Ibrahim Khreishi

Design Manager / Technical Manager/ Senior Architect / Estidama (PQP) at Ghantoot Gulf Contracting
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Abu Dhabi Emirate, United Arab Emirates, AE
Languages
  • Arabic -
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Estidama Pearl Building Rating System - PQP - PBRS Certificate
    (UPC) Urban Planning Council
    Apr, 2013
    - Nov, 2024
  • Green Buildings Concepts and Strategies - LEED ® green Associate Exam Preparation
    Chicago Training & Consultancy
    Dec, 2011
    - Nov, 2024
  • Green Buildings Concepts and Strategies - LEED ® green Associate Exam Preparation
    FRANKLIN UNIVERSITY
    Dec, 2011
    - Nov, 2024

Experience

    • Design Manager / Technical Manager/ Senior Architect / Estidama (PQP)
      • Nov 2010 - Present

      Design & Build Upgrading of Existing Punitive & Reformatory Buildings Complex at Al Wathba (Phase -1)• The total capacity of the project is estimated at 908 inmates, divided into 88 inmates (women) in Segregation Cells and 820 inmates (women) in Dormitory Cells.Total built up area 23,828.46 m² - 2 Pearl Rating required of Estidama (PBRS).Design Manager, Sr. Architect, Technical Manager, & Estidama PQP- Managing, coordinating and delivering technically challenging projects on time, within budget and to the desired quality;- Managing a single or multi-functional design team responsible for delivering projects in accordance with client’s requirements- Coordinating design activities across various disciplines within the design team;- Comfortable with interfacing with the Client and other design team members regarding the production of information in line with agreed deliverables- Understanding and managing changes to scope, budget and program.- Identifying risks and opportunities and contributing to the project risk and opportunities register- Escalating any matters that could pose a potential contractual/commercial risk at the earliest opportunity;- Management of internal costs/resource against proposed budget targets- Progress reporting and monitoring progress in line with project KPI’s- Participate in design meetings and provide continual input to optimize design and minimize futile work.- Assist in developing Design Delivery Schedule along with client, Project Manager, Design Managers and consultants. Show less

    • Design Manager / Technical Manager
      • Nov 2010 - Nov 2021

    • United Arab Emirates
    • Construction
    • 700 & Above Employee
    • Senior Architect / Estidama PQP
      • Nov 2010 - Present

      Repton Private School: Sr. Architect.  Repton Private School, B + G + 3 CONSISTING OF CLASSROOMS & SPORTS FACILITIES (INDOOR & OUTDOOR), AL REEM ISLAND Total Area 25,000 m² - 1 Pearl Rating required of Estidama (PBRS). - Checking submittals of shop drawings / material submittals to Sub Contractor & suppliers. - All Discipline clash detection, clash reporting & RFI preparation. - Monitoring shared data between technical office & MEP department. - Monitoring architectural shop Drawing & RFI updates. - Preparing shop drawings & RFI’s with attached clash detection illustration. - Resolving clashes through coordinating between engineers of different disciplines. - Exporting composite drawings of Arch, Struc. & MEP. - Developing Composite shop drawings for coordination purposes: Arch RCP & MEP services. - Resolving MEP clashing internally through coordinating with MEP Engineers. - Operating architectural detailing. - Calculating average U values for building envelop. Show less

    • Division manager documents and contracts, Contract Document Development. Senior Consultant Engineer
      • Nov 2007 - Oct 2010

      - Refurbishment of Al Wathba Prison Facility Project (Maintenance and New Buildings), concept, Architectural design and working drawing (Tender Documents). - Refurbishment of Al Ain Prison Facility Project (Maintenance Report). - Government Authority Approval follow ups. - Finalized Presentations. - Refurbishment of Al Wathba Prison Facility Project (Maintenance and New Buildings), concept, Architectural design and working drawing (Tender Documents). - Refurbishment of Al Ain Prison Facility Project (Maintenance Report). - Government Authority Approval follow ups. - Finalized Presentations.

    • Architect
      • Nov 2004 - Nov 2007

      - Private Villas, concept, designed and working drawing. - Towers (Highscrapers), designed and working drawing. - Malls, designed and working drawing. - Interior designed for some projects. - Landscaping. - Finalized Presentations. - Private Villas, concept, designed and working drawing. - Towers (Highscrapers), designed and working drawing. - Malls, designed and working drawing. - Interior designed for some projects. - Landscaping. - Finalized Presentations.

    • Architect
      • Aug 2004 - Nov 2004

      - Private Villas, concept, designed and drawing. - Finalized Presentation of projects. - Private Villas, concept, designed and drawing. - Finalized Presentation of projects.

    • Architect
      • Dec 2003 - Aug 2004

      - Private Compound, concept, designed and drawing. - Office one store, decoration ideas, concepts...etc. - Two-Storey Residence / Teymour Abdullah Reza & partners Co. - Private Compound, concept, designed and drawing. - Office one store, decoration ideas, concepts...etc. - Two-Storey Residence / Teymour Abdullah Reza & partners Co.

    • Architect
      • Aug 2003 - Dec 2003

      - Issa villa project drawing. - King Fahed Public project. - Asdaff villa project. - Riyadh villa project. - Issa villa project drawing. - King Fahed Public project. - Asdaff villa project. - Riyadh villa project.

Education

  • Applied Science University
    Bachelore, Architecture Engineering
    1995 - 2003

Community

You need to have a working account to view this content. Click here to join now