Ian Hobday

Construction Site Manager at London Underground
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Renewables & Environment
    • 300 - 400 Employee
    • Construction Site Manager
      • Feb 2019 - Present

    • Site Supervisor
      • Jan 2018 - Present

      since January 2018 I have been part of the phase 3 train mod team. Mainly been the depot liaison between the production team and the phase 3 team. This has generally been office based and also to monitor the progress of the project.

    • Site Supervisor
      • Sep 2016 - Present

      Victoria line upgrade 2Monitored site performance. Sent in nightly reports and monitored the test train runs from Walthamstow - Brixton.May 2017, I joined the rest of the team to watch over the 4LM CBTC installation monitoring contractor performance and generally raising issues and concerns on how the new system is being installed.January 2018. I was asked to monitor the train crew wiremen at Stratford Depot who performing the final train modifications for the TBTC system that I took part in when I was with Tube Lines Show less

  • Tube Lines
    • London, United Kingdom
    • field engineer
      • Sep 2004 - Sep 2016

      March 2014, attended Iosh course. I Later found out in may that I had passed the course. monitoring contractor site performance. assessing risks are ALARP. sending daily reports to team leaders. helping contractors in resolving/eradicating problems. looking after the company safety record by pro actively adhering too there safety policies. Undertaking varing roles as Field Engineer. Have all current track certifications in place for the underground from Quaf 54 - ICI. Stratford depot. Oversore the removal and reconstruction of Stratford depot drivers platforms and new track walkway. Monitored the installation of the new bridge to the control tower. Took possession of the depot on numerous occasions. Train based transmission communication project. Monitored staff performance / quality of workmanship. Controlled health and safety on each site. Northern line decommissioning project. Monitored onsite health and safety and logged asset removal. Show less

    • Public Relations and Communications Services
    • 100 - 200 Employee
    • telecommunications engineer
      • Jul 1999 - May 2004

      installed part of the Telia Fibre optic Euro ring from london - lowestoft - Leiden in holland. tested each way. installed various new cables for Telia uk head office at Gloucester Rd. Helped set up the canning town fibre hub from ground upwards to complete finish. Helped install a new Fibre link from Mile End station too Westferry Circus via the Docklands light railway. installed part of the Telia Fibre optic Euro ring from london - lowestoft - Leiden in holland. tested each way. installed various new cables for Telia uk head office at Gloucester Rd. Helped set up the canning town fibre hub from ground upwards to complete finish. Helped install a new Fibre link from Mile End station too Westferry Circus via the Docklands light railway.

    • Telecomm engineer
      • Aug 1989 - Oct 1997

      installation of lul victoria line fibre network. Spliced and terminated the circle /district and Hammersmith & city line fibre network. Telephone maintenance engineer throughout the underground network repairing and installing telephone lines. spent 9 months at sizewell B power station installing the new communications room for the admin block. worked on numerous BP locations installing fibre/ cat5/5e networks/ ibm coax links. Renewing most of the underground exchange room fire alarm system throughout the underground network. Worked for unisys under contract, installing networks within various buildings in London. Show less

Education

  • hurstmere grammer school, bexley kent
    Gcse grades, Geography, technical drawing, metalwork. Woodwor
    1977 - 1982

Community

You need to have a working account to view this content. Click here to join now