Hilman Muldani
Quality Assurance Quality Control Inspector at PGN Perkasa- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
Arabic -
Topline Score
Bio
Credentials
-
International Welding Inspector Personnel
Balai Besar Bahan dan Barang Tambang (B4T) BandungMar, 2014- Nov, 2024
Experience
-
PGN Perkasa
-
Indonesia
-
Retail Office Equipment
-
1 - 100 Employee
-
Quality Assurance Quality Control Inspector
-
Aug 2019 - Present
- Inspect All Material Mandatory Special Tools, Spare Part and consumable off-base or on-base before installation.- Inspect Painting thickness and visual, Rubber Lining, Adhesion Test and Insulation for All System.- Inspect FAT at Contractor Workshop before shipping to site and SAT after equipment arrived at site.- Inspect Work Inspection Request (WIR) according to Inspection Test Plan (ITP).- Inspect Pipe Bridge based on construction drawing and erection Pipe Bridge at the field.- Inspect Compressive Strength Test for 7, 14 and 28 days of concrete mix at site.- Inspect All Lifting Tools and Heavy Equipment before operational at site.- Inspect Horizontal Directional Drilling (HDD) Machine before operational at site. - Inspect Pilot Bore and Reaming before Pullback of pipeline in HDD activity.- Inspect Cathodic Protection and installation of Marker Post and Gas Stake.- Inspect Installation of Steel Sheet Pile for cut and connect of pipeline under 15 meters below the ground.- Monitoring welding activities before and during fabrication are performed as required by WPS.- Perform weld visual inspection before welding, decide weld “OK”. Also during and after welding process.- Review NDE report (Radiography Test, Penetrant Test, Magnetic Particle Test, Ultrasonic Test and PAUT).- Check and monitor portable electro-fusion and butt-fusion welding machine.- Inspect welding, visual welding and mechanical work related quality activities on in-process work of fabrication conformance with specification, procedure, standard and code.- Review Welding Visual Inspection report.- Review Test Package and Testing report.- Review Pipebook Before Lowering (PBL) and Pipebook Before Hydrotest (PBH).- Coordinate with team test package related testing (Hydro or Pneumatic Test).- Review All Related Daily QA /QC Report, Pre-Commisioning and Commisioning Report.- Coordinate with Main Contractor PT. PGAS Solution and Subcontractors at all particular projects.
-
-
-
PT. SUCOFINDO
-
Indonesia
-
Business Consulting and Services
-
700 & Above Employee
-
Mechanical Supervisor
-
Feb 2018 - Jul 2019
- Inspect All Material Mandatory Special Tools, Spare Part and consumable off-base or on-base before installation.- Inspect Painting thickness and visual, Rubber Lining, Adhesion Test and Insulation for All System.- Inspect Centerline, Elevation, Alignment and Tightening Bolt for All Equipment.- Inspect FAT at Contractor Workshop before shipping to site and SAT after equipment arrived at site.- Inspect PQR for WPS material Titanium Tube for Condenser.- Inspect HVAC and Fire Fighting System and monitor Packing Blow for All Piping System.- Inspect Request for Inspection (RFI) according to Inspection Test Plan (ITP).- Inspect for First Full Inspection (FFI) GT #1 and GT #2 PLTGU Jawa 2.- Monitoring welding activities before and during fabrication are performed as required by WPS.- Perform weld visual inspection before welding, decide weld “OK”. Also during and after welding process.- Review NDE report (Radiography Test, Penetrant Test, Magnetic Particle Test, Ultrasonic Test).- Monitor Preheat - Post Weld Heat Treatment (PWHT) and review Preheat - PWHT Chart.- Check WPS, weld map, welder / operator list which have been provided by welding foreman.- Inspect welding, visual welding and mechanical work related quality activities on in-process work of fabrication conformance with specification, procedure, standard and code.- Review Welding Visual Inspection report.- Review Test Package, Testing report and Equipment Completion Certificate (ECC).- Review Welding Historical Sheet (WHS).- Coordinate with team test package related testing (Hydro or Pneumatic Test).- Check all status Valve (close or open) as per boundary test package.- Conduct the walkdown before testing and close all punchlist item.- Review All Related Daily QA /QC Report, Pre-Commisioning and Commisioning Report.- Coordinate with Main Contractor PT. Mitsubishi Corporation – PT. Wasa Mitra Engineering and client PT. Perusahaan Listrik Negara.
-
-
-
-
QA/QC Inspector
-
May 2017 - Dec 2017
- Monitoring welding activities before and during fabrication are performed.- Perform weld visual inspection before welding, decide weld “OK”. Also during and after welding process.- Check and monitor portable butt-fusion and electro-fusion welding machine.- Review All Related Daily QA /QC Report, Pre-Commisioning and Commisioning Report.- Monitor Pneumatic Test and review Pneumatic Test Report.- Check weld map, welder / operator list which have been provided by welding foreman.- Inspect welding, visual welding and mechanical work related quality activities on in-process work of fabrication conformance with specification, procedure, standard and code.- Coordinate with Main Contractor PT. Torindo Utama Sakti and client PT. Pertamina Gas.- Maintenance all document have been sign by all parties.
-
-
-
PGN Perkasa
-
Indonesia
-
Retail Office Equipment
-
1 - 100 Employee
-
QA/QC Inspector
-
May 2016 - Dec 2016
- Monitoring all activities related to Construction and Pre-Commisioning of Gas Transmission Pipeline System at PGN Jargas Tarakan 2016.- Review all documents related to Construction and Pre-Commisioning of Gas Transmission Pipeline System at PGN Jargas Tarakan 2016.- Communication with Main Contractor PT. Adhi Karya (Persero) Tbk and Project Management Consultant PT. Petrotechindo Utama related with works. - Monitoring all activities related to Construction and Pre-Commisioning of Gas Transmission Pipeline System at PGN Jargas Tarakan 2016.- Review all documents related to Construction and Pre-Commisioning of Gas Transmission Pipeline System at PGN Jargas Tarakan 2016.- Communication with Main Contractor PT. Adhi Karya (Persero) Tbk and Project Management Consultant PT. Petrotechindo Utama related with works.
-
-
-
TRIPATRA
-
Indonesia
-
Engineering Services
-
700 & Above Employee
-
QA/QC Inspector
-
Dec 2014 - Apr 2016
- Monitoring welding activities before and during fabrication are performed as required by WPS.- Perform weld visual inspection before welding, decide weld “OK”. Also during and after welding process.- Check and monitor portable electrode oven (Quiver).- Review NDE report (Radiography Test, Penetrant Test, Magnetic Particle Test, Phased-Array Ultrasonic Test, Positive Material Identification Test, Hardness Test).- Monitor Post Weld Heat Treatment (PWHT) and review PWHT Chart.- Check WPS, weld map, welder / operator list which have been provided by welding foreman.- Check welding machine and welding parameter.- Inspect welding, visual welding and mechanical work related quality activities on in-process work of fabrication conformance with specification, procedure, standard and code.- Review welding visual inspection report.- Review test package and produce NDE request.- Review Welding Historical Record (WHR) and produce NDE clearance.- Coordinate with team test package related testing (Hydro or Pneumatic Test).- Coordinate with Construction regarding boundary test package.- Check all status Valve (close or open) as per boundary test package.- Conduct the walkdown before testing with client PT Exxon Mobil Cepu Limited and prepare punchlist item.- Close punchlist “A” category before testing.- Conduct the internal testing before official testing.- Communication with client PT Exxon Mobil Cepu Limited related with testing.- Monitoring status punchlist and follow up to close all punchlist item before handover.- Maintenance the document testing report and punchlist have been sign by all parties.
-
-
-
-
NDT MT PT Technician
-
Oct 2014 - Dec 2014
- Prepare work procedure and component lifting gear unit. - Conduct visual inspection before magnetic particle inspection and penetrant testing.- Apply acceptance/rejection criteria as per code and standard used on PT and MPI testing result.- Generate inspection report required.- Communication with client PT CNOOC Limited related with testing. - Prepare work procedure and component lifting gear unit. - Conduct visual inspection before magnetic particle inspection and penetrant testing.- Apply acceptance/rejection criteria as per code and standard used on PT and MPI testing result.- Generate inspection report required.- Communication with client PT CNOOC Limited related with testing.
-
-
-
-
Structure Steel Engineer Drafter
-
Mar 2013 - Aug 2014
Design & Drafting for Structural Steel Engineering Building such as Workshop, Refinery, Oil and Gas plant, Mosque, etc Design & Drafting for Structural Steel Engineering Building such as Workshop, Refinery, Oil and Gas plant, Mosque, etc
-
-
-
-
IT Support
-
Jan 2011 - Feb 2013
Account Manager Account Manager
-
-
Education
-
Balai Besar Bahan dan Barang Tambang (B4T) Bandung
International Welding Inspector Personnel (IWIP), Welding Inspector -
Balai Besar Bahan dan Barang Tambang (B4T) Bandung
NDT RI Level II, Radiographic Interpreter -
Balai Besar Bahan dan Barang Tambang (B4T) Bandung
NDT MT PT Level II, Magnetic Particle Testing and Liquid Penetrant Testing -
Multi Spec Sinergindo
NDT UT Level II, Ultrasonic Testing -
Barron International
T-BOSIET, Tropical Basic Offshore and Safety Induction Emergency Training