Holli Cramm, P.E.
Vice President - Houston at Stokes and Spiehler- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Spanish Limited working proficiency
-
Arabic Elementary proficiency
Topline Score
Bio
Credentials
-
Registered Professional Engineer
Texas Board of Professional Engineers and Land Surveyors
Experience
-
Stokes and Spiehler
-
United States
-
Oil and Gas
-
1 - 100 Employee
-
Vice President - Houston
-
1996 - Present
Completion/Workover/Production Engineer • Prepare and supervise workover, completion, and abandonment programs for land, inland, and offshore operations • Recent projects include: • Prepared workover and abandonment procedures as well as production monitoring for 20 conventional gas wells in South Texas • Prepared workover and abandonment procedures for sour gas wells in East Texas • Managed project to modify and repair hurricane damaged production facilities in Texas state waters • Completed workover, completion, and stimulation program for 80 conventional gas wells in South Texas • Researched, prepared and certified over 200 P&A procedures in federal offshore waters • Completed and frac’d 15 wells in East Texas including over 25 fracs • Prepare field studies to identify workover candidates and optimization opportunities • Design HTHP completions • Provide production monitoring and regulatory compliance to a variety of clients Show less
-
-
-
Apache Corporation
-
Oil and Gas
-
700 & Above Employee
-
Senior Evaluations Engineer
-
1995 - 1996
• Prepared reserve and economic evaluations for over twenty GOM properties targeted as prospective lease sale and farmin candidates. • Prepared pre-spud evaluations, conducted engineering partner meetings, coordinated inter-company functions, designed testing procedures, evaluated logs, prepared post drill evaluations, recommended completion procedures, and prepared development plans for six drilling prospects • Prepared year end reserve report on three new drilling prospects including reserve calculations, economics, field development scenarios and documentation. • Prepared economic and reserve evaluation of exploration prospects. Show less
-
-
-
Aquila
-
Utilities
-
200 - 300 Employee
-
Senior Engineer
-
1993 - 1995
• Principal engineer for seven operated and two non-operated platforms in the Western Gulf of Mexico representing 27% of company’s net production, 13% of current capital budget, and 76 BCFe of risked reserve drilling potential. • Responsible for production maintenance, field studies, budgeting, and recompletion/workover programs • Supervised consultants in the planning and execution of offshore projects including a new 10” pipeline, facility upgrades, and conductor guide additions to an existing braced caisson structure. • Principal Engineer for GOM 3-D exploration program. Responsible for evaluating prospects for lease sales and farmins • Completed nine evaluations resulting in five lease sale acquisitions and one farmin resulting in an exposure of $53MM with 145 BCFe risked reserve potential. • Coordinated collection of AFE approvals, permits, and shallow hazard surveys • Prepared reserve and economic evaluations of drilling prospects and exploration candidates • Assisted Planning Manager for company wide budget preparation and reporting • Served as Command Center Information Coordinator for Oil Spill Response Team Show less
-
-
-
BHP
-
Australia
-
Mining
-
700 & Above Employee
-
Petroleum Engineer
-
1990 - 1993
• Evaluated international drilling prospects and prepared economic analyses • Assisted in the development of an entry strategy for the Southern Cone of South America • Completed scoping economic evaluations on field developments as well as pipeline and power plant projects in Venezuela, Trinidad, Argentina, Bolivia, and Chile. • Evaluated properties and prepared economic analyses for property acquisitions • Recommended transactions resulting in six acquisitions for $4.3MM and three divestitures worth of $70.1MM • Responsible for workovers, recompletions, and facility modifications in the Rocky Mountain and Mid-Continent regions • Accomplishments included ten new well completions, four recompletions, thirteen workovers, and six facility upgrades one of which resulted in a $10k/month savings by redesigning compressors Show less
-
-
-
Mobil Oil
-
Oil and Gas
-
700 & Above Employee
-
Operations Engineer
-
1987 - 1990
• Prepared workover and recompletion procedures which included unconsolidated oil fields, low permeability gas fields, and a fireflood EOR project • Monitored production for optimization opportunities • Introduced two new tubing connections as an alternative to corrosion treatments in sensitive gas wells • Implemented a fracture diagnostic testing program resulting in fewer screenouts and higher volume jobs. • Prepared workover and recompletion procedures which included unconsolidated oil fields, low permeability gas fields, and a fireflood EOR project • Monitored production for optimization opportunities • Introduced two new tubing connections as an alternative to corrosion treatments in sensitive gas wells • Implemented a fracture diagnostic testing program resulting in fewer screenouts and higher volume jobs.
-
-
Education
-
Texas A&M University
BS, Petroleum Engineering -
University of Houston
MS, Petroleum Engineering