Imran Qureshi
unit supervisor at Saba Power Company- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Mohammad Shoeb Siddiqui
Imran is very good person and work hard.
Mohammad Shoeb Siddiqui
Imran is very good person and work hard.
Mohammad Shoeb Siddiqui
Imran is very good person and work hard.
Mohammad Shoeb Siddiqui
Imran is very good person and work hard.
Experience
-
Saba Power Company
-
Pakistan
-
Oil and Gas
-
1 - 100 Employee
-
unit supervisor
-
Jan 2008 - Present
-
-
-
-
imran
-
1997 - 1999
30/08/1999 to date working in Saba Power Plant(Formerly A Subsidiary of ELPASO Corporation USA) as control room operator, responsible for smooth operation startup and shut down of the plant in cost effective way. Attending load dispatches as per demand of national power control center WAPDA Islamabad. Involved in commissioning start up and commercial operation of the plant including Boiler ( 416 t/h BABCOCK & WILCOX USA), steam turbine 135 MW (TOSHIBA JAPAN), water… Show more 30/08/1999 to date working in Saba Power Plant(Formerly A Subsidiary of ELPASO Corporation USA) as control room operator, responsible for smooth operation startup and shut down of the plant in cost effective way. Attending load dispatches as per demand of national power control center WAPDA Islamabad. Involved in commissioning start up and commercial operation of the plant including Boiler ( 416 t/h BABCOCK & WILCOX USA), steam turbine 135 MW (TOSHIBA JAPAN), water treatment plant (ECODYNE CANADA), waste water treatment plant, Fuel oil (High Sulfur Furnace Oil & high Speed Diesel Oil) receiving and handling system. Fire fighting system, 6.6 kV switch gear room operation 132 kv switch yard operation. DCS Using Honeywell experion (Process knowledge system) and balley symphony infi 90 Control system to control main Plant and Allen Bradley PLC to control Deminerlised water treatment Plant Receiving safety training as per OSHA standard regarding work permit hot work permit gas testing, confined space entry, cpr, ppe, first aid, fire fighting etc. 30.01.97 to 06.08.99 AES CORPORATION (USA) at LALPIR Power Plant Muzaffargarh Worked as an Operation Engineer Involved in 365 mw*2 (727 MW ) steam power plants (MITSUBISHI HEAVY INDUSTRIES JAPAN) and utilities, Boiler 1200t/h (MHI Japan) Forced circulation tangent firing with reheater Emergency diesel generator (1 mw) Reverse osmosis water treatment (130 t/h) Deminerlize water treatment (120 t/h) Flue gas desulphurization plant. (FGD) Hydrogen generation system Chlorination system 14.06.93 to 02.01.97 Ministry of Electricity and Water KUWAIT at Doha west Power plant 300MW*8 (2400 mw power generation complex) Boiler 1100t/h *8 Units(DUETCHE BABCOCK), steam turbine 300 mw (Mitsubishi Heavy Ind), Water treatment plant capacity 200 m3/h Desalination plant 96migpd Chlorination plant GAB (General auxiliary basement) Show less 30/08/1999 to date working in Saba Power Plant(Formerly A Subsidiary of ELPASO Corporation USA) as control room operator, responsible for smooth operation startup and shut down of the plant in cost effective way. Attending load dispatches as per demand of national power control center WAPDA Islamabad. Involved in commissioning start up and commercial operation of the plant including Boiler ( 416 t/h BABCOCK & WILCOX USA), steam turbine 135 MW (TOSHIBA JAPAN), water… Show more 30/08/1999 to date working in Saba Power Plant(Formerly A Subsidiary of ELPASO Corporation USA) as control room operator, responsible for smooth operation startup and shut down of the plant in cost effective way. Attending load dispatches as per demand of national power control center WAPDA Islamabad. Involved in commissioning start up and commercial operation of the plant including Boiler ( 416 t/h BABCOCK & WILCOX USA), steam turbine 135 MW (TOSHIBA JAPAN), water treatment plant (ECODYNE CANADA), waste water treatment plant, Fuel oil (High Sulfur Furnace Oil & high Speed Diesel Oil) receiving and handling system. Fire fighting system, 6.6 kV switch gear room operation 132 kv switch yard operation. DCS Using Honeywell experion (Process knowledge system) and balley symphony infi 90 Control system to control main Plant and Allen Bradley PLC to control Deminerlised water treatment Plant Receiving safety training as per OSHA standard regarding work permit hot work permit gas testing, confined space entry, cpr, ppe, first aid, fire fighting etc. 30.01.97 to 06.08.99 AES CORPORATION (USA) at LALPIR Power Plant Muzaffargarh Worked as an Operation Engineer Involved in 365 mw*2 (727 MW ) steam power plants (MITSUBISHI HEAVY INDUSTRIES JAPAN) and utilities, Boiler 1200t/h (MHI Japan) Forced circulation tangent firing with reheater Emergency diesel generator (1 mw) Reverse osmosis water treatment (130 t/h) Deminerlize water treatment (120 t/h) Flue gas desulphurization plant. (FGD) Hydrogen generation system Chlorination system 14.06.93 to 02.01.97 Ministry of Electricity and Water KUWAIT at Doha west Power plant 300MW*8 (2400 mw power generation complex) Boiler 1100t/h *8 Units(DUETCHE BABCOCK), steam turbine 300 mw (Mitsubishi Heavy Ind), Water treatment plant capacity 200 m3/h Desalination plant 96migpd Chlorination plant GAB (General auxiliary basement) Show less
-
-