Henry Woltag

Director Of Development at ConnectGEN LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Houston, Texas, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Renewable Energy Power Generation
    • 1 - 100 Employee
    • Director Of Development
      • Jan 2021 - Present

    • Manager
      • Dec 2018 - Dec 2020

    • Spain
    • Renewable Energy Power Generation
    • 700 & Above Employee
    • Development Project Manager II
      • Apr 2017 - Dec 2018

      Managed EDPR's portfolio of ERCOT wind projects, overseeing site evaluation, greenfield development, land acquisition, interconnection study and LGIA negotiations, Chapter 312/313 Tax Abatement negotiations, Road Use Agreement negotiations, and late-stage pre-construction development activities for multiple projects including the now operational Los Mirasoles Wind Farm (250 MW), Los Mirasoles II Wind Farm (50MW), Reloj del Sol Wind Farm (209 MW), and Wildcat Creek Wind Farm (180 MW). In… Show more Managed EDPR's portfolio of ERCOT wind projects, overseeing site evaluation, greenfield development, land acquisition, interconnection study and LGIA negotiations, Chapter 312/313 Tax Abatement negotiations, Road Use Agreement negotiations, and late-stage pre-construction development activities for multiple projects including the now operational Los Mirasoles Wind Farm (250 MW), Los Mirasoles II Wind Farm (50MW), Reloj del Sol Wind Farm (209 MW), and Wildcat Creek Wind Farm (180 MW). In addition to the ERCOT portfolio, managed the late-stage development of the now-operational Turtle Creek Wind Farm (200 MW) in Mitchell County, Iowa, including negotiation of 15 miles of gen-tie easements, perfecting lease rights, and successfully obtaining county entitlements.

    • Development Project Manager
      • Apr 2015 - Apr 2017

      Houston, Texas Area

    • Project Developer
      • Sep 2013 - Apr 2015

    • United States
    • Food and Beverage Services
    • 1 - 100 Employee
    • Continuous Improvement Engineer
      • May 2012 - Sep 2012

      Automated the supervisor safety report collection process for the entire brewery using Google Forms. Created an excel based grading tool that organized information and calculated proactive safety metrics based on safety reports. Conducted a comprehensive time study to compare budgeted labor standard and actual labor required for keg filling operations. Created an excel based scheduling tool for utilization of Draft Center management to improve allocation of labor.

    • United States
    • Medical Equipment Manufacturing
    • 700 & Above Employee
    • Continuous Improvement Engineer
      • Mar 2012 - May 2012

      Identified SOP gaps and developed detailed process flowcharts for all packaging machines to be used for employee training. Created a process flowchart of Campaign Production Orders to identify redundancies and areas of improvement.

    • United States
    • Biotechnology Research
    • 700 & Above Employee
    • Industrial Engineering Co-op
      • Nov 2011 - Mar 2012

      Performed time studies on 83 production processes to suggest productivity, efficiency and labor utilization improvements. Created Operator Standard Work Documents from each time study. Designed ten ergonomically acceptable part presentation / material handling devices for operator utilization.

    • United States
    • Medical Equipment Manufacturing
    • 700 & Above Employee
    • Continuous Improvement Engineer
      • Mar 2011 - Sep 2011

      Acted as project manager for the evaluating, reorganizing, and implementation of an improved pick-to-light rack system that reduced emergency replenishments by 56%. Accountable for gathering monthly data from each department, calculating facility metrics, and creating town hall presentations. Analyzed order data to assess bulk order management strategies and presented findings to upper management. Identified flow of cardboard waste and developed a packaging recycling system to save… Show more Acted as project manager for the evaluating, reorganizing, and implementation of an improved pick-to-light rack system that reduced emergency replenishments by 56%. Accountable for gathering monthly data from each department, calculating facility metrics, and creating town hall presentations. Analyzed order data to assess bulk order management strategies and presented findings to upper management. Identified flow of cardboard waste and developed a packaging recycling system to save 18,000 lbs of corrugate annually. Show less

Education

  • Rochester Institute of Technology
    Bachelor of Science in Industrial & Systems Engineering, Industrial Engineering
    2008 - 2013
  • Rochester Institute of Technology
    Masters of Engineering in Sustainability, Sustainability Studies
    2008 - 2013

Community

You need to have a working account to view this content. Click here to join now