Iñigo Azurmendi Comet

Senior Mechanical Engineer at Aker BP ASA
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Rogaland, Norway, NO
Languages
  • Español Native or bilingual proficiency
  • Inglés Full professional proficiency
  • Francés Elementary proficiency
  • Vasco Limited working proficiency
  • Noruego Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Offshore safety course
    Falck Nutec AS
    May, 2013
    - Nov, 2024
  • Certificate of medical fitness for offshore activities
    Aker Solutions
    May, 2013
    - Nov, 2024

Experience

    • Norway
    • Oil and Gas
    • 700 & Above Employee
    • Senior Mechanical Engineer
      • May 2022 - Present

    • Norway
    • Oil and Gas
    • 700 & Above Employee
    • Discipline Lead Mechanical & HVAC
      • Aug 2020 - May 2022

    • Senior Mechanical Engineer
      • Jan 2018 - May 2022

      Package Responsible Engineer at the Maersk Inspirer Redeployment project, my responsibilities are establishing technical requisitions, evaluating bids, technical follow up with suppliers and supplier documentation, responsible for coordination with other disciplines, FAT verifications, technical point of contact with the client. I am responsible for the following packages:-Waste Heat Recover Units. Scope of work consisted on the demolition of two WHRU and procurement of two new units with higher capacity to accommodate the project's needs. The package required a lot of multidisciplinar coordination and close follow up with vendors and construction team. -Deluge Skid. Scope of work consisted on procurement of new skids and foam tanks for the deluge system and minor modifications of the existing skid. -Electrical Cable Bundles. High criticality package as a solution to an unsuccessful previous study, the goal of the package is to provide power and signals in between the Maersk Inspirer rig and the Yme Well Head Module. This package required coordination between two different projects and two different clients, technically complex package due to the relative displacement between the rig and the well head module and a very short schedule for design, manufacture, delivery and installation.-Early input to separator & scrubber packages Show less

    • Norway
    • Oil and Gas
    • 1 - 100 Employee
    • Project Engineer
      • Aug 2014 - Jan 2018

      Execution and follow up of different projects, from new production to maintenance and re-certification of drilling equipment. Kickoff meetings with clients and 3rd parties, planning, execution and coordination of technical follow-up activities. Budget monitoring and control. Project scheduling. Preparation of work instruction packages, inspection plans and any required tasks to fulfil re-certification standards. Technical pre-order input. Technical input for equipment such as HPE swivels, Risers, Tension rings, Slip joints, etc. Show less

    • Norway
    • Oil and Gas
    • 700 & Above Employee
    • Mechanical Engineer
      • Mar 2013 - Aug 2014

      Responsible for the study and execution of discipline specific technical activities. Offshore surveys and onshore tests Technical requisition and functional specification in accordance to design codes and standards Equipment installation and demolition Execution and coordination of Supplier Documents and Drawings approval (SDD) Planning, execution and coordination of technical Follow-up activities Execution of technical Pre-order activities Multidiscipline coordination Creation of Job cards Show less

  • GAINDU automation
    • Elgoibar, Spain
    • Summerjob
      • Jul 2012 - Aug 2012

      Test solutions assembly for automotion components. Took part in the assembly phase of different test solutions for engine components. Training in basic tasks and start up of the solutions Test solutions assembly for automotion components. Took part in the assembly phase of different test solutions for engine components. Training in basic tasks and start up of the solutions

    • Luxembourg
    • Administration of Justice
    • 700 & Above Employee
    • Student summerjob
      • Jul 2010 - Jul 2010

      Performed the following tasks: User management for the Court's Teleworking infrastructure End-user hardware management and installation Administrative support Performed the following tasks: User management for the Court's Teleworking infrastructure End-user hardware management and installation Administrative support

Education

  • Norges teknisk-naturvitenskapelige universitet / Norwegian University of Science and Technology (NTNU)
    Master thesis: "Instrumentation for measuring wind conditions relevant for wind power"
    2012 - 2013
  • Tecnun - Universidad de Navarra
    Master of Engineering (M.Eng.), Mechanical Engineering
    2005 - 2012
  • Norwegian University of Science and Technology (NTNU)
    Erasmus programme, Mechanical Engineering semester
    2011 - 2011

Community

You need to have a working account to view this content. Click here to join now