Hug Sylvain
Detailed Design/Site Manager at SPE Tech AG- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
French Native or bilingual proficiency
-
English Full professional proficiency
-
German Full professional proficiency
Topline Score
Bio
Experience
-
SPE Tech AG
-
Switzerland
-
Mechanical Or Industrial Engineering
-
1 - 100 Employee
-
Detailed Design/Site Manager
-
Sep 2014 - Present
Nestlé Nespresso S.A.Orbe: Support Suivi Projets (Groupe Projets Technique)PHARMAPLAN AG Projet WAinf Gemini LONZA: Site managerNestlé Nespresso S.A.Avenches: Support Suivi Projets (Groupe Projets Technique)Group ELSA Miforma Estavayer-le-Lac: Support Suivi Projets (Groupe Projets Technique)Coop Chocolats HALBA/SUNRAY Pratteln: Site manager Nestlé Nespresso S.A.Orbe: Support Suivi Projets (Groupe Projets Technique)PHARMAPLAN AG Projet WAinf Gemini LONZA: Site managerNestlé Nespresso S.A.Avenches: Support Suivi Projets (Groupe Projets Technique)Group ELSA Miforma Estavayer-le-Lac: Support Suivi Projets (Groupe Projets Technique)Coop Chocolats HALBA/SUNRAY Pratteln: Site manager
-
-
-
Alstom Power
-
Electric Power Generation
-
700 & Above Employee
-
Team Leader Turn Key & Itemized Packages
-
Nov 2011 - Aug 2014
- Itemized Package: Piping GRP – Concrete – Carbon Steel Rubber lined - Modularisation: Reference Plant, Project Tzafit, Köln Niehl (Germany) 3D PDMS- Develop of Modularisation engineering time schedule 3D PDMS- Main Cooling Water Piping & Support Project Azzour 3D PDMS- Underground Network Design coordnation with Civil Engineering Service Partner (ESP)- Rop Plant Piping & Arrangement COORDINATION 3D PDMS
-
-
Project Engineer
-
Jan 2009 - Nov 2011
- Project Pembroke: Itemized Package MCW (GRP- Concrete - Carbon steel Rubber Lining) - Detail design INAP coordination activities
-
-
-
-
Project Engineer Arrangement & Piping
-
Jan 2006 - Dec 2008
- Ultra Pure Water Treatment plant for TECH-Semicon /Bentley 3D (Singapore)- Waste Water Treatment plant for TECH-Semicon / Bentley 3D (Singapore)- Ultra Pure Water Treatment plant for SSMC-Semicon /Bentley 3D (Singapore)- Demineralization Plant for Alstom Power Cycofos/ Bentley 3D (France)- Condensate Treatment plant for Alstom Power RWE / Bentley 3D (Germany)- Condensate Treatment plant for Alstom Power Modugno / Bentley 3D (Italy)- Ultra Pure Water Treatment plant for INTEL-Semicon / Bentley 3D (Singapore)- Module concept design of Equipment, coordination with Packager in Singapore.- Coordination with Site erection, client, suppliers.
-
-
-
Alstom Power
-
Electric Power Generation
-
700 & Above Employee
-
Piping Design Engineer
-
Jan 1999 - Dec 2006
- Power station Valle de Mexico (Mexico) . Waste water concept (3D), coordination with Civil detail. . Piping arrangement Rest of plant (BoP) (3D) . Coordination with detail design Engineering. (3D)- Power station Al Hidd (Italy) . Piping arrangement (3D)- Power station Senoko (Singapore) . Coordination with Engineering Office Supplier Piping/Support, HYUNDAI (Korea). . Engineering Support on site. (STO)- Power station Cartagena (Spain) . Design of MCW GRP (Turbine hall) Coordination Supplier Piping/Support GRP material (3D) . Technical evaluation. . .Site coordination, Civil, Mechanical
-
-
-
-
Mechanical Designer
-
Nov 1990 - Dec 1998
- PAUL SCHERRER INSTITUT (PSI) - VILLIGEN Piping arrangement and civil coordination.- ABB TURBO SYSTEM AG - BadenPiping arrangement, detail arrangement.- ALSTOM POWER (Baden)P&ID Design, piping arrangement. - PAUL SCHERRER INSTITUT (PSI) - VILLIGEN Piping arrangement and civil coordination.- ABB TURBO SYSTEM AG - BadenPiping arrangement, detail arrangement.- ALSTOM POWER (Baden)P&ID Design, piping arrangement.
-
-
Education
-
Lycee Technical Louis Armand
Technical School -
Lycee professionnel Rue du fil
MECHANICAL DESIGNER