Hugo Schneider

engine project manager at Bubendorff
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Mulhouse Area, FR

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • 1 - 100 Employee
    • engine project manager
      • Oct 2022 - Present

      In the design office team responsible for the design and redesign of rolling shutter motors In the design office team responsible for the design and redesign of rolling shutter motors

    • France
    • Real Estate
    • 1 - 100 Employee
    • Mechanical design engineer
      • Feb 2022 - Jul 2022

      • Design of a secured bicycle box for the city of Mulhouse. • Ideation phase of the box based on the city's specifications. • CAD modelling of the mechanically screwed box. • 2D drawing and creation of files for fabrication processes. • Pitch and presentation of the project to clients. • Supplier contacts, project meetings. • Realization of assembly guides. • Strength study on Solidworks simulation. • Design of a secured bicycle box for the city of Mulhouse. • Ideation phase of the box based on the city's specifications. • CAD modelling of the mechanically screwed box. • 2D drawing and creation of files for fabrication processes. • Pitch and presentation of the project to clients. • Supplier contacts, project meetings. • Realization of assembly guides. • Strength study on Solidworks simulation.

    • France
    • Electric Power Generation
    • 700 & Above Employee
    • Engineer Assistant
      • Aug 2020 - Feb 2021

      Completion of two assessments necessary to validate the restart of the two reactors of Flamanville NPP • Realization of a history of the operations carried out. • Analysis of the measured values. • Comparison and justification of variances between operations. • Liaison with the national unit and REX of the plant. Completion of two assessments necessary to validate the restart of the two reactors of Flamanville NPP • Realization of a history of the operations carried out. • Analysis of the measured values. • Comparison and justification of variances between operations. • Liaison with the national unit and REX of the plant.

    • France
    • Utilities
    • 700 & Above Employee
    • Assistant RH
      • Jul 2018 - Jul 2018

      Préparation à la numérisation des dossiers d'agents Préparation à la numérisation des dossiers d'agents

    • France
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Student internship
      • Jan 2018 - Feb 2018

      Work on engine production line Work on engine production line

Education

  • Université de Technologie de Belfort-Montbéliard
    Diplôme d'ingénieur, Ingénierie mécanique
    2017 - 2022

Community

You need to have a working account to view this content. Click here to join now