Heber Kiaurakis

I&C Commissioning TCS (for Siemens Energy SA) at Spencer Ogden
  • Claim this Profile
Contact Information
Location
AR
Languages
  • Español Native or bilingual proficiency
  • Ingles Full professional proficiency
  • Portugués Elementary proficiency
  • German Elementary proficiency

Topline Score

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

You need to have a working account to view this content. Click here to join now
Joshua Bayliss

I contacted Heber regarding an assignment with a client of mine, in which they needed someone who could start immediately and I came across Heber's profile on LinkedIn. From start to finish, Heber was an absolute pleasure to work with and his attitude and approach to the assignment matched his impressive experience. On top of this, the feedback we received from the end client was phenomenal and so I certainly look forward to representing Heber in the near future.

Wyndell Bryant, Sr.

Heber is a take charge, plan your work, get it done type of guy. Proficient on all levels of loop checking, functional testing, and Commissioning of CT units. I Highly recommend Mr. Kiaurakis as a leader and self-starter that gets the job done, correctly, with the necessary sense of urgency and attention to details.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Start Deutsch 1
    Goethe-Institut e.V.
    Mar, 2017
    - Sep, 2024
  • Flow Meters
    Endress+Hauser Group
    Oct, 2011
    - Sep, 2024
  • ISO 9001 and ISO 10012-1
    IRAM - Instituto Argentino de Normalización y Certificación
    Feb, 2010
    - Sep, 2024
  • Control Valves
    CV CONTROL S.A.
    Sep, 2009
    - Sep, 2024
  • Relief Valves
    CV CONTROL S.A.
    Sep, 2009
    - Sep, 2024
  • Balance of Plant
    Siemens
    Jul, 2009
    - Sep, 2024
  • Steam Turbine Operation SST5-5000
    Siemens
    Jul, 2009
    - Sep, 2024
  • Instrument Calibration
    CV CONTROL S.A.
    Jun, 2009
    - Sep, 2024

Experience

    • United Kingdom
    • Staffing and Recruiting
    • 500 - 600 Employee
    • I&C Commissioning TCS (for Siemens Energy SA)
      • Feb 2022 - Present

      I&C Field Commissioning Engineer work over a Steam Turbine SST-5000, HRSGs & BOP I&C Field Commissioning Engineer work over a Steam Turbine SST-5000, HRSGs & BOP

    • I&C Commissioning TFA (for Siemens Brazil)
      • May 2021 - Dec 2021

      I&C Field Erection and Commissioning work over a Steam Turbine SST-600 I&C Field Erection and Commissioning work over a Steam Turbine SST-600

    • GT Commissioning Leader (for Siemens AG)
      • Jul 2020 - Jan 2021

      Gas Turbine SGT-4000F

    • I&C Commissioning TFA (for Siemens AG)
      • Mar 2020 - Jul 2020

      Gas Turbine SGT-4000F

    • Ireland
    • Oil and Gas
    • 200 - 300 Employee
    • I&C Commissioning TFA (for Siemens)
      • Dec 2018 - Apr 2019

      I&C Field Commissioning Specialist involved on the Loop & Functional checks, troubleshooting, calibration and Commissioning of the field measurement and control devices. Technical support on Commissioning and Startup of the auxiliary Systems and 5 x SGT-5000F Siemens Gas Turbines. I&C Field Commissioning Specialist involved on the Loop & Functional checks, troubleshooting, calibration and Commissioning of the field measurement and control devices. Technical support on Commissioning and Startup of the auxiliary Systems and 5 x SGT-5000F Siemens Gas Turbines.

    • United Kingdom
    • Staffing and Recruiting
    • 400 - 500 Employee
    • I&C Commssioning TCS (for Siemens AG)
      • Apr 2018 - Jun 2018

      I&C Field Commissioning Specialist involved on the Loop & Functional checks, troubleshooting, calibration and Commissioning of the field measurement and control devices. Technical support on Commissioning and Startup of the auxiliary Systems, Steam and Gas Turbines. Preparation and performing of the commissioning documentation according to Siemens AG quality standards at the 1015 MW (3 x SGT5-4000F +3 x SST3000 single shaft ) Ain Arnat CCPP project. Final client: SPE ( Societé de Production de L'Electricité). Show less

    • I&C Commssioning TCS (for Siemens AG)
      • Oct 2017 - Jan 2018

      I&C Field Commissioning Specialist involved on the Loop & Functional checks, troubleshooting, calibration and Commissioning of the field measurement and control devices. Technical support on Commissioning and Startup of the auxiliary Systems, Steam and Gas Turbines. Preparation and performing of the commissioning documentation according to Siemens AG quality standards at the 1015 MW (3 x SGT5-4000F +3 x SST3000 single shaft ) Ain Arnat CCPP project. Final client: SPE ( Societé de Production de L'Electricité). Show less

    • United Kingdom
    • Staffing and Recruiting
    • 1 - 100 Employee
    • I&C Fiel Specialist (for Nooter/Eriksen)
      • Sep 2017 - Oct 2017

      Responsible of the valve tuning and calibrations along all the HRSG pressure stages and BOP: it is included, auxiliary systems and HP, IP & LP stage valves. Final client: TSK Group / Tecnicas Reunidas. Responsible of the valve tuning and calibrations along all the HRSG pressure stages and BOP: it is included, auxiliary systems and HP, IP & LP stage valves. Final client: TSK Group / Tecnicas Reunidas.

    • Finland
    • Chemical Manufacturing
    • 700 & Above Employee
    • I&C Freelance
      • Nov 2016 - Mar 2017

      Responsible for daily, preventive and corrective maintenance of the entire instrumentation and control loops at the chlorine dioxide plant at KEMIRA. Responsible for daily, preventive and corrective maintenance of the entire instrumentation and control loops at the chlorine dioxide plant at KEMIRA.

    • Staffing and Recruiting
    • 500 - 600 Employee
    • I&C Erection & Commissioning TFA (for Siemens)
      • May 2016 - Oct 2016

      Responsible of the technical field advising such as instrument installation and wirings, loop and functional check executions, vibration system installation & calibration and auxiliary systems start up during the erection and commissioning stages at the 532 MW (2 x SGT2000E) Punta del Tigre CCPP project. Final client: UTE (Usinas y Transmisiones Eléctricas de Uruguay). Responsible of the technical field advising such as instrument installation and wirings, loop and functional check executions, vibration system installation & calibration and auxiliary systems start up during the erection and commissioning stages at the 532 MW (2 x SGT2000E) Punta del Tigre CCPP project. Final client: UTE (Usinas y Transmisiones Eléctricas de Uruguay).

    • I&C Freelance
      • Jun 2015 - May 2016

      Responsible for daily, preventive and corrective maintenance of the entire instrumentation and control loops at the chlorine dioxide plant at KEMIRA. Responsible for daily, preventive and corrective maintenance of the entire instrumentation and control loops at the chlorine dioxide plant at KEMIRA.

    • I&C Commissioning TFA
      • Apr 2015 - Jun 2015

      Responsible of the all instrumentation commissioning, valve calibrations, Bently Nevada vibration system test, and startup of the two Siemens SGT400. Overseen the warranty period of two units including coordination of the teams in-charged of resolving the claims and including the technical evaluation and execution of the corrective activities. Final client: CFE (Comisión Federal de Electricidad de México). Responsible of the all instrumentation commissioning, valve calibrations, Bently Nevada vibration system test, and startup of the two Siemens SGT400. Overseen the warranty period of two units including coordination of the teams in-charged of resolving the claims and including the technical evaluation and execution of the corrective activities. Final client: CFE (Comisión Federal de Electricidad de México).

    • Germany
    • Automation Machinery Manufacturing
    • 700 & Above Employee
    • I&C Commissioning TFA
      • May 2014 - Jul 2014

      Responsible of the loop & functional checks perform, Vibrometer vibration system adjustment and commissioning, control valve tuning and startup of the largest Combined Cycle Power Plant “QIPP”. Final client: SAMSUNG SC&T. DCS system: SPPA-T3000. Responsible of the loop & functional checks perform, Vibrometer vibration system adjustment and commissioning, control valve tuning and startup of the largest Combined Cycle Power Plant “QIPP”. Final client: SAMSUNG SC&T. DCS system: SPPA-T3000.

    • I&C Commissioning TFA
      • Jan 2013 - Aug 2013

      Responsible for control valve calibrations, Vibrometer vibration system setup and loop & functional check executions overall the instrumentations associated to the steam turbines and generators. Final client: MABE/MPX – Energías de Portugal (EDP). Responsible for control valve calibrations, Vibrometer vibration system setup and loop & functional check executions overall the instrumentations associated to the steam turbines and generators. Final client: MABE/MPX – Energías de Portugal (EDP).

    • I&C Tech
      • Nov 2010 - Jan 2013

      Field Instrument Technician responsible for all the preventive and corrective maintenance among site in the Electrolytic Zinc and Sulfuric Acid Plant. Field Instrument Technician responsible for all the preventive and corrective maintenance among site in the Electrolytic Zinc and Sulfuric Acid Plant.

    • Renewable Energy Power Generation
    • 700 & Above Employee
    • I&C Commissioning and Maintenance Tech
      • Apr 2008 - Oct 2010

      Instrument Technician at Siemens PG Argentina, responsible to the overall plant maintenance (GT´s, auxiliary systems, ST´s, HRSG´s and Generators), spare parts control & order, commissioning and startup of the 2 x HRSG and auxiliary systems of T.S.M 835 MW CCPP. Instrument Technician at Siemens PG Argentina, responsible to the overall plant maintenance (GT´s, auxiliary systems, ST´s, HRSG´s and Generators), spare parts control & order, commissioning and startup of the 2 x HRSG and auxiliary systems of T.S.M 835 MW CCPP.

    • I&C Tech
      • Feb 2004 - Feb 2008

      I&C Lead Field Technician responsible for loop and functional checks, commissioning, start up and support for different projects as: Terminal 6, Bunge, Molinos, Celulosa Argentina, Cargill, Basf, Nidera, Dreyfus, Kemira, AES Alicura, Plus Petrol and Coca Cola Argentina. Instruments certification, revamping, re-calibration, valves calibration & maintenance and all the related to industrial instrumentation. I&C Lead Field Technician responsible for loop and functional checks, commissioning, start up and support for different projects as: Terminal 6, Bunge, Molinos, Celulosa Argentina, Cargill, Basf, Nidera, Dreyfus, Kemira, AES Alicura, Plus Petrol and Coca Cola Argentina. Instruments certification, revamping, re-calibration, valves calibration & maintenance and all the related to industrial instrumentation.

Education

  • Instituto Superior Beppo Levi
    Analista en Sistemas de Control, I&C
    2003 - 2007

Community

You need to have a working account to view this content. Click here to join now