Imam Suwito

Well Operation Supervisor at ExxonMobil Exploration & Production Malaysia Inc
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Languages
  • English -
  • Bahasa Indonesia -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • IWCF Level 4
    iwcf
    Aug, 2020
    - Oct, 2024

Experience

    • Well Operation Supervisor
      • Nov 2022 - Present

      Manage HWU for P&A Project Manage HWU for P&A Project

    • Oil and Gas
    • 300 - 400 Employee
    • Well Site Manager
      • Jul 2021 - Oct 2022

      Manage and Supervise Well Intervention and well service Operation ( HWU , slick line and E line Unit ). Make sure comply with all standard QA and QC and Safety . Logistic and cost control Manage and Supervise Well Intervention and well service Operation ( HWU , slick line and E line Unit ). Make sure comply with all standard QA and QC and Safety . Logistic and cost control

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Well Site Leader ( Consultant )
      • Apr 2018 - Jul 2021

      Manage and Supervise Offshore Well Intervention Project various Location and different Operator - Star Energy : Pulling out completion and Recompletion , perforation and slick line operation - Petronas P&A project - ExxonMobil Malaysia Well Interventio and SIMOP Operation CT. Eline and Slick line Manage and Supervise Offshore Well Intervention Project various Location and different Operator - Star Energy : Pulling out completion and Recompletion , perforation and slick line operation - Petronas P&A project - ExxonMobil Malaysia Well Interventio and SIMOP Operation CT. Eline and Slick line

    • Oil and Gas
    • 1 - 100 Employee
    • Fracturing Operation Manager
      • Jan 2017 - Feb 2018

      Based on Head office Muscat working client for OOCEP, manage 24,000 HHP Frac pump 2 Blender , 2 Hydration unit and complete set low pressure equipment , Treatment rate between 40 BPM to 80 BPM prop pumped up to 500 MT treating pressure up to 11500 psi average revenue 2M USD per month. Based on Head office Muscat working client for OOCEP, manage 24,000 HHP Frac pump 2 Blender , 2 Hydration unit and complete set low pressure equipment , Treatment rate between 40 BPM to 80 BPM prop pumped up to 500 MT treating pressure up to 11500 psi average revenue 2M USD per month.

    • Frac Consultant
      • Oct 2014 - Oct 2015

      - Wellsite supervisor responsibility for implementation of well workover , include wellbore clean up,Frac operation , E-line , Wire line - Responsible for preparation equipment and execution of well operation programs in accordance with operation program , HSE and QSE On site equipment issue resolution ( QA/QC, compliance, certification etc ) -Establish well operation objective , work scopeand resource, requirement in the preparation off well operation program to incorporate best method and optimum solution - strong problem solving for well operation , Frac , CT , E line and Wire line - Keep tracking well dayli report on Open well and make--sure all activity captured on the report as important for learning process

    • Oman
    • Oil and Gas
    • 700 & Above Employee
    • Well Site Supervisor / Well Service Superintendent
      • Jun 2011 - Sep 2014

      - Wellsite supervisor responsibility for implementation of well workover , include wellbore clean up,Frac operation , E-line , Wire line - Responsible for preparation equipment and execution of well operation programs in accordance with operation program , HSE and QSE - Supervise well intervention operation in desert based, stand alone mode primarily well preparation for hydraulic fracturing up 20000 HHP, hydraiulic fracturing operation HPHT, CT post Frac clean out and post flow back and well testing. -coordinate well service contractor logistic for timely preparation, mobilization and demobilizationof resource - On site equipment issue resolution ( QA/QC, compliance, certification etc ) -Establish well operation objective , work scopeand resource, requirement in the preparation off well operation program to incorporate best method and optimum solution - strong problem solving for well operation , Frac , CT , E line and Wire line - Closed monitor budget / AFE again dayli cost . - Keep tracking well dayli report on Open well and make--sure all activity captured on the report as important for learning process.

    • Well Services (Stimulation Project Coordinator )
      • Aug 2007 - Jun 2011

      Duties, Responsibilities: As Stimulation Project coordinator my responsibility to manage operation day to day basis for deliver integrated stimulation service to client ( PDO ) including but not limited , Fracturing operation 12000 HHP, CTU package for post clean out, Slick line unit, SMS unit for post clean up,as well manage the camp site , logistic for all the operation as well HSE for the whole project , on the project involved 60 to 80 personal onboard each day.Additional value from the project : I implemented the new training program for the operator with the latest equipment model , SuperPOD SBF 615, PCM powder system, as well during this period I have a duty as guest instructor at Abu Dhabi Training centre for 2 month October- November 2010Equipment Used : Super POD, PCM dry Gel, Sand chief,SPS 343 , CTU HR 480, Tree Saver , Slick line unit ,SMS unit ( 2 sand catcher ), Well completed 100+ , Gas well depth ranging from 4200-4600 meter, Oil well depth around 3000 meter, complex frac operation HPHT well 13000 psi at surface with high-density fluid ( bromide ) , BHP 22000 psi, New technology Hi way.

    • Fracturing Cell Leader
      • Jun 2005 - Aug 2007

      Duties, Responsibilities: Start up Fracturing fleet in Libya more focusing development new operator to be stand alone for running Frac equipment, commissioning new unit SBT 615, Supervise the job responsibility for all aspect ,equipment, crew, logistic, communicate with client .Well type : oil well depth ranging from 4000 ft to 7000 ft, Client : WinterShal ( wood Group ),AGIP,REPSOL,AGOCO, Sirte Oil Company, Waha waha, Waha Dahra

    • Job supervisor
      • Jun 1996 - Jun 2005

      Duties, Responsibilities: General supervisor for well service job : Cementing,CT, Fracturing , down hole tool, acidizing.Various client and location : Chevron ( cementer )1996,Conoco drill ship ( cementer ), Premier Oil Jack up ( cementer), Lapindo Brantas ( cementer ) 1998, Chevron duri 1999-2001 ( downhole tool and acid supervisor ), Chevron duri Frac supervisor and CT supervisor 2001-2005.Equipment used, CPS 361 , CPT 671 , SPS343, SPT 342, SBT 612, EA packer, RBP Johnston, RBP SAPEX,Fullbore tension packer.Type well , heavy oil, depth shallow well: 300-400 ft , medium well 4000 ft.Cementing job : foam cement, regular cement , lite- density 10 ppg, Liner cementing, subsea cementing, oil base mud cementing,permablock, cement plug, queeze cementing.Down hole tool : Swab test and acidizing using packer run on tandem EA and RBP for multiple testing zoneCTU : HR 480 for clean out operationFracturing : Clear Frac, Resin coated propant, YFHTD fluid, Fracturing +Propnet, YF100 LG, CoilFrac

Education

  • Brawijaya University
    1992 - 1995
  • SMA 1 Nganjuk

Community

You need to have a working account to view this content. Click here to join now