Heidi Kippenhan

Senior Associate, AIA, LEED BD+C at Duda|Paine Architects
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Senior Associate, AIA, LEED BD+C
      • Mar 2019 - Present

    • United States
    • Construction
    • 1 - 100 Employee
    • Project Manager, in Project Development Group, AIA LEED BD&C
      • Feb 2018 - Feb 2019

      Project Architect for full gut renovation including major masonry structural remediation and replacement of windows for a townhouse in Brooklyn. Responsible for majority portions of design layout, systems choices, finishes, and coordination during all phases of development which required daily coordination with client and consultants. Executed drawings required for NYC DOB filings and permitting. Construction administration during demo, restructuring, stabilization, construction of major elements including new stairs and partitions.

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Architect, AIA LEED BD+C
      • Apr 2013 - Jan 2018

      PA and PM on various projects including residential, cultural and institutional for both new construction and renovation projects. 711 West End Avenue, NY, NY - PA responsible for daily coordination and communication with client and developer partner. Collaborated with interior design team to design multiple types of high end residential condos as on overbuild on existing construction. Multiple NY DOB filings and intensive coordination with consultants for all phases of design. Powerhouse Workshop - in collaboration with Herzog de Mueron with a Cultural / Manufacturing program. Architect responsible for coordination and execution of the first NY DOB filings set, including detail resolutions with HdM designs.Desales Media Center - Architect responsible for for exterior detailing with exterior wall consultant to achieve a fully coordinated exterior package bid set including roof details, drainage, custom curtain wall details, metal panel details and brick.

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Senior Designer, AIA LEED BD+C
      • Sep 2005 - Apr 2013

      Previous projects:World Financial Center - New York, NY - Commercial new construction for pedestrian passage and entrance pavilion, large scale interior renovations for public and retail zones. SD-CAVisionaire - New York, NY - Residential and environmentally savvy high rise condiminum. PreSD - CA for large scale high rise custom designed curtainwall construction. Specific detail spent on Lobby, and Roof deck amenity spaces as well as storefront and millwork designs. Leading public teaching tours of sustainable features. LEED PlatinumUniversity of Illinois College of Business - Urbana Champagne, IL - Institutional new construction using masonry and steel.Mainly construction administration including coordination with all of the major trades and bid packages for millwork.Construction sketches such as steel roof redesign coordination diagrams for the field. LEED PlatinumGodrej Headquarters - Mumbai, India - Commercial new construction. Concentration on DD package including the curtainwall design, coordination, and bid set. Revit BIM, LEEDOffice Towers - Sao Paulo, Brazil - Commercial new construction. SD and programmatic analysis and massing for amenity buildings and main lobbies as well as site analysis for traffic flow requirements. Revit BIM, LEED

    • United Kingdom
    • Design Services
    • 200 - 300 Employee
    • Intern
      • 2004 - 2005

      Assisted calculations and preparations of LEED Documentation. Modeled 3-d buildings in Ecotect for environmental analysis. Assisted calculations and preparations of LEED Documentation. Modeled 3-d buildings in Ecotect for environmental analysis.

    • Intern
      • May 2004 - Aug 2004

      FAR calculations, fixture counts, and facade SFs FAR calculations, fixture counts, and facade SFs

    • Model Maker - Intern
      • Sep 2003 - Dec 2003

      Drafted model making templates and built first stage of wooden presentation model for Holly House project. Drafted model making templates and built first stage of wooden presentation model for Holly House project.

    • United States
    • Higher Education
    • 700 & Above Employee
    • Archives / NAAB Officer
      • May 2003 - Dec 2003

      Organized and prepared student and professor work for the NAAB review. One of two students on the committee who worked directly with the Dean and the Chair. Graduate Co-Editor for InProcess publication. Organized and prepared student and professor work for the NAAB review. One of two students on the committee who worked directly with the Dean and the Chair. Graduate Co-Editor for InProcess publication.

    • Musicians
    • 700 & Above Employee
    • Assistant to the VP Classical Music
      • 2000 - 2002

Education

  • Pratt Institute
    Masters of Architecture I, Architecture
    2002 - 2005
  • University of Colorado Boulder
    BA - Biology, BA- Fine Art, Biology, Fine Arts
    1994 - 1999

Community

You need to have a working account to view this content. Click here to join now