Ibtisam Umar Agha
Field Engineer at Aquamatch- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Aquamatch
-
Türkiye
-
Renewable Energy Semiconductor Manufacturing
-
1 - 100 Employee
-
Field Engineer
-
Feb 2019 - Present
-
-
-
Descon
-
Pakistan
-
Engineering Services
-
700 & Above Employee
-
Electrical Technologist
-
Mar 2018 - Jan 2019
Job at Descon Engineering involves installation of electrical equipment, testing and commissioning of system with different vendors.Project: Qatar Power Transmission System Expansion – Phase 13Site: 132/66/11kV UMM-EBAIRIYA SUBSTATIONDesignation: Electrical TechnologistMajor Responsibilities:Site Planning and Preparation.TQ (Technical Queries) solving related to drawings.Calculate BOQ’s according to scope of work.Request for Inspection (RFI) and Progress Report.Raise Material request as per requirement.Prepare Reconciliation Report.Scope of Work:132kV/66kV GIS Bays Installation.11kV Switchgears Installation.Cable Tray and Earthling. Cable laying, Glanding and Termination.Continuity and Insulation Resistance Testing.Other Projects:Qatar Gas project for upgrading DCS of Train#4 by Emerson.NKOM project for updating AHF and capacitor banks in substations by ABB. Qatar Gas Project for updating Docking and Mooring system at Berth-1 Ras Laffan Port by Trelleborg.Site: Qatar GasDesignation: SupervisorMajor Responsibilities:Initiating and completing all applicable section of Permit to work.Supervising the work prescribed in the permit to work to ensure it is conducted in the most efficient manner.Notifying the work progress and completion, and ensuring that the site is returned to a safe and operation state.Taking adequate care to work on live system.Providing and arranging all necessary resources related to performing work.
-
-
-
Water Regime Pvt. Ltd.
-
Pakistan
-
Utilities
-
1 - 100 Employee
-
Electrical Technologist
-
Feb 2015 - Feb 2018
Job at Water Regime involved analysis, design and Implementation and commissioning of hardware for different water treatment technologies as Reverse Osmosis, ultra filtration, Multimedia filters etc.Major Responsibilities1. Determining the IO count for PLC from P&ID.2. BOQs generation for new plants..3. Preparation of electrical drawing on AutoCAD software.4. Complete Operation and Panel wiring including control and power.5. Installation and troubleshooting of 3 Phase and single Phase power system.6. Wiring and installation of Motor control circuits including DOL, Star delta ,VFDs and Dosing Pumps.7. Installation and Calibration of Instruments including pH, Conductivity and flow Transmitters. 8. Prepare all necessary documentation for handing over including Functional Design Specification and Safety Design Specification9. Preparation and testing of HMI screens and PLC programs. 10. Testing and Commissioning of Plants.Programmable Logic Controller (PLC) used for AutomationMitsubishi FX 3G Series PLC along with Analogue I/O Cards for pumps P.I.D ControlDedicated Controllers for Water Treatment: OS2030, OS3020, OS3030, Multifunctional flow controlHuman Machine Interface (HMI) used for AutomationWeintec MT6070iH, TaiwanInstrumentation Transmitters /Meters: Flow, PH, ORP, TDS/ Conductivity, Pressure, Temperature, Turbidity On Behalf Of Water Regime I Worked At Below Major Plants1. Feroze 1888 Mills Karachi - Ultra Filteration Plant 85 m3/hr 2. Gourmet Foods - Reverse Osmosis Plant 38 m3/hr3. Feroze 1888 Mills Karachi - Sea Water Reverse Osmosis Plant 38 m3/hr 4. Cakes & Bakes Foods Lahore - Reverse Osmosis Plant 12 m3/hr5. Atlas Honda - Reverse Osmosis Plant 10 m3/hr6. Rajby Textile - Reverse Osmosis Plant 10 m3/hr
-
-
Education
-
Global Institute Lahore
Bachelor’s Degree, Electrical Technologist -
Quaid e Azam Group of Technical College, Pattoki, Kasur
Associate’s Degree, Electrical and Electronics Engineering