Inamullah Khan

Construction Project Manager at Modern Chemicals and Services Company
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Riyadh, Saudi Arabia, SA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Saudi Arabia
    • Chemical Manufacturing
    • 1 - 100 Employee
    • Construction Project Manager
      • Jul 2023 - Present

    • Pakistan
    • Civil Engineering
    • 1 - 100 Employee
    • Construction Manager
      • Jan 2022 - Jun 2023

      Construction Execution and Management of the overall site construction activities. Managing team of 26 members including site engineers, site supervisors, material engineers, cad operators & surveyors to deliver the timely execution of works as per given designs, plans and specifications. Liaising with CSC team for timely recovery of approvals on method statements and drawings/design issues. Project Scope includes Roads (rigid and flexible), Storm water conduit, flyover, culverts, manholes etc. All sorts of reporting including DPR, MMR, MPR is also being taken care of. Show less

  • M Ramzan & Co
    • Dera Ismail Khan District, Khyber Pakhtunkhwa, Pakistan
    • Project Engineer
      • Feb 2019 - Jan 2021

      Managed team of engineers, surveyors to support the timely execution of works as per given designs and specifications. Managed all works including excavation, preparation of bed, laying of underground sewerage pipes, linkages, manhole, top filling and compaction and construction of Rigid and Asphalt roads over. Managed team of engineers, surveyors to support the timely execution of works as per given designs and specifications. Managed all works including excavation, preparation of bed, laying of underground sewerage pipes, linkages, manhole, top filling and compaction and construction of Rigid and Asphalt roads over.

  • Morden Chemicals And Services(Saudi Arabia)
    • Ţurayf, Northern Frontier, Saudi Arabia
    • QA/QC Engineer
      • Apr 2016 - Feb 2019

      I was overall responsible for quality assurance and quality control of Infrastructure development during the construction of Ammonium Nitrate Large Storage Buildings. Responsibility included ● Prepared ITP and Method statements. ● Conducted surveillance inspections, hold point release inspections and witness other inspections ● Inspection of site works as per the ITP and screening checklists. ● Reviewed specifications, drawings, inspections, test reports, delivery schedule, operation manual and technical data sheets. ● Inspection of onsite construction machinery before commencing the execution work. ● Ensuring that Contractor’s equipment, material and installation are in conformance with drawings and specifications. ● Issuance of non-conformance reports for non-compliance or defective items as n when required. ● Reviewed sub-contractor’s proposed design and shop drawings. ● Reviewed sub-Contractor's technical submittals, technical queries. ● Checked and Reviewed Contractor’s interim payment certificates for the work executed during the period. ● Scrutinizing as built drawings and keeping & uploading record on ACONEX & excel database. Show less

  • Gomalways International Pvt Ltd.
    • Rawalpindi, Punjab, Pakistan
    • Quality Engineer
      • Jan 2004 - Dec 2015

      During this largest chunk of my professional life, I have performed various roles of a civil engineer. Mainly carried out the following tasks. ● Prepared the method statement for all the works executed in the project. (Mainly office n residential buildings construction) ● Prepared inspections test plans for the project. ● Prepared check lists for each type of work under execution ● Supervised test for soil gradations, concrete compressive strength n other soil bearing capacity etc. ● Manipulation of construction plans for the project and assignment, monitoring of daily tasks assigned to manpower, materials, consumables, equipment, tools. ● Monitoring quality control and health and safety matters on site. ● Preparing reports as required. ● Resolving any unexpected technical difficulties and other problems that may arise. Show less

  • Dell Pvt. Ltd
    • Dera Ismāīl Khān, Khyber Pakhtunkhwa, Pakistan
    • Site Engineer
      • Feb 2001 - Dec 2003

      Duties: ● Construction Supervision of Canal Excavation, Formation of their Embankments, lining of Canals, spurs and super passages as per Design / Drawings & Specifications of Main Canal, Left & Right Distributaries off taking from the Main Canal & their allied Structures including Distributor Structure at the Main Canal. ● Checking Quality of different Construction Materials as per Specifications. ● Checking Bar Bending Schedules of different structures under construction as per Design. ● Preparation of Weekly, Monthly and Quarterly Progress Reports. ● Joint Checking & verification of Contractor’s Machinery & Manpower deployed at Site on Weekly & Monthly basis. ● Also carried out detailed estimation of quantities and billing for my company. Show less

    • Pakistan
    • Architecture and Planning
    • 1 - 100 Employee
    • Office Engineer
      • Sep 1999 - Feb 2001

      Duties: ● Initially I was one of the members of team, which carried out detailed surveys of new as well as for existing school buildings, which had to be rehabilitated. The surveys were carried out in the entire Peshawar district. ● Then I prepared Detailed Cost Estimates with the help of computers for existing as well as new school buildings. Also played a role in preparation of contract documents and then checking bid documents and thus performing bid evaluation. ● Developed smaller MS Excel Spreadsheet programs to ease out the process of Estimation. ● Also worked as site engineer and gave layouts of various school buildings. ● At last I have been given the duty to carry out billing process and prepared more than 700 bills of quantities (running as well as final) for nearly 280 schools in Haripur District. ● I was the leader of Technical Section Team at Haripur District for ECIL. Show less

  • Design Consultants
    • Peshawar, Khyber Pakhtunkhwa, Pakistan
    • Civil Engineer
      • Feb 1999 - Sep 1999

      Main Responsibilities: ● Assisted in preparing architectural design of residential buildings. ● Also assisted in preparing the structural design of residential building. ● Execution of Layout of multi storey residential building. ● Mentoring n execution of excavation of foundations. ● Inspection of Formwork. ● Verification of Bar bending schedule ● Monitoring of steel fixing. ● Monitoring of construction of concrete of boundary wall. ● Slump test of concrete. Main Responsibilities: ● Assisted in preparing architectural design of residential buildings. ● Also assisted in preparing the structural design of residential building. ● Execution of Layout of multi storey residential building. ● Mentoring n execution of excavation of foundations. ● Inspection of Formwork. ● Verification of Bar bending schedule ● Monitoring of steel fixing. ● Monitoring of construction of concrete of boundary wall. ● Slump test of concrete.

  • MAK Engineering International
    • Dera Ismāīl Khān, Khyber Pakhtunkhwa, Pakistan
    • Junior Engineer
      • Feb 1998 - Feb 1999

      Duties: ● Initially worked as Junior Engineer Site for campsite-1 for Tekser Inc. ● Worked on supervision of Canal Lining, embankments, super passage, spurs. ● Later on, went to Dewatering project of Chashma Nuclear Power Project and worked as Site Engineer for construction of some Office Building Structures. Duties: ● Initially worked as Junior Engineer Site for campsite-1 for Tekser Inc. ● Worked on supervision of Canal Lining, embankments, super passage, spurs. ● Later on, went to Dewatering project of Chashma Nuclear Power Project and worked as Site Engineer for construction of some Office Building Structures.

Education

  • University of Engineering & Technology Peshawar
    Bachelor of Science - BS, Civil Engineering
    1993 - 1997

Community

You need to have a working account to view this content. Click here to join now