stakeholders and improve project coherence.• Maintain confidentiality around sensitive documentation• Preparation, sending and follow-up Document transmittals

    • Project Engineer
      • Jan 2008 - Dec 2009

      An EPC project worth US$ 64 Million to lay 6.4 km length of 18 inch offshore Pipeline on the sea bed including about 1 km Horizontal Directional Drilling portion and tank farm modification to import and store Fuel oil and petrol.• Responsible to the Project Director for the on-schedule, and within-budget completion of the assigned engineering, procurement and construction (EPC) project operations within the restrictions, specific assignments or delegations, and specific exclusions provided by the terms and conditions established in the project contract documents.• Detail Engineering, Procurement and Construction Operations; under the direction and guidance of the Project Director.• Review specifications, datasheets, Material Requisitions, verification of FEED design & calculations.• Provide design and engineering input and recommendations considering capital costs, safety, environmental, operability, maintainability, and reliability.• Coordinate with user functions to identify project needs, develop project scoping documents, and support project execution.• Conducting Progress Meetings and, participating in kick-off meetings with critical vendors.• Participate in and coordinate specialist participation for equipment inspections, Factory and site acceptance tests (FAT & SAT).• Liaising with contractors, subcontractors, Consultants, stakeholders, Authorities 3tc.• Manage, coordinate, and consolidate responses to queries, clarifications, and document reviews from stakeholders.• Ensure timely, high-quality contractor, subcontractor, and vendor deliverables are produced.

    • Metallurgist
      • Jan 2006 - Dec 2007

      • Controlling process parameters in Hot Rolling mill to manufacture Reinforcement Steel bars by hot rolling steel billets.• Controlling process parameters Cold Drawing of steel wires, steel wire mesh making and welding electrode making.• Controlling process parameters in mould making and ferrous alloy casting process in Foundry.• Mechanical Testing, Chemical Analysis, Microstructure Examination, Evaluation of Test Results and Issuing Test Reports for Ferrous Alloys.• Heat Treatment of Ferrous Alloys (Quenching, Tempering, Annealing, Normalizing and Carburizing)• Failure analysis.• Quality control and Quality Assurance in products and production process.

Education

  • University of Moratuwa
    Bachelor of Science of Engineering Honours, Engineering
    2001 - 2005
  • Wayamba University of Sri Lanka
    Postgraduate Diploma in Business Management, Business Administration, Management and Operations
    2007 - 2009
  • Maliyadeva College
    1986 - 2000
  • Wayamba University of Sri Lanka
    Post Graduate Diploma in Business Management, Business, Management, Marketing, and Related Support Services
    2006 - 2007
  • Wayamba University of Sri Lanka
    Postgraduate Diploma in Business Management, Business Administration, Management and Operations
    2006 - 2007
  • Wayamba University of Sri Lanka
    Postgraduate Diploma in Business Management, Business Administration, Management and Operations
    2006 - 2007

Community

You need to have a working account to view this content. Click here to join now