Hocine Bouhenna

construction superintendent at JGC Construction International
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
DZ
Languages
  • English Full professional proficiency
  • French Native or bilingual proficiency
  • Arabic Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Jonathan Green

Very good supervisor with management skills that I would definitely her again anytime

John Ririe

Hocine and I worked together for KBR in Algeria; during this time I found him to skilled, enthusiastic and reliable. I would strongly recommend seeking him out for employment.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Singapore
    • Construction
    • 300 - 400 Employee
    • construction superintendent
      • May 2017 - Present

    • Singapore
    • Construction
    • 300 - 400 Employee
    • Piping supervisor
      • Aug 2013 - Feb 2017

      piping supervisor with JGC at IN-AMENAS compression gas project, client: SONATRACH-BP-Statoil Algeria. piping supervisor with JGC at IN-AMENAS compression gas project, client: SONATRACH-BP-Statoil Algeria.

    • United Arab Emirates
    • Construction
    • 700 & Above Employee
    • QA/QC WELDING PIPING INSPECTOR
      • Aug 2012 - Jun 2013

      •Monitor Welder performance and conduct visual inspections of welds and repairs of welds in accordance with Company procedures and international codes of practice. •Check, inspect and test incoming welding and construction materials to ensure they meet project specification requirements. •Monitor the construction process from all aspects to ensure performance meets job quality and design requirements in accordance with Company procedures and international standards. •Collate all relevant documentation for the job and apply the data to the creation of a Test Pack to undertake pre-hydro test inspection activity. •Undertake verification of welding machines to ensure equipment meets job requirements specification and provide verification of electrode baking and holding temperature including control and issue. •Conduct fit up and dimension inspections as per Inspection and Test Plan (ITP) and to provide technical guidance for welding sequence and distortion control. •Prepare all equipment punch lists and verify all items are in place and act as an agent for the Company during punch list activity. •Interface and coordinate with clients for production and QC matters and coordinate with third party inspection agencies for all related inspection activities. •Carryout inspection in the Shop floor and checking as per the Drawing and giving Clearance for welding, Mechanical Testing’s, Material hardness Testing of metals. Show less

    • United States
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Piping supervisor
      • Oct 2009 - Jun 2012

      •To ensure that all activities are performed in environmentally safe and responsible manner. •Supervising piping works to be performed by construction contractor and insure the compliance with established construction schedule, requirements and the applicable specification, standard. •Coordinate among various construction contractor and discipline supervisor executing piping work. •Verify the availability and adequacy of the material and drawing. •Ensure the quantity of the work executed by the construction contractor and monitor the compliance with established schedule. •Ensure the proper execution of inspection and test in accordance with the field quality control plan and monitor the adequacy result •Solve the cases of no-conformity. •Give assistance to piping superintendent in the discussion with the proponent representative and construction contractor where necessary. •Coordinate with the Safety Officer on safety related matters. Show less

    • Construction
    • 300 - 400 Employee
    • QA/QC MECHANICAL AND PIPING ENGINEER
      • Feb 2009 - Oct 2009

      •Control of drawings, isometrics and P&ID. •Followed mechanical assembly. •Followed welding. •Verify the availability and adequacy of the material and drawing •Control construction of the fixed roof tanks. •Follow-up and preparation of the all tests for tanks. •Preparation of the documents for hydrostatic, pneumatic test for piping and follow-up off the good progress of the tests. •Control and followed painting and coatings. •Control of drawings, isometrics and P&ID. •Followed mechanical assembly. •Followed welding. •Verify the availability and adequacy of the material and drawing •Control construction of the fixed roof tanks. •Follow-up and preparation of the all tests for tanks. •Preparation of the documents for hydrostatic, pneumatic test for piping and follow-up off the good progress of the tests. •Control and followed painting and coatings.

    • QA/QC PIPING AND WELDING ENGINEER
      • Aug 2007 - Feb 2009

      •Material Inspections. •controls diagrams and isometrics, specifications… etc •Supervising construction and the erection, NDT, as well as the hydrostatic tests and tires that is above and under-ground piping. •Preparation of the reports for the customer or the subcontractors. •Overhaul of documentation and the procedures. •Solve the cases of no-conformity •Material Inspections. •controls diagrams and isometrics, specifications… etc •Supervising construction and the erection, NDT, as well as the hydrostatic tests and tires that is above and under-ground piping. •Preparation of the reports for the customer or the subcontractors. •Overhaul of documentation and the procedures. •Solve the cases of no-conformity

Education

  • Faculté de Technologie-Université Skikda -Algérie
    Bachelor of Engineering Degree, Mechanical Engineering
    2000 - 2007

Community

You need to have a working account to view this content. Click here to join now