Imran Shahzada

Senior Electrical Project Engineer at Washnah Trading and Contracting
  • Claim this Profile
Contact Information
Location
Jiddah, Makkah, Saudi Arabia, SA
Languages
  • English -
  • Urdu -
  • Hindi -
  • Arabic -
  • Punjabi -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Member
    Saudi Council of Engineers
  • Member
    National Technology Council, Pakistan

Experience

    • Senior Electrical Project Engineer
      • May 2013 - Present

      Position: Project Engineer Electrical Responsibilities: Project: Sewage Water Treatment plant (Extended Aeration) sulayyil , KSA Programming, Testing and commissioning of STP plant using TIA portal V15 and SCADA. Setting parameter Water Storage Tanks and Pumping Station (Modon Jeddah-3 Project: BADR and AL-AULA 6000m3/day STP (sewage Treatment Plant) Madina Regions  Requirement analysis, Feasibility study and cost estimate of new Projects, Design of the entire control system and control network.  Installation, irrection and commissioning of water Treatment plants R.O, STP.WWTP. Designing of MCC, PLC for Control Systems & SCADA system  Load Calculation Cable Schedule, Electrical manhole designing, Installation Electrical Panel Designing, Electrical Cable routing in AutoCAD and cable rating selection, cable sizing  Tender Estimation, work as Proposal Engineer preparing BOQ, Preparing initial electrical Project Design like SLD, systems architecture Sending inquiries for material and negotiate with suppliers, Writing method of statement and preparing project execution plan.  Technical submittal preparation for submission to Private and Govt. sector for approval.  Follow the Site work and instruct to technicians. Project: 2X250 m3/d SBR waste water treatment plant Taif  Total Load Calculation for plant . Calculate the cable sizing ,Designing of Cable routing drawing of as per site layout.  Designing of I/O list and selecting the appropriate PLC and HMI .calculate the Electrical Control Panel cost, designing of control panel, Designing and draw the schematic diagram of panel using Auto cad.  Designing of Schneider Electric HMI and PLC twido Project: Water Tanker Filling Stations  Prepare the BOQ and estimate the electrical cost for whole station and prepare the initial design as per client requirement. TESTING AND COMMISSIONING OF 1350CMPD RAFAH-KSA Show less

    • Electrical and Control Engineer
      • Apr 2011 - Dec 2012

      ALMAFOR ABU DHABI (UAE) Position: Assist Engineer Electrical and Control Requirement analysis, Feasibility study and cost estimate of new projects, Design of the entire control system and control network  Project: KHALIFA CITY PUMPING STATION Abu Dhabi  Designing and Tagging Human Machine Interface (HMI).specialized in SCHNEIDER ELECTRIC Magelis, Designing of control panel using AutoCAD. PLC control wiring, along with Testing and commissioning at SITE. and installation of VFD, soft starters especially Schneider ALTIVAR series and handling the motor control using PLCs and MPR Project: ABU DHABI INVESTMENT COUNCIL (ADIC HQ)  Installation testing and commissioning of PDU, Designing Schneider PLC program for reading all breaker status and for Monitoring Design HMI Touch screen. Setting Monitoring and managing the status of LV and MCCB Breakers of entire building and Display in HMI . Project: IRRIGATION PUMPING STATION (Kharafi National)  With reference of Control Philosophy as requirement of client establish PLC, I/P and O/P list, designing of Drawings, using AutoCAD 2007.  Installation and configuration of different Field sensors for pressure ,flow level ,temperature etc and integrate them with PLCs  Work as SITE Engineer.  Broad experience and knowledge in different communication standards and protocols such as RS232, RS485, Ethernet TCP/IP, FIP,PROFIBUS,MODBUS and fiber optic communication Show less

    • Maintenance Engineer (Electronics and Electrical)
      • May 2005 - Jun 2010

      (Hayel Saeed Anam Group)Biscuit manufacturing industry. Position: Maintenance Engineer (Electronics and Electrical)  Designing and Modification of Siemens PLC S7,S5, using Simatic Manager software , Designing Of Electrical control panels using PLC, inverters, Pneumatic systems, interface relays , photocells, contactors and switches.  Installation and Maintenance of different type of Processing machine (IMAFORNI, SIMIONATO, FPE ,PETER , BAKER PERKINS, SIG, TECON (American, Italian, German and Swiss ) machines, installation of new Electronics and Electrical Items and of Automatic control feeding and processing systems, controlling through Photo cells and solenoid valve.  Calibration and repairing of Different type of digital scales ISHIDA, load cells and Temperature controllers OMRON, as per ISO standard..  Lead several problem solving efforts that improve quality and eliminate waste, reduce over weights and reduce cost impact of poor performance by increased production efficiencies. Lead and instruct the team for routine wise preventive maintenance of Biscuit manufacturing Plant and update in SAP system and Follow the ISO requirement Overhauling of different types machine and Electrical panels motor , Update the ISO documents . Installation of Forward Reverse, Star Delta, ON and OFF motors with Electrical control and relay logics. Displacement of Electrical Panels.  Reconditioning of old machine,  Installation, Errection and commissioning of SPS wrapping machines and biscuit lines with responsibility of wiring of PLC S7 connections and Troubleshooting, load calculation, cable and breaker selection, Cable tray designing and supervision of technician team.  Metal Detector, Markem, Domino printing machines installation and maintenance  Ensuring proper documentation of all engineering jobs including daily routine maintenance, utilities operation and preparing monthly/yearly operating reports. Show less

    • United Kingdom
    • Computer Hardware Manufacturing
    • 1 - 100 Employee
    • Associate Engineer Electronics
      • Mar 2001 - Feb 2004

      PCB testing, Debugging of multilayer PCBs at Components level. PCBs Designing, Placement, Routing, CAM File Generation, Import and Export Procedure, Decal Design using software. .(PADS PERFORMS) Schematic Designing Using. .(ORCAD) FPGA Design Entering compiling timing analysis Using (ISP Lever) Digital communication equipment (E1&D1) Understanding of vocoder, CPU, data buses and address buses, hardware base Encryption Decryption. Micro controller C8051, assembly language programming and interfacing at starting level. Project prototype, Daily report writing Show less

Education

  • Preston University
    Bachelor's degree, Electrical and Electronics Engineering
  • Government college of technology Lahore
    Associate's degree, Electrical and Electronics Engineering
    1996 - 1999

Community

You need to have a working account to view this content. Click here to join now