Hilman Muldani

Quality Assurance Quality Control Inspector at PGN Perkasa
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
West Java, Indonesia, ID
Languages
  • English -
  • Arabic -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • International Welding Inspector Personnel
    Balai Besar Bahan dan Barang Tambang (B4T) Bandung
    Mar, 2014
    - Nov, 2024

Experience

    • Indonesia
    • Retail Office Equipment
    • 1 - 100 Employee
    • Quality Assurance Quality Control Inspector
      • Aug 2019 - Present

      - Inspect All Material Mandatory Special Tools, Spare Part and consumable off-base or on-base before installation.- Inspect Painting thickness and visual, Rubber Lining, Adhesion Test and Insulation for All System.- Inspect FAT at Contractor Workshop before shipping to site and SAT after equipment arrived at site.- Inspect Work Inspection Request (WIR) according to Inspection Test Plan (ITP).- Inspect Pipe Bridge based on construction drawing and erection Pipe Bridge at the field.- Inspect Compressive Strength Test for 7, 14 and 28 days of concrete mix at site.- Inspect All Lifting Tools and Heavy Equipment before operational at site.- Inspect Horizontal Directional Drilling (HDD) Machine before operational at site. - Inspect Pilot Bore and Reaming before Pullback of pipeline in HDD activity.- Inspect Cathodic Protection and installation of Marker Post and Gas Stake.- Inspect Installation of Steel Sheet Pile for cut and connect of pipeline under 15 meters below the ground.- Monitoring welding activities before and during fabrication are performed as required by WPS.- Perform weld visual inspection before welding, decide weld “OK”. Also during and after welding process.- Review NDE report (Radiography Test, Penetrant Test, Magnetic Particle Test, Ultrasonic Test and PAUT).- Check and monitor portable electro-fusion and butt-fusion welding machine.- Inspect welding, visual welding and mechanical work related quality activities on in-process work of fabrication conformance with specification, procedure, standard and code.- Review Welding Visual Inspection report.- Review Test Package and Testing report.- Review Pipebook Before Lowering (PBL) and Pipebook Before Hydrotest (PBH).- Coordinate with team test package related testing (Hydro or Pneumatic Test).- Review All Related Daily QA /QC Report, Pre-Commisioning and Commisioning Report.- Coordinate with Main Contractor PT. PGAS Solution and Subcontractors at all particular projects.

    • Indonesia
    • Business Consulting and Services
    • 700 & Above Employee
    • Mechanical Supervisor
      • Feb 2018 - Jul 2019

      - Inspect All Material Mandatory Special Tools, Spare Part and consumable off-base or on-base before installation.- Inspect Painting thickness and visual, Rubber Lining, Adhesion Test and Insulation for All System.- Inspect Centerline, Elevation, Alignment and Tightening Bolt for All Equipment.- Inspect FAT at Contractor Workshop before shipping to site and SAT after equipment arrived at site.- Inspect PQR for WPS material Titanium Tube for Condenser.- Inspect HVAC and Fire Fighting System and monitor Packing Blow for All Piping System.- Inspect Request for Inspection (RFI) according to Inspection Test Plan (ITP).- Inspect for First Full Inspection (FFI) GT #1 and GT #2 PLTGU Jawa 2.- Monitoring welding activities before and during fabrication are performed as required by WPS.- Perform weld visual inspection before welding, decide weld “OK”. Also during and after welding process.- Review NDE report (Radiography Test, Penetrant Test, Magnetic Particle Test, Ultrasonic Test).- Monitor Preheat - Post Weld Heat Treatment (PWHT) and review Preheat - PWHT Chart.- Check WPS, weld map, welder / operator list which have been provided by welding foreman.- Inspect welding, visual welding and mechanical work related quality activities on in-process work of fabrication conformance with specification, procedure, standard and code.- Review Welding Visual Inspection report.- Review Test Package, Testing report and Equipment Completion Certificate (ECC).- Review Welding Historical Sheet (WHS).- Coordinate with team test package related testing (Hydro or Pneumatic Test).- Check all status Valve (close or open) as per boundary test package.- Conduct the walkdown before testing and close all punchlist item.- Review All Related Daily QA /QC Report, Pre-Commisioning and Commisioning Report.- Coordinate with Main Contractor PT. Mitsubishi Corporation – PT. Wasa Mitra Engineering and client PT. Perusahaan Listrik Negara.

    • QA/QC Inspector
      • May 2017 - Dec 2017

      - Monitoring welding activities before and during fabrication are performed.- Perform weld visual inspection before welding, decide weld “OK”. Also during and after welding process.- Check and monitor portable butt-fusion and electro-fusion welding machine.- Review All Related Daily QA /QC Report, Pre-Commisioning and Commisioning Report.- Monitor Pneumatic Test and review Pneumatic Test Report.- Check weld map, welder / operator list which have been provided by welding foreman.- Inspect welding, visual welding and mechanical work related quality activities on in-process work of fabrication conformance with specification, procedure, standard and code.- Coordinate with Main Contractor PT. Torindo Utama Sakti and client PT. Pertamina Gas.- Maintenance all document have been sign by all parties.

    • Indonesia
    • Retail Office Equipment
    • 1 - 100 Employee
    • QA/QC Inspector
      • May 2016 - Dec 2016

      - Monitoring all activities related to Construction and Pre-Commisioning of Gas Transmission Pipeline System at PGN Jargas Tarakan 2016.- Review all documents related to Construction and Pre-Commisioning of Gas Transmission Pipeline System at PGN Jargas Tarakan 2016.- Communication with Main Contractor PT. Adhi Karya (Persero) Tbk and Project Management Consultant PT. Petrotechindo Utama related with works. - Monitoring all activities related to Construction and Pre-Commisioning of Gas Transmission Pipeline System at PGN Jargas Tarakan 2016.- Review all documents related to Construction and Pre-Commisioning of Gas Transmission Pipeline System at PGN Jargas Tarakan 2016.- Communication with Main Contractor PT. Adhi Karya (Persero) Tbk and Project Management Consultant PT. Petrotechindo Utama related with works.

    • Indonesia
    • Engineering Services
    • 700 & Above Employee
    • QA/QC Inspector
      • Dec 2014 - Apr 2016

      - Monitoring welding activities before and during fabrication are performed as required by WPS.- Perform weld visual inspection before welding, decide weld “OK”. Also during and after welding process.- Check and monitor portable electrode oven (Quiver).- Review NDE report (Radiography Test, Penetrant Test, Magnetic Particle Test, Phased-Array Ultrasonic Test, Positive Material Identification Test, Hardness Test).- Monitor Post Weld Heat Treatment (PWHT) and review PWHT Chart.- Check WPS, weld map, welder / operator list which have been provided by welding foreman.- Check welding machine and welding parameter.- Inspect welding, visual welding and mechanical work related quality activities on in-process work of fabrication conformance with specification, procedure, standard and code.- Review welding visual inspection report.- Review test package and produce NDE request.- Review Welding Historical Record (WHR) and produce NDE clearance.- Coordinate with team test package related testing (Hydro or Pneumatic Test).- Coordinate with Construction regarding boundary test package.- Check all status Valve (close or open) as per boundary test package.- Conduct the walkdown before testing with client PT Exxon Mobil Cepu Limited and prepare punchlist item.- Close punchlist “A” category before testing.- Conduct the internal testing before official testing.- Communication with client PT Exxon Mobil Cepu Limited related with testing.- Monitoring status punchlist and follow up to close all punchlist item before handover.- Maintenance the document testing report and punchlist have been sign by all parties.

    • NDT MT PT Technician
      • Oct 2014 - Dec 2014

      - Prepare work procedure and component lifting gear unit. - Conduct visual inspection before magnetic particle inspection and penetrant testing.- Apply acceptance/rejection criteria as per code and standard used on PT and MPI testing result.- Generate inspection report required.- Communication with client PT CNOOC Limited related with testing. - Prepare work procedure and component lifting gear unit. - Conduct visual inspection before magnetic particle inspection and penetrant testing.- Apply acceptance/rejection criteria as per code and standard used on PT and MPI testing result.- Generate inspection report required.- Communication with client PT CNOOC Limited related with testing.

    • Structure Steel Engineer Drafter
      • Mar 2013 - Aug 2014

      Design & Drafting for Structural Steel Engineering Building such as Workshop, Refinery, Oil and Gas plant, Mosque, etc Design & Drafting for Structural Steel Engineering Building such as Workshop, Refinery, Oil and Gas plant, Mosque, etc

    • IT Support
      • Jan 2011 - Feb 2013

      Account Manager Account Manager

Education

  • Balai Besar Bahan dan Barang Tambang (B4T) Bandung
    International Welding Inspector Personnel (IWIP), Welding Inspector
    2014 - 2014
  • Balai Besar Bahan dan Barang Tambang (B4T) Bandung
    NDT RI Level II, Radiographic Interpreter
    2014 - 2014
  • Balai Besar Bahan dan Barang Tambang (B4T) Bandung
    NDT MT PT Level II, Magnetic Particle Testing and Liquid Penetrant Testing
    2014 - 2014
  • Multi Spec Sinergindo
    NDT UT Level II, Ultrasonic Testing
    2014 - 2014
  • Barron International
    T-BOSIET, Tropical Basic Offshore and Safety Induction Emergency Training
    2014 - 2014

Community

You need to have a working account to view this content. Click here to join now