Hendry Zhang

Senior Engineer at Sambo E&C
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Singapore, SG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • South Korea
    • Construction
    • 1 - 100 Employee
    • Senior Engineer
      • Jun 2008 - Present

      1. Downtown Line Stage 1 MRT C901 Project, Marina Bay Interchange, Singapore Construction of MRT Station at Marina Bay interchanges (Marina Bay Station and 2 associate tunnels) including Diaphragm Wall, Cross wall, Bored Pile, Soil Improvement with total duration of works 24 months. 2. Downtown Line Stage 2 MRT Project C921, Little India, Singapore Construction of 2 MRT Station (Rochor Station & Little India Station) and 1 Cut & Cover Tunnel for Downtown line Stage 2, including Diaphragm Wall, Cross Wall, Bored Pile, Major Road diversion, Canal Diversion and Soil Improvement. Duration of works: 40 months. 3. Kuala Lumpur City Center Tower , Malaysia 4. Thomson East Coast Line MRT Project TEL-308, Marine Terrace Station Show less

    • Indonesia
    • Construction
    • 1 - 100 Employee
    • Site Engineer
      • Aug 2006 - Jun 2008

      1. Cipularang Highway Soldier Pile Project, Indonesia Construction of Soldier piles Ø1500 mm with capping Beam at KM 92+650 & KM 92+800 Cipularang Highway to prevent landslide 2. St Regis Hotel & Residence Project, Setiabudi Jakarta, Indonesia Construction of numerous deep foundation Bored piles up to 60m with various diameters 3. Library Office Project, Pekanbaru, Indonesia Construction of Ø 880 mm foundation Bored pile with deep sand layer using full casing method 4. Base Grouting Pile Project, Pangalengan Geothermal, Indonesia Pre-boring for Geothermal casing starter at Wayang Windu Geothermal Site 5. Marina Bay Sands Project (Casino & MICE), Singapore Construction of foundation Bored pile at 3 towers of casino and 3 towers of MICE, up to 80m depth 6. Aston Hotel Project, Bogor (Bogor Nirwana Residence), Indonesia Construction of numerous foundation Bored pile Ø800 mm at Aston Hotel Show less

Education

  • Universitas Katolik Parahyangan
    Civil Engineering
    2002 - 2006

Community

You need to have a working account to view this content. Click here to join now