HE CHENGWU

Drilling Supervisor at ZPEC 中曼石油天然气集团股份有限公司
  • Claim this Profile
Contact Information
Location
Binhai, Tianjin, China, CN
Languages
  • Aribic -

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Drilling Supervisor
      • Jun 2016 - Present

      As drilling supervisor for drilling turn key project. As drilling supervisor for drilling turn key project.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Drilling DSV For ExxonMobil project
      • Sep 2015 - Jun 2016

      Supervision, consulting, coordination.

    • CWI & Workover DSV
      • Dec 2014 - Sep 2015

    • Rig manager
      • Apr 2012 - Dec 2014

      1. Work as team leader for Rig start up verifications according to Shell EP standard including operation, well control, electric equipment, HSE procedures, training matrix etc. in Rumaila base of GWDC branch in Iraq. As well negotiation directly with both management of Halliburton and Shell about HSE procedures and equipment modifications. 2. Full understanding two barriers policy in well control issue. Two barriers should be independent and pressure tested, chart recorded as well. Each step should ask “what are our two well control barriers?” 3. Full understanding advanced completion and intervention well control. 4. Full understanding Shell THINK PROCESS SAFETY. Barriers walk lines, risk assessment, trained people, and incident report and learn Show less

    • Oil and Gas
    • 1 - 100 Employee
    • Rig manager
      • Mar 2008 - Mar 2012

      1. Completion, workover, and well testing with vertical wells, deviation wells and horizontal wells including ESP, PCP, swabbing as well cementing job, milling out BP ,CR(cement retainer)and cement plug by both rotary table and power swivel. Cooperation with different third parties including Slumberger, CNLC .etc. 2. In 2011 as team leader negotiation with PDOC management for bidding for GW 238 and GW239 which worked for PDOC on Nov of 2011. I took part in full process including configuration of equipment in china, supervision of manufacture equipment in china, equipment collection in Tianjin port, customs clearance in Port Sudan, Organizing transportation from Port Sudan to well site, and completed rig start up verification and pre-acceptance inspection. Recruit and train local employee. Show less

    • manager
      • Apr 1994 - Mar 2008

      1. Well testing 2. Acid stimulation 3. Fracture 4. Sand bailing operation for Liaohe Oil field by specific drawworks with slickline. 5. Loss control materials in oil field 6. General workover in Liaohe Oil field 1. Well testing 2. Acid stimulation 3. Fracture 4. Sand bailing operation for Liaohe Oil field by specific drawworks with slickline. 5. Loss control materials in oil field 6. General workover in Liaohe Oil field

    • Production Operator
      • Jul 1991 - Apr 1994

      Worked in oil production department as production operator Worked in oil production department as production operator

Education

  • Halliburton Unversity
    2014 - 2021
  • University of China Petroleum (east china)
    Industrial Engineering
    2008 - 2010
  • Changchun petro-Geology University in Jilin Province
    Heavy/Industrial Equipment Maintenance Technologies
    1989 - 1991

Community

You need to have a working account to view this content. Click here to join now