Ikhwan Hafiz

Project Engineer at TENAGA TIUB SDN BHD
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Nilai, Negri Sembilan, Malaysia, MY
Languages
  • English Professional working proficiency
  • Malay Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Lukman Alhakim

Ikhwan isn't just a meticulous project engineer but most importantly a genuine person. As the customer, I am thoroughly satisfied with his output as he is very thorough in task execution and can be depended upon to get the job done. He certainly leads by example and many people at Powermatics find his enthusiasm and dedication both inspiring and motivating.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Oil and Gas Safety Passport (OGSP)
    National Institute of Occupational Safety and Health
    Jan, 2020
    - Oct, 2024
  • Authorised Entrant And Standby Person For Confined Space (AESP)
    National Institute of Occupational Safety and Health
    Jan, 2020
    - Oct, 2024
  • CIDB Green Card
    Construction Industry Development Board (CIDB)
  • ISO 9001:2015 Internal Auditor
    Neville Clarke Malaysia

Experience

    • Malaysia
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Project Engineer
      • Dec 2019 - Present

      A company that provide specialized and integrated engineering services to a wide spectrum of customers, particularly in water and electric utilities, oil and gas, petrochemical, agro-based and other general industrial facilities.  Boiler tube replacement for Aux Boiler at Prai Powerplant Sdn Bhd (PPSB).  Refurbish and replacement of 56 unit or IR3Z soot blower and wallblower at TNB Janamanjung M4.  Boiler AQC1 Evaporator tube replacement for YTL Perak Hanjoong Cement Sdn Bhd.  Petronas MLNG Boiler sidewall tube and 108 nos of superheater panel fabrication.  Refurbishment of Petronas Gas Berhad (PGB) Aux Boiler F3-791 superheater tube bundle. Replace 122 nos of boiler tubes.  HRC Port Dickson COB Boiler soot blower servicing.  Final Reheater Superheater boiler tube replacement at TNB Janamanjung M4.  Kapar Energy Ventures (KEV) Unit 5 Reheater boiler tube replacement  Petronas Gas Berhad (PGB) Fabrication of Auxiliary Boiler Superheater BundleF3-781. Show less

    • Project Engineer
      • Sep 2019 - Dec 2019

      A company that major and specialized in manufacturing of Telekom Malaysia’s telecommunications parts/components and its accessories in Malaysia.  Assigned by the Operation Manager to replace and perform the role of previous Project Manager as the person in charge of Telekom Malaysia (TM) related matter.  To attend meeting with TM personnel at Menara TM Bangsar and act as company’s representative, to report and provide information on fabrication progress and actual timeline on their order.  Make arrangement on items and quantity to be delivered to TM by having proper documentation (DCS, Appendix A, Jadual 1) through TM MQAC portal.  Perform internal inspection on finished product dimension, galvanize coating thickness, and packing/labelling before FAT with TM representative.  Plan and make decision on which components to be FAT by TM representative, based on the expiry date of the Delivery Confirmation Slip (DCS) and forecasting the production of individual components/parts.  For every Request For Order Confirmation (RFOC) by TM, to review and study on the raw material of every component required, to be presented to Operation Manager for approval prior PO issuance. Show less

    • Project Engineer
      • Jun 2015 - Jun 2019

      A company that lead others in industrial hydraulics engineering and development and manufacturer in Malaysia  Person in charge for Mhe-Demag Malaysia, Singapore and Philippines scissor lifts order. Ensure smooth process from material/component availability, long lead items, fabrication, FAT with customer representative and on time delivery.  In house Murphy Oil’s Production Riser Tensioner (PRT) cylinder servicing - cylinder barrel honing, piston rod dye penetrant inspection, barrel ID surface roughness inspection, sandblasting and 3 coat marine painting as per customer requirement.  Responsible for Favelle Favco and FES Equipment Services oil and gas / cranes jobs and orders. (Eg; Luffing cylinder, Climbing cylinder).  Person in charge to manage, keep record and prepare documentation on customer’s completed jobs. (Eg; Inspection Test Plan – ITP, mill certificates, cylinder drawing, pressure test reports, NDT test reports, mechanical test reports, sandblasting and painting reports, manufacturer data reports).  Material sourcing such as rods, steel plates and round bars from local and overseas supplier.  Review mill certificates and purchase material with its cost (price/kg), transportation and shipping cost, lead time and delivery time taken into consideration.  Wide range of material procured, most notably for offshore cranes with charpy requirement minimum 27J individual and 34J average tested at -20’c such as S355J2, EH36, ST52-3, and A350LF2.  Other material frequently procured are AISI 4340, C45, 1045 and 1191.  Material testing (tensile test, charpy test and chemical analysis test) at Nusantara Technologies (Nusatek) with Favelle Favco / FES QC and third party (Bureau Veritas) for 3.1 to 3.2 material requirement conversion, according to British Standard (BS) or American Standard (ASTM).  Perform FAT on the cylinder witnessed by Favelle Favco / FES QC and Bureau Veritas representatives before sending out for sandblasting and marine coat painting. Show less

    • Malaysia
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Technical/Project Engineer
      • May 2014 - Apr 2015

      A company that provides Renewable Energy (RE) and Energy Efficiency (EE) solutions by means of solar PV and wind system in Malaysia.  Supervise the solar panel construction on site to ensure that the construction complies within the method and specification planned.  Involve in biggest rooftop solar project in Malaysia located at Sepang Maskargo building complex, 5.28mW.  Review and report on the progress on site to Project Manager.  Ensure that the contractor maintains the work to the required standards and qualities until handover.  Liase with contractor and suppliers on work schedule and stock availability.  Perform routine inspection during construction.  Revise and make decision for material acquisition, from quotation till delivery. Show less

Education

  • Universiti Kuala Lumpur
    Bachelor in Mechanical Engineering (Aircraft Mechanical), Mechanical Engineering
    2011 - 2014
  • Universiti Kuala Lumpur
    Diploma in Engineering Technology (Aeroplane Maintenance), Engineering
    2008 - 2011
  • Maktab Rendah Sains Mara Kuala Terengganu
    SPM
    2005 - 2006

Community

You need to have a working account to view this content. Click here to join now