Hubert Szabatowski
Engineering Surveyor at Femern Link Contractors (FLC)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Femern Link Contractors (FLC)
-
Denmark
-
Construction
-
200 - 300 Employee
-
Engineering Surveyor
-
Feb 2023 - Present
-
-
-
HORISONTALPLAN AB
-
Sweden
-
Construction
-
1 - 100 Employee
-
Engineering Surveyor
-
Jul 2022 - Nov 2022
-Setting out superstructure elements for concrete and steel bridge including future railway -Full setting out package including: road structure, reinforcment concrete, piling, drainage and earth works -3D modelling -As-built survey and processing data for main contractor -Establishing new control network -Topographical survey -Setting out superstructure elements for concrete and steel bridge including future railway -Full setting out package including: road structure, reinforcment concrete, piling, drainage and earth works -3D modelling -As-built survey and processing data for main contractor -Establishing new control network -Topographical survey
-
-
-
Warner Surveys
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Engineering Surveyor
-
Mar 2019 - Apr 2022
-Leading many projects for T1 contractors. -General setting out for RC frameworks, steel structure, groundworks, utilities, grid lines, intersections, holding down bolts, level datums. -As-built of steel/RC frames and producing drawings. -Plumbing walls, columns before pouring the concrete. -Monitoring industry. -Piling jobs including sheet piles. -Topographical surveys -3D scanning -Establishing a new control network for other subcontractors. -Transferring control points using plumbing laser. -Setting out lift shafts, escalators, hoists, cranes base, etc. -Processing data using software N4ce, Starnet, AutoCAD, BricksCAD. Projects: Paddington Square (2 years), 18 floors building. Project cost: £350mln. Main contractor: Mace Group. University of Brighton 5 buildings 8-18 floors. Project cost £160m. Main contractor: Bouygues. Amazon warehouse in Monchengladbach/Dusseldorf - Germany. Sky-Labs. Project cost: £40mln. Main contractor: ISG Show less
-
-
-
Morrisroe
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Setting out Engineer
-
Aug 2018 - Feb 2019
-Preparing deck level with regards to document specification for a post-tension slab with slope.-As-built survey on site of all the structural elements.-Plumbing columns, walls.-General setting out on the slab.-Checking installed tendons to the design.-Setting out and plumbing lift shaft.-Transferring control points with existing local coordinates.-Setting out the position of new pipes for concrete pomp.-Checking daily files regarding upcoming works on site.Project:The Madison, Canary Wharf 55 floors building. Project cost:£150mln. Main contractor: Balfour Beatty. Show less
-
-
Junior Site Engineer
-
Sep 2017 - Jul 2018
-Setting out RC frames walls, groundworks, drainage, ramps.-Assisting with QA.-Calculation cubic meters of concrete.-Precast setting out.-As-builts-Understand and interpret drawings and specifications.-Resolve any unexpected technical difficulties and other problems that may arise at any time.-Communicating and liaising effectively with colleagues.-Thinking creatively and logically to resolve design and development problems.Project:Tottenham Hotspur Stadium. Project cost: £1B. Main contractor: Mace Group Show less
-
-
-
Oglive Geomatics
-
Huntingdon, A14 Motorway
-
Topographic Land Surveyor
-
Aug 2017 - Aug 2017
-3D Laser scanning using Leica P40 -Establishing new control network. -3D Laser scanning using Leica P40 -Establishing new control network.
-
-
-
Alstom
-
France
-
Rail Transportation
-
700 & Above Employee
-
Land Surveyor
-
Jul 2016 - Jul 2017
-Survey data processing using Amberg Rail, spreadsheets, and preparing reports. -Installation and measurements of project survey control network. -Setting out of various track forms and substructures, walkways, equipment including OHLE and M&E. ---Bored tunnel environment, underground station environment. -As-built measurements, analysis, creating reports, quality forms, maintenance of the measured database. -Working with OHLE team as a site engineering role for installation drop tubes. -Setting out design structures, using dimensions and track alignments, road runner rail, and stake out software, for manual setting out. -Assisting in Floating Track Slab for setting out the concrete beams, steel, rails. -Cross passage setting out. -Standard Track Slab, setting out for the different elements requires completing the track. -Assisting in works with drilling machine team with regards to design standards and data. Project: Crossrail Show less
-
-
Education
-
Politechnika Koszalińska
Engineer Land Surveyor, Geodesy and cartography -
University of Technology Koszalin