Hien Lang Wong
Project Engineer at PrimusTech Pte Ltd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
Mandarin -
-
Malay -
-
Cantonese -
Topline Score
Bio
Experience
-
PrimusTech Pte Ltd
-
Singapore
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Project Engineer
-
Nov 2018 - Present
Responsibilities : -To design external and internal arrangement components of control panel and operation panel based on the system requirement -To design motor circuit, control circuit and power circuit, I/O circuit and communication circuit based on the process control system -Testing and commissioning the PLC control system of the ACMV system -To lead and manage the team for the site works Experience gained : -Knowledge about PLC programming and control system -On site troubleshooting and modification of control circuitry Achievements : - Complete design total 300 panel for ACMV system for maintenance operation building, liquid module 1 & 2, solid, IPS and digester for the project at Changi Water Reclaimation Plant
-
-
-
Automatic Controls and Instrumentation Pte Ltd
-
Automation Machinery Manufacturing
-
1 - 100 Employee
-
Project Engineer
-
Feb 2014 - Jul 2018
Responsibilities : -To design external and internal arrangement components of control panel and operation panel based on the system requirement -To design motor circuit, control circuit and power circuit, I/O circuit and communication circuit based on the process control system -To do continuity check about the connection of the electrical circuit for the panel -Testing and commissioning the PLC control system of the water treatment process -To lead and manage the team for the site works Experience gained : -Knowledge about PLC programming and control system -On-site troubleshooting and modification of control circuitry Achievements : - Testing and commissioning the clarifier system and lime preparation system at Johor River Waterworks (2014 – 2016) -Testing and commissioning for the upgrade of automation process system at Ulu Pandan Water Reclamation Plant (2016 – 2018) -Installation and commissioning of instrument analyzer at Tekong Island (2018)
-
-
-
-
Project Engineer
-
Apr 2013 - Feb 2014
Responsibilities: -To design external and internal arrangement components of control panel and operation panel based on the system requirement -To design motor circuit, control circuit and power circuit, I/O circuit and communication circuit based on the process control system -To do continuity check about the connection of the electrical circuit for the panel -Testing and commissioning the sterilizer control system and back pressure receiver (BPR) control system -To prepare the operation manual for the project Experience gained : -Knowledge about the operation and process of the sterilizer and BPR control system
-
-
-
Cheng Hua Engineering Works Sdn. Bhd.
-
Malaysia
-
Automation Machinery Manufacturing
-
100 - 200 Employee
-
Hardware Engineer
-
Mar 2011 - Jan 2013
Responsibilities : -To design external and internal arrangement components of control panel and operation panel based on the system requirement -To design motor circuit, control circuit and power circuit, I/O circuit and communication circuit based on the control zone of conveyor system -To select suitable parts and component according the system requirement -To prepare approval drawing and electrical specification for the project -To do continuity check about the connection of the electrical circuit for the panel -To prepare BOM of the project and issue drawing Experience gained : -Knowledge to design the panel and electrical circuit for the conveyor system
-
-
-
-
Project Engineer
-
Jan 2010 - Nov 2010
Responsibilities : -To monitoring and arrange the sub-con working according the project schedule -To prepare the pump testing forms and documents to the consultant for the project -To do witness testing with client and consultant for the project Experience gained : -Knowledge about the operation and the process flow of raw water treatment plant -Knowledge about the water pump system and instrument used in water treatment plant Achievements : -Testing, commissioning and hand over the new water treatment plant (chemical plant & chlorine plant), Padang Terap (Kedah) to client
-
-
-
-
Industrial Trainee
-
Dec 2007 - Apr 2008
-Learned basic knowledge of glove process flow and control system -Gained basic knowledge about pneumatic valve, cylinder and sensor -Project participated: - energy saving project which is to reduce the usage of the steam for dryer (Industrial Training) -Learned basic knowledge of glove process flow and control system -Gained basic knowledge about pneumatic valve, cylinder and sensor -Project participated: - energy saving project which is to reduce the usage of the steam for dryer (Industrial Training)
-
-
Education
-
Universiti Teknikal Malaysia Melaka
Bachelor of Mechatronic Engineering with Honours