Nurul Inani Hazira
System Assurance, Configuration & Requirement at Shanghai Tunnel Engineering Co., Ltd.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Bahasa Malaysia Full professional proficiency
-
English Full professional proficiency
Topline Score
Bio
Credentials
-
Graduate Engineer
Board of Engineers MalaysiaJul, 2014- Nov, 2024 -
Basic Non Destructive Testing Methods Demostration (PT/MT/UT/RT)
Universiti Tenaga NasionalNov, 2012- Nov, 2024 -
UG Construction Skills Certification Scheme
MMC GAMUDA KVMRT (T) SDN BHDAug, 2017- Nov, 2024 -
Batching Plant Operation
UGood Enterprise -
Chiller and Cooling Tower Operation
Shinryo Corporation -
Compressed Air Plant Operation
KAESER KOMPRESSOREN -
Crane & Hoist Operation
Excellift -
Crane & Plant Inspection (CIDB/ISO)
CIDB Malaysia
Experience
-
Shanghai Tunnel Engineering Co., Ltd.
-
China
-
Civil Engineering
-
300 - 400 Employee
-
System Assurance, Configuration & Requirement
-
Jan 2021 - Present
LRT3 UG- System Safety, RAM, Requirement, Configuration, Verification and Validation (V&V)
-
-
Engineer, M&E & Interface
-
Nov 2019 - Jan 2021
LRT3 UG- M&E Design and Build (FPS, CWS, DWS, TVS, ELEC, ECS & ACMV) - Interfacing with COMMS, TWK, EAC, LRV, PS&DS & S&TCS
-
-
-
China Communications Construction Co., Ltd.
-
United States
-
Civil Engineering
-
700 & Above Employee
-
M&E Engineer
-
Jul 2017 - Oct 2019
Project: ● PACKAGE B (TUNNEL): TITIWANGSA UNDERGROUND STATION TO HKL CROSSOVER - Involve in Project management, Design & Engineering, Procurement, Construction, Field operation as well as in testing & commissioning. - Monitoring and maintaining plant equipment and machinery, resolve all issues and provide support to all engineering activities and participate in all technical meetings. - Plan preventive maintenance, predictive maintenance and perform troubleshooting on systems, equipment, and components to maximize equipment reliability. - Inspect crane, plant and machineries to ensure they are well maintained and safe to use.
-
-
-
UGL
-
Australia
-
Engineering Services
-
700 & Above Employee
-
Project Engineer
-
Jun 2015 - Jun 2017
Project: ● PACKAGE 3 (M&E WORKS): MERDEKA STATION, PUDU SHAFT, LINKWAY AND ASSOCIATED TUNNELS ● PACKAGE 4 (M&E WORKS): BUKIT BINTANG STATION & SUBWAY INCLUSIVE INTERVENTION SHAFT 2, ADITS AND TUNNELS ● PACKAGE 8 (M&E WORKS): CONSTRUCTION, COMPLETION, TESTING, COMMISSIONING, CARE AND MAINTENANCE OF THE WORKS AT MALURI SOUTH PORTAL - Generate specific procedures and method statements (Eg: Work Method Statements, Inspection Test Plans & Job Safety & Environment Analysis). - Review and interpret the construction, architectural and CSD drawings and other specifications to ensure compliance as well as recognizing errors and providing corrective recommendations. - Coordinate with subcontractors and suppliers in their submission of shop drawings; supply, design, installation, testing and commissioning of the M&E Equipment to ensure compliance with specific requirements.
-
-
-
MMC-Gamuda
-
Malaysia
-
Construction
-
700 & Above Employee
-
M&E Engineer
-
May 2014 - Oct 2014
Project: ● PACKAGE S8 (ELEVATED STATION): CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT SAUJANA IMPIAN, BANDAR KAJANG AND KAJANG. - Responsible to monitor and track project progress and ensure all deliverables (Shop Drawing, Method of Statement and Material) are met in timely manner and quality standards. - Organize M&E works consists of Electrical System, Cold Water & Sanitary Plumbing (CWS), Environmental Control System (ECS), Fire Detection & Protection System (FDPS), Lift, Transformer, LED, Escalator and Uninterruptible Power Supply (UPS). - Ensure close liaison with authorities, consultants, work-package contractor & sub-contractors to ensure smooth implementation and on time delivery of the project.
-
-
-
Putrajaya Power Station, Tenaga Nasional Berhad (Generation Division)
-
Putrajaya, Malaysia
-
Trainee Engineer (M&E)
-
Feb 2012 - May 2012
- Supervise all the corrective, preventative or predictive maintenance of Gas Turbine Power Plant to ensure the correct functioning of all productive processes of the facility and decrease mechanical downtime. - Perform machinery condition monitoring and diagnostics using infrared thermography. - Oversee minor overhaul of Gas Turbine 2 - Frame 9E (PG 9171) John Brown - 110MW. The inspection/testing on the components in Accessory Compartment, Turbine Compartment, Cooling Water System, Gas Reducing System and Jacking Oil Pump. - Attend meetings to resolve the technical issues and report on project progress.
-
-
Education
-
Universiti Tenaga Nasional
Bachelor of Mechanical Engineering (Hons.), Mechanical Engineering