Holli Cramm, P.E.

Vice President - Houston at Stokes and Spiehler
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Houston
Languages
  • Spanish Limited working proficiency
  • Arabic Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Registered Professional Engineer
    Texas Board of Professional Engineers and Land Surveyors

Experience

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Vice President - Houston
      • 1996 - Present

      Completion/Workover/Production Engineer • Prepare and supervise workover, completion, and abandonment programs for land, inland, and offshore operations • Recent projects include: • Prepared workover and abandonment procedures as well as production monitoring for 20 conventional gas wells in South Texas • Prepared workover and abandonment procedures for sour gas wells in East Texas • Managed project to modify and repair hurricane damaged production facilities in Texas state waters • Completed workover, completion, and stimulation program for 80 conventional gas wells in South Texas • Researched, prepared and certified over 200 P&A procedures in federal offshore waters • Completed and frac’d 15 wells in East Texas including over 25 fracs • Prepare field studies to identify workover candidates and optimization opportunities • Design HTHP completions • Provide production monitoring and regulatory compliance to a variety of clients Show less

    • Oil and Gas
    • 700 & Above Employee
    • Senior Evaluations Engineer
      • 1995 - 1996

      • Prepared reserve and economic evaluations for over twenty GOM properties targeted as prospective lease sale and farmin candidates. • Prepared pre-spud evaluations, conducted engineering partner meetings, coordinated inter-company functions, designed testing procedures, evaluated logs, prepared post drill evaluations, recommended completion procedures, and prepared development plans for six drilling prospects • Prepared year end reserve report on three new drilling prospects including reserve calculations, economics, field development scenarios and documentation. • Prepared economic and reserve evaluation of exploration prospects. Show less

    • Utilities
    • 200 - 300 Employee
    • Senior Engineer
      • 1993 - 1995

      • Principal engineer for seven operated and two non-operated platforms in the Western Gulf of Mexico representing 27% of company’s net production, 13% of current capital budget, and 76 BCFe of risked reserve drilling potential. • Responsible for production maintenance, field studies, budgeting, and recompletion/workover programs • Supervised consultants in the planning and execution of offshore projects including a new 10” pipeline, facility upgrades, and conductor guide additions to an existing braced caisson structure. • Principal Engineer for GOM 3-D exploration program. Responsible for evaluating prospects for lease sales and farmins • Completed nine evaluations resulting in five lease sale acquisitions and one farmin resulting in an exposure of $53MM with 145 BCFe risked reserve potential. • Coordinated collection of AFE approvals, permits, and shallow hazard surveys • Prepared reserve and economic evaluations of drilling prospects and exploration candidates • Assisted Planning Manager for company wide budget preparation and reporting • Served as Command Center Information Coordinator for Oil Spill Response Team Show less

    • Australia
    • Mining
    • 700 & Above Employee
    • Petroleum Engineer
      • 1990 - 1993

      • Evaluated international drilling prospects and prepared economic analyses • Assisted in the development of an entry strategy for the Southern Cone of South America • Completed scoping economic evaluations on field developments as well as pipeline and power plant projects in Venezuela, Trinidad, Argentina, Bolivia, and Chile. • Evaluated properties and prepared economic analyses for property acquisitions • Recommended transactions resulting in six acquisitions for $4.3MM and three divestitures worth of $70.1MM • Responsible for workovers, recompletions, and facility modifications in the Rocky Mountain and Mid-Continent regions • Accomplishments included ten new well completions, four recompletions, thirteen workovers, and six facility upgrades one of which resulted in a $10k/month savings by redesigning compressors Show less

    • Oil and Gas
    • 700 & Above Employee
    • Operations Engineer
      • 1987 - 1990

      • Prepared workover and recompletion procedures which included unconsolidated oil fields, low permeability gas fields, and a fireflood EOR project • Monitored production for optimization opportunities • Introduced two new tubing connections as an alternative to corrosion treatments in sensitive gas wells • Implemented a fracture diagnostic testing program resulting in fewer screenouts and higher volume jobs. • Prepared workover and recompletion procedures which included unconsolidated oil fields, low permeability gas fields, and a fireflood EOR project • Monitored production for optimization opportunities • Introduced two new tubing connections as an alternative to corrosion treatments in sensitive gas wells • Implemented a fracture diagnostic testing program resulting in fewer screenouts and higher volume jobs.

Education

  • Texas A&M University
    BS, Petroleum Engineering
    1983 - 1987
  • University of Houston
    MS, Petroleum Engineering
    1995 - 1997

Community

You need to have a working account to view this content. Click here to join now