Hery Purwanto
WTP & ETP at PT. Phoenix Resources International- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
PT Phoenix Resources International
-
Indonesia
-
Manufacturing
-
100 - 200 Employee
-
WTP & ETP
-
Nov 2022 - Present
WTP Cap 37500 M3/Day with System Intake Sea Water, DAF, MMF, SWRO, BWRO, Demin Water. ETP Cap 25000 M3/Day with system Anaerobic & Aerobic. WTP Cap 37500 M3/Day with System Intake Sea Water, DAF, MMF, SWRO, BWRO, Demin Water. ETP Cap 25000 M3/Day with system Anaerobic & Aerobic.
-
-
-
Pt Lautan Organo water
-
jakarta
-
Project Engineer
-
Feb 2015 - Oct 2022
-WWTP project PT JFE Galvanizing.Cibitung -WTP Project Cap 1500 M3/day PT Semen Gersik. Rembang -RO 2nd Water Mass Balance Project cap 53,05 M3/day PT Rohto Laboratories Indonesia. Bandung -SWRO Project Cap 3500 M3/day LNG Tangguh Expantion train 3 Project, LNG Tangguh Papua Barat. -Automatic Filtration/Amiad project Cap 1500 M3/day PT Surya Cipta. Karawang Timur -WTP & WWTP, PT Takasago International -SWRO cap 3000 M3/day & BWRO 2500 M3/day Tangguh Expantion project trian 3… Show more -WWTP project PT JFE Galvanizing.Cibitung -WTP Project Cap 1500 M3/day PT Semen Gersik. Rembang -RO 2nd Water Mass Balance Project cap 53,05 M3/day PT Rohto Laboratories Indonesia. Bandung -SWRO Project Cap 3500 M3/day LNG Tangguh Expantion train 3 Project, LNG Tangguh Papua Barat. -Automatic Filtration/Amiad project Cap 1500 M3/day PT Surya Cipta. Karawang Timur -WTP & WWTP, PT Takasago International -SWRO cap 3000 M3/day & BWRO 2500 M3/day Tangguh Expantion project trian 3, LNG Tangguh. papua Show less -WWTP project PT JFE Galvanizing.Cibitung -WTP Project Cap 1500 M3/day PT Semen Gersik. Rembang -RO 2nd Water Mass Balance Project cap 53,05 M3/day PT Rohto Laboratories Indonesia. Bandung -SWRO Project Cap 3500 M3/day LNG Tangguh Expantion train 3 Project, LNG Tangguh Papua Barat. -Automatic Filtration/Amiad project Cap 1500 M3/day PT Surya Cipta. Karawang Timur -WTP & WWTP, PT Takasago International -SWRO cap 3000 M3/day & BWRO 2500 M3/day Tangguh Expantion project trian 3… Show more -WWTP project PT JFE Galvanizing.Cibitung -WTP Project Cap 1500 M3/day PT Semen Gersik. Rembang -RO 2nd Water Mass Balance Project cap 53,05 M3/day PT Rohto Laboratories Indonesia. Bandung -SWRO Project Cap 3500 M3/day LNG Tangguh Expantion train 3 Project, LNG Tangguh Papua Barat. -Automatic Filtration/Amiad project Cap 1500 M3/day PT Surya Cipta. Karawang Timur -WTP & WWTP, PT Takasago International -SWRO cap 3000 M3/day & BWRO 2500 M3/day Tangguh Expantion project trian 3, LNG Tangguh. papua Show less
-
-
-
PT. PROXI META SOLUSI (PROMES)
-
Indonesia
-
Business Consulting and Services
-
1 - 100 Employee
-
mechanical & piping engineer
-
Aug 2014 - Feb 2015
Project pipeline & offtake from Kapodang to Indonesia power semarang. Project pipeline & offtake from Kapodang to Indonesia power semarang.
-
-
-
PT SAAG UTAMA
-
Greater Jakarta Area, Indonesia
-
Project Engineer
-
May 2013 - Aug 2014
RENTAL GAS COMPRESSOR AJAX, Project : Pertamina EP asset 3 Pertamina Pondok Makmur RENTAL GAS COMPRESSOR AJAX, Project : Pertamina EP asset 3 Pertamina Pondok Makmur
-
-
-
Lenzing Group
-
Austria
-
Chemical Manufacturing
-
700 & Above Employee
-
Supervisor Engineering Mechanical
-
May 2012 - May 2013
-
-
-
Freeport Indonesia
-
Indonesia
-
Mining
-
700 & Above Employee
-
Field Engineering Mechanical
-
Apr 2011 - May 2012
Dept Central Service Engineering Highland & LowLand -Common Infrastructure Project : CIP Building Plaza OB#3, GBC Lower Drainage, New Mix Batching Plant, CIP Rail Yard Surface Distribution Utilities, CIP Pipe Line & Power Line Relocation Pipes Relocation -Underground Expantion project :DMLZ Compressor, DMLZ fan#2, GBC Compressor, GBC Batch plant. Jobs Des : • Review engineering drawing and prepared As-Built drawing after installation is complated. • Coordination with… Show more Dept Central Service Engineering Highland & LowLand -Common Infrastructure Project : CIP Building Plaza OB#3, GBC Lower Drainage, New Mix Batching Plant, CIP Rail Yard Surface Distribution Utilities, CIP Pipe Line & Power Line Relocation Pipes Relocation -Underground Expantion project :DMLZ Compressor, DMLZ fan#2, GBC Compressor, GBC Batch plant. Jobs Des : • Review engineering drawing and prepared As-Built drawing after installation is complated. • Coordination with construction, Client, QA/QC, Engineering, Project Control and maintenance team to finalizes of headache/problem. • Coordinate to prepare sketch drawing of mechanical & piping design (if any). • Check MTO and prepare additioanal material of mechanical & piping as per design (if any). • Makes decision to finalizes of problem at field based on design, actual field condition, standard and code of mechanical & piping. • Close communication with client. Show less Dept Central Service Engineering Highland & LowLand -Common Infrastructure Project : CIP Building Plaza OB#3, GBC Lower Drainage, New Mix Batching Plant, CIP Rail Yard Surface Distribution Utilities, CIP Pipe Line & Power Line Relocation Pipes Relocation -Underground Expantion project :DMLZ Compressor, DMLZ fan#2, GBC Compressor, GBC Batch plant. Jobs Des : • Review engineering drawing and prepared As-Built drawing after installation is complated. • Coordination with… Show more Dept Central Service Engineering Highland & LowLand -Common Infrastructure Project : CIP Building Plaza OB#3, GBC Lower Drainage, New Mix Batching Plant, CIP Rail Yard Surface Distribution Utilities, CIP Pipe Line & Power Line Relocation Pipes Relocation -Underground Expantion project :DMLZ Compressor, DMLZ fan#2, GBC Compressor, GBC Batch plant. Jobs Des : • Review engineering drawing and prepared As-Built drawing after installation is complated. • Coordination with construction, Client, QA/QC, Engineering, Project Control and maintenance team to finalizes of headache/problem. • Coordinate to prepare sketch drawing of mechanical & piping design (if any). • Check MTO and prepare additioanal material of mechanical & piping as per design (if any). • Makes decision to finalizes of problem at field based on design, actual field condition, standard and code of mechanical & piping. • Close communication with client. Show less
-
-
-
PT. POESER Indonesia
-
Indonesia
-
Oil and Gas
-
1 - 100 Employee
-
Mechanical Engineering
-
Dec 2009 - Mar 2011
Project PLTU 2 NTT - Kupang, 2 x 16.5 MW Power Plant Jobs des : • Site inspection for compliance with contract document, approved submittals and mechanical codes. • Reporting contruction progress of the project for weekly and monthly prior to invoice PLN and certificate progress payment • Review sub contractor invoice • Review sub contractor daily, weekly and monthly report • Participate in contruction progress meeting with owner and consultan • Participate in final… Show more Project PLTU 2 NTT - Kupang, 2 x 16.5 MW Power Plant Jobs des : • Site inspection for compliance with contract document, approved submittals and mechanical codes. • Reporting contruction progress of the project for weekly and monthly prior to invoice PLN and certificate progress payment • Review sub contractor invoice • Review sub contractor daily, weekly and monthly report • Participate in contruction progress meeting with owner and consultan • Participate in final inspection and prepare punch list • Monitoring us build drawing • Evaluate contruction material testing result Show less Project PLTU 2 NTT - Kupang, 2 x 16.5 MW Power Plant Jobs des : • Site inspection for compliance with contract document, approved submittals and mechanical codes. • Reporting contruction progress of the project for weekly and monthly prior to invoice PLN and certificate progress payment • Review sub contractor invoice • Review sub contractor daily, weekly and monthly report • Participate in contruction progress meeting with owner and consultan • Participate in final… Show more Project PLTU 2 NTT - Kupang, 2 x 16.5 MW Power Plant Jobs des : • Site inspection for compliance with contract document, approved submittals and mechanical codes. • Reporting contruction progress of the project for weekly and monthly prior to invoice PLN and certificate progress payment • Review sub contractor invoice • Review sub contractor daily, weekly and monthly report • Participate in contruction progress meeting with owner and consultan • Participate in final inspection and prepare punch list • Monitoring us build drawing • Evaluate contruction material testing result Show less
-
-
-
Mohammad Al Mojil Group
-
Construction
-
400 - 500 Employee
-
QC Piping/Welding III
-
Jul 2008 - Jul 2009
Khurais Krude Kontract (KCC) PROJECT, SAIPEM-SNAMPROGETTI, SAUDI ARAMCO Jobs Des : • Pipe laying, p ipe spool erection and assembly (doubejointing on piperacklsleeperway) • Piping flange joint inspections (including insulation flanges) • Treaded connections inspection • Ventury, flow orifice plate & restriction orifice installation • Piping system internal cleaniness verification • Valve installation inspection • Pipe support and anchoring • Witness internal… Show more Khurais Krude Kontract (KCC) PROJECT, SAIPEM-SNAMPROGETTI, SAUDI ARAMCO Jobs Des : • Pipe laying, p ipe spool erection and assembly (doubejointing on piperacklsleeperway) • Piping flange joint inspections (including insulation flanges) • Treaded connections inspection • Ventury, flow orifice plate & restriction orifice installation • Piping system internal cleaniness verification • Valve installation inspection • Pipe support and anchoring • Witness internal cleaning • Witness hydrostatic & pneumatic test for pip eline & Valve • Kill punch list • Re-instatement inspection As Piping Inspector : • Checking piping activities as per piping isomeric, arrangements, etc • Checking activities as per ARAMCO STANDARDS • Checking fit-ups and identifying proper alignments • Inspecting piping and piping fitting as per clients QCP • Preparing inspection reports • Witnessing the activity with client • Review of test package preparation • Inernal cleanliness and/or flushing • Verification of testing equipment • Visual inspection at test pressure • De-pressurization & water disposal • Lay-up inspection • Maching the work standard with respect to client standard • Ratsing internal RFI to the client • Helping construction with high standard work quality procedure. Show less Khurais Krude Kontract (KCC) PROJECT, SAIPEM-SNAMPROGETTI, SAUDI ARAMCO Jobs Des : • Pipe laying, p ipe spool erection and assembly (doubejointing on piperacklsleeperway) • Piping flange joint inspections (including insulation flanges) • Treaded connections inspection • Ventury, flow orifice plate & restriction orifice installation • Piping system internal cleaniness verification • Valve installation inspection • Pipe support and anchoring • Witness internal… Show more Khurais Krude Kontract (KCC) PROJECT, SAIPEM-SNAMPROGETTI, SAUDI ARAMCO Jobs Des : • Pipe laying, p ipe spool erection and assembly (doubejointing on piperacklsleeperway) • Piping flange joint inspections (including insulation flanges) • Treaded connections inspection • Ventury, flow orifice plate & restriction orifice installation • Piping system internal cleaniness verification • Valve installation inspection • Pipe support and anchoring • Witness internal cleaning • Witness hydrostatic & pneumatic test for pip eline & Valve • Kill punch list • Re-instatement inspection As Piping Inspector : • Checking piping activities as per piping isomeric, arrangements, etc • Checking activities as per ARAMCO STANDARDS • Checking fit-ups and identifying proper alignments • Inspecting piping and piping fitting as per clients QCP • Preparing inspection reports • Witnessing the activity with client • Review of test package preparation • Inernal cleanliness and/or flushing • Verification of testing equipment • Visual inspection at test pressure • De-pressurization & water disposal • Lay-up inspection • Maching the work standard with respect to client standard • Ratsing internal RFI to the client • Helping construction with high standard work quality procedure. Show less
-
-
-
PT. Epiterma Mas Indonesia
-
cikarang, jawa barat
-
QC ENGINEERING PIPING & STRUCTURE / Staff Cheker.
-
May 2007 - Jul 2008
First Quantum Minerals Kansanshi Upgrade Project, Flour Australia PTY LTD, Zambia. Simberi Gold Project, Intermet Engineering, Papuanugini.Toka Tindung Gold Projact, Proteus Engineer, North Sulawesi, Indonesia. Kolwezi Mineral Tailing Project, First Quantum Minerals LTD, Kolwezi. Guelb Moghrein Project-Gold Project, Intermet Engineering, Maurtanian. Kansanshi Pressure leach Project, GRDminproc, Zambia Jobs Des : Prepare design Drawing. Prepare shop Drawing. Evaluate… Show more First Quantum Minerals Kansanshi Upgrade Project, Flour Australia PTY LTD, Zambia. Simberi Gold Project, Intermet Engineering, Papuanugini.Toka Tindung Gold Projact, Proteus Engineer, North Sulawesi, Indonesia. Kolwezi Mineral Tailing Project, First Quantum Minerals LTD, Kolwezi. Guelb Moghrein Project-Gold Project, Intermet Engineering, Maurtanian. Kansanshi Pressure leach Project, GRDminproc, Zambia Jobs Des : Prepare design Drawing. Prepare shop Drawing. Evaluate project progress. Prepare materials for Fabrications. As Staff QC ENGINEERING PIPING & STRUCTURE: • Check file drawing approval or design drawing complete or not, make sure to complete it, make question if really not exist to project administrator. • Chek to make sure for completely/clearly and informative of shop drawing files and match the complete of shop drawing with assembly part list. Don’t any drawing left. • Discuss or confirm all corespondens files with project administrator. Complete the information for design drawing. • Cek material with erection drawing based of material or section which in approval or design drawing and chek the existing materials in local market. • Chek erection based of design drawing /approval in isometrick view with 2 drafter like:elevation in each floor, elevation in each column, elevation in baseplate,space 2-column each grid line, slope of beam/rafter/column clash cek all structure using tekla facility. • Cek global for the easier of material installation on site, like : The easier of transportation, the easier of sequence material installation, and easier of welding in site or workshop. • Chek cutting or part drawing, erection drawing, design drawing, bill of material, delivery list. • Checking item : space of holes or coordinate holes, diameter holes, watch the tolerance, easily of making slot (2d+1), quantity of holes, thickness of plate, grade of materials. Show less First Quantum Minerals Kansanshi Upgrade Project, Flour Australia PTY LTD, Zambia. Simberi Gold Project, Intermet Engineering, Papuanugini.Toka Tindung Gold Projact, Proteus Engineer, North Sulawesi, Indonesia. Kolwezi Mineral Tailing Project, First Quantum Minerals LTD, Kolwezi. Guelb Moghrein Project-Gold Project, Intermet Engineering, Maurtanian. Kansanshi Pressure leach Project, GRDminproc, Zambia Jobs Des : Prepare design Drawing. Prepare shop Drawing. Evaluate… Show more First Quantum Minerals Kansanshi Upgrade Project, Flour Australia PTY LTD, Zambia. Simberi Gold Project, Intermet Engineering, Papuanugini.Toka Tindung Gold Projact, Proteus Engineer, North Sulawesi, Indonesia. Kolwezi Mineral Tailing Project, First Quantum Minerals LTD, Kolwezi. Guelb Moghrein Project-Gold Project, Intermet Engineering, Maurtanian. Kansanshi Pressure leach Project, GRDminproc, Zambia Jobs Des : Prepare design Drawing. Prepare shop Drawing. Evaluate project progress. Prepare materials for Fabrications. As Staff QC ENGINEERING PIPING & STRUCTURE: • Check file drawing approval or design drawing complete or not, make sure to complete it, make question if really not exist to project administrator. • Chek to make sure for completely/clearly and informative of shop drawing files and match the complete of shop drawing with assembly part list. Don’t any drawing left. • Discuss or confirm all corespondens files with project administrator. Complete the information for design drawing. • Cek material with erection drawing based of material or section which in approval or design drawing and chek the existing materials in local market. • Chek erection based of design drawing /approval in isometrick view with 2 drafter like:elevation in each floor, elevation in each column, elevation in baseplate,space 2-column each grid line, slope of beam/rafter/column clash cek all structure using tekla facility. • Cek global for the easier of material installation on site, like : The easier of transportation, the easier of sequence material installation, and easier of welding in site or workshop. • Chek cutting or part drawing, erection drawing, design drawing, bill of material, delivery list. • Checking item : space of holes or coordinate holes, diameter holes, watch the tolerance, easily of making slot (2d+1), quantity of holes, thickness of plate, grade of materials. Show less
-
-
-
PT. FAJAR MAS MURNI BALIKPAPAN
-
Indonesia
-
Retail Office Equipment
-
100 - 200 Employee
-
Mechanical Engineering
-
Oct 2004 - Feb 2007
PSA NITROGEN PLANT PROJECT, AIR PRODUCT, KALTIM DAYA MANDIRI (KDM) Jobs Des : Prepare Procedure of Inspection and certification. Prepare documents for project tender. Evaluate project progress. Include to: • Review Inspection and Test Plan. • Inspection and Verification Materials. • Witness Welding activities. • Review Daily-welding reports. • Review and Interpreted RT films. • Monitoring Construction activities such as Trenching, Stringing of… Show more PSA NITROGEN PLANT PROJECT, AIR PRODUCT, KALTIM DAYA MANDIRI (KDM) Jobs Des : Prepare Procedure of Inspection and certification. Prepare documents for project tender. Evaluate project progress. Include to: • Review Inspection and Test Plan. • Inspection and Verification Materials. • Witness Welding activities. • Review Daily-welding reports. • Review and Interpreted RT films. • Monitoring Construction activities such as Trenching, Stringing of line pipes, Tie in activities, Pipes Laying /Lowering in, etc. • Monitoring trenching before lowering to achieve good condition • Witness hydrostatic test for pipeline & Valve • Witness Blowing test for pipeline • Paper Works: Site Memo, Organize of Document Control Report, etc. • Review Documents for Certification of Worthiness Combine Facilities such as Safety, environments,installation of equipments, piping, pre-commissioning, start up and etc. • Monitoring pre-commissioning / commissioning and start up activities. As Piping Engineering: • Performed Material Receiving Inspection, verify and review Mill Certificate • Pipe Fabrication for GAS PLAN as per ANSI B31.1 • Inspection all welding process at various material and Electrode during construction of piping structure workper ASME/ ANSI B.31.1 • Inspection spool pipe Fit Up fabrication ( Dimension, Leveling, Beveling, Gap, Drawing ) • Verify WPS and Welder Qualification • Line check • Punch list • Punch kill • Prepare and reviewed test package • Witness and organize Hydrostatic test for piping system Show less PSA NITROGEN PLANT PROJECT, AIR PRODUCT, KALTIM DAYA MANDIRI (KDM) Jobs Des : Prepare Procedure of Inspection and certification. Prepare documents for project tender. Evaluate project progress. Include to: • Review Inspection and Test Plan. • Inspection and Verification Materials. • Witness Welding activities. • Review Daily-welding reports. • Review and Interpreted RT films. • Monitoring Construction activities such as Trenching, Stringing of… Show more PSA NITROGEN PLANT PROJECT, AIR PRODUCT, KALTIM DAYA MANDIRI (KDM) Jobs Des : Prepare Procedure of Inspection and certification. Prepare documents for project tender. Evaluate project progress. Include to: • Review Inspection and Test Plan. • Inspection and Verification Materials. • Witness Welding activities. • Review Daily-welding reports. • Review and Interpreted RT films. • Monitoring Construction activities such as Trenching, Stringing of line pipes, Tie in activities, Pipes Laying /Lowering in, etc. • Monitoring trenching before lowering to achieve good condition • Witness hydrostatic test for pipeline & Valve • Witness Blowing test for pipeline • Paper Works: Site Memo, Organize of Document Control Report, etc. • Review Documents for Certification of Worthiness Combine Facilities such as Safety, environments,installation of equipments, piping, pre-commissioning, start up and etc. • Monitoring pre-commissioning / commissioning and start up activities. As Piping Engineering: • Performed Material Receiving Inspection, verify and review Mill Certificate • Pipe Fabrication for GAS PLAN as per ANSI B31.1 • Inspection all welding process at various material and Electrode during construction of piping structure workper ASME/ ANSI B.31.1 • Inspection spool pipe Fit Up fabrication ( Dimension, Leveling, Beveling, Gap, Drawing ) • Verify WPS and Welder Qualification • Line check • Punch list • Punch kill • Prepare and reviewed test package • Witness and organize Hydrostatic test for piping system Show less
-
-
Education
-
Universitas Gunadarma
bachelor, Mechanical Engineering