Amjad Abdelrahim

hi mr imtiaz

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Internal Auditor IMS
    Tatweer Safety Consultancy
    Feb, 2016
    - Oct, 2024
  • ACI Certified in Concrete technology
    ACI Corporation
    Feb, 2012
    - Oct, 2024
  • DAE
    Technical College KPK Pakistan

Experience

    • France
    • Civil Engineering
    • 200 - 300 Employee
    • Senior Civil Inspector
      • Apr 2015 - Present

      Inspecting Rebars & Form-work system of different Structural elements of the Tunnel Line-5 Station bottom Slabs, Lateral Walls,Columns,Top Slabs,Concourse slabs, Mezzanine slabs, Platforms & Precast Segments etc Conforming their installation as per design drawing, as well as Tunneling Boring Machine operations. Supervision Concrete pouring of the inspected elements as per project specification & required standard . Inspecting Rebars & Form-work system of different Structural elements of the Tunnel Line-5 Station bottom Slabs, Lateral Walls,Columns,Top Slabs,Concourse slabs, Mezzanine slabs, Platforms & Precast Segments etc Conforming their installation as per design drawing, as well as Tunneling Boring Machine operations. Supervision Concrete pouring of the inspected elements as per project specification & required standard .

    • United States
    • Real Estate
    • 1 - 100 Employee
    • Infra-structural Inspector
      • Feb 2014 - Apr 2015

      Carried out inspections of Collector Roads & Local Roads, to ensuring all activities have been properly performed in accordance with approved design drawings, based on applicable standard codes ACI, AASHTO, and ASTM. Perform routine inspections of infra-structural works including Storm water, Sewer system network, and Electrical cable & Fiber optic cable installation for assigned package as per MOH standard. Attend WIR calls to witness and verify technical inspections and materials testing as required by ITP’s and AFC Drawings. Regularly attend QA/QC Weekly Meeting with contractor and contribute to resolution of quality issues. Coordinate with Construction/HSE departments in order to ensure work is being performed in a safe manner and within stipulated time by promoting pro-active approach. Prepare daily, weekly and monthly progress reports. Ensure daily Contractor’s QA/QC monitoring to enhance quality assurance by the contractors.

    • India
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Civil Site Inspector
      • Aug 2010 - Feb 2014

      Responsible for the supervision of site activities civil and structural components for road/railways bridges, culverts, retaining walls, bored piles, excavation, footings, columns, superstructures (solid slabs, voided slabs, box girder) post tensioning systems (freyssinet & Dawidag system international) including installation of ducting, stressing, grouting, deck slab, Parapets wall, Vehicular & drainage culverts etc. and ensuring their compliance with the approved drawings and specifications. Testing - Soil Test, Concrete Test, Pile Tests, Bitumen Test, Plate bearing tests, Plate load tests, Lateral load tests on piles, Dynamic tests on piles, Tensile load tests etc. Blinding, Screed, Methodology of Shot Crete, with Mesh & nail Installation, Geo textile, Structural fill, HDPE Liner and its welding with shear test, Vacuum and stress test. Rebar Test Verification of logs for all calibrated Instruments. Participated in the treatment of any detected discrepancy NCR or site instruction

    • Saudi Arabia
    • Telecommunications
    • 1 - 100 Employee
    • Project Inspector
      • Aug 2007 - Sep 2010

      Good working & Solid knowledge of telecom outside plant construction methods (FOC Direct buried & duct system), Have functional knowledge of OSP design principles and techniques to include the development of cost comparisons, planning studies and related reports, preparation of routine & specific OSP work related orders, engineering documentation & records. Perform daily inspection for the ongoing civil osp works of main and sub contractors, and compare with specification of mobily. Issuing SDR’s (Site Discrepancy Report) for any substandard work. Checked that all the drawings are “approved for construction” from Joint Partners (Mobily, Bayanat, Integrated). Checked the permits for ongoing construction from concern Department. Conducts field Density test using sand cone method and nuclear gauge. Supervision of concrete at job site conducts and records data of slump test, concrete temperature, flow table test and cube/cylinders sampling. Raised all the quantity details in PAT and making check list for every FOC drum as all the construction completed as per requirements. Making joint surveys with contractors and sub-contractors in the reference of authorized issued permits. Verification of Red line drawings as per site situation. Monitoring actual activities against the project requirements. Joint final inspection with all parties in every stage of construction to ensuring the punch checklist. Daily activity reports to the coordinating & operation manager. Weekly progress reports Obstructions or any issues regarding to sites updated the SNFN management. Prepare daily, weekly and monthly progress reports.

Education

  • Board of technical education peshwar KPK Pakistan
    DAE, Civil Associate engg
    2001 - 2003